2024 Loader Template Statement of Objectived (SOO).pdf
PDF 85 KB Posted
- Attached to
- CES Front End Loader Lease
- Solicitation number
- FA254324Q0052
About this file
This document is a Statement of Objectives (SOO) for a six-month lease of a 4-yard front-end loader to support snow removal operations at Buckley Space Force Base. The key details are:
The U.S. Air Force 460th Contracting Squadron is issuing a Request for Quote (RFQ) under Solicitation Number FA254324Q0052 to procure four (4) 4-yard front-end loaders, with a required delivery date of November 1, 2024. The loaders must be 4-wheel drive, have a closed cab with heat/AC, and be a John Deere 644 or equivalent model manufactured in 2018 or later. The contractor shall respond to any service/repair calls within 24 hours. Quotes are due by 3:00 PM MDT on September 12, 2024, and must include a statement of work, warranty details, and company information. Questions are due by 10:00 AM MDT on September 10, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
US Space Force
Front-End Loader Six-Month Lease for Snow Removal
Current as of 9 September 2024
1. SCOPE:
1. The government requires a 4-yard front end loader to enhance the safety of base personal and equipment during winter months.
2. REQUIREMENT:
Product
Quantity
John Deere 644 or equivalent front-end Loader 4.0-4.9 Cubic yard 6 Months
4 Cubic Yard Front End Loader Transportation Cost 1 Each
3. SPECIFICATIONS:
•Loader Shall have a 4-4.9 Cubic yard bucket.
•Loader Shall be 4-wheel drive.
•Loader Shall be closed cab with heat and air conditioning.
•Loader Shall be a John Deere 644 or equivalent.
•Loader, if possible, ACS industries, Inc #70 Pro-series front coupler attachment.
•Loader shall be manufactured in the year 2018 or newer.
•Upon service repair call, contractor shall respond within 24 hrs.
4. DELIVERY:
Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements on November 1st 2024.
Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.
File details come from the government source that posted it. Updated .