2024 Front End Loader Statement of Objectived (SOO).pdf
PDF 85 KB Posted
- Attached to
- CES Front End Loader Lease
- Solicitation number
- FA254324Q0052
About this file
This document is a Statement of Objectives (SOO) for the U.S. Space Force's requirement of a 4-yard front-end loader for a 6-month lease to support snow removal operations at Buckley Space Force Base. The government requires 4 units of a John Deere 644 or equivalent front-end loader with specific technical specifications, including a 4-4.9 cubic yard bucket, 4-wheel drive, closed cab with heat/AC, and manufactured in 2015 or newer. The contractor must deliver the loaders by September 30, 2024, and provide 24-hour response time for any service repairs. This SOO is associated with RFQ FA254324Q0052, which provides additional details on the procurement, including a response deadline of September 12, 2024, and instructions for submitting quotes that must include a statement of work, warranty information, and company details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
US Space Force
Front-End Loader Six-Month Lease for Snow Removal
Current as of 10 September 2024
1. SCOPE:
1. The government requires a 4-yard front end loader to enhance the safety of base personal and equipment during winter months.
2. REQUIREMENT:
Product
Quantity
John Deere 644 or equivalent front-end Loader 4.0-4.9 Cubic yard 6 Months
4 Cubic Yard Front End Loader Transportation Cost 1 Each
3. SPECIFICATIONS:
•Loader Shall have a 4-4.9 Cubic yard bucket.
•Loader Shall be 4-wheel drive.
•Loader Shall be closed cab with heat and air conditioning.
•Loader Shall be a John Deere 644 or equivalent.
•Loader, if possible, ACS industries, Inc #70 Pro-series front coupler attachment.
•Loader shall be manufactured in the year 2015 or newer.
•Upon service repair call, contractor shall respond within 24 hrs.
4. DELIVERY:
Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements on September 30th 2024.
Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.
File details come from the government source that posted it. Updated .