Atch_1_-_Grounds_Maintenance_PWS.pdf

PDF 388 KB Posted

Attached to
Grounds Maintenance Re-Acquisition at Buckley AFB Federal contract opportunity
Solicitation number
FA254320R0002
Issued by
Department of the Air Force Space Command

About this file

This is a solicitation for grounds maintenance services at Buckley Air Force Base in Colorado. The contractor shall provide all personnel, equipment, tools, materials, supervision and other items necessary to maintain improved, semi-improved, and unimproved grounds. Work includes mowing, edging, trimming, weed control, irrigation maintenance, debris removal, fertilization, aeration, pest control, maintenance of vegetative beds and drainage ditches, and tree pruning. The requirement is set aside for HUBZone small businesses. The contract type is firm fixed price for one base year and four option years. Proposals are due by November 25, 2019. The award will be made to the responsible offeror with the lowest price that meets technical acceptability. Evaluation factors are technical acceptability, price, and past performance.

Attachment 1 - Grounds Maintenance Performance Work Statement

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUNDS MAINTENANCE

PERFORMANCE WORK STATEMENT (PWS)

8 August 2019

Prepared by Buckley Air Force Base

TABLE OF CONTENTS

1 DESCRIPTION OF SERVICES

1.1 Maintain Improved Grounds

1.1.1 Mow

1.1.2 Edge

1.1.3 Trim

1.1.4 Weed Control

1.1.5 Irrigation

1.1.6 Remove debris/police grounds

1.1.7 Leaf removal

1.1.8 Lawn Conditioning

1.1.9 Pest control

1.1.10 Lawn Renovation

1.1.11 Prune Shrub, Hedges and other Plants

1.2 Maintain semi-improved Grounds

1.2.1 Mow

1.2.2 Trim

1.2.3 Perimeter Fence Line

1.3 Maintain un-improved grounds

1.4 Maintain vegetative beds, inert beds, rock beds and related areas

1.5 Maintain surface drainage ditches

1.6 Perform snow/ice removal (reserved)

1.7 Special requirements

1.7.1 Trees

1.7.2 Emergency and special events services

1.7.3 Xeriscaping and Urban Forest Services

1.7.4 Special Cuts

1.7.5 Planting trees, shrubs, and vegetative beds

2 SERVICE SUMMARY

2.1 Quality Control

2.2 Quality Assurance

2.2.1 Periodic Validations

2.2.2 Periodic Progress Meetings

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 Facilities

3.1.1 Laydown Space

3.2 Utilities

3.3 Security, Fire , and Medical Services

3.4 Telephone

3.5 Solid Waste Collection and Disposal

4 GENERAL INFORMATION

4.1 Mission

4.2 Damages To Government Buildings, Equipment, or Vegetation

4.3 Environmental Requirements

4.3.1 Hazardous Materials

4.3.2 Spill controls

4.3.3 Pesticides

4.3.4 Hazardous Materials Inventory

4.3.5 Hazardous Materials Management

4.3.6 Final Report

4.3.7 Hazardous Materials Reduction

4.3.8 Wetland Areas

4.3.9 Reserved

4.3.10 Restoration Sites

4.4 Permits, Licenses and Certifications

4.4.1 Projects Over An Acre

4.4.2 Municipal Separate Storm Sewer System

4.5 Hours of Operation

4.6 Recognized Holidays

4.6.1 Base Closures

4.7 Security Requirements

4.8 Performance of Service During Crisis or Heightened Security

4.9 Special Qualifications

4.10 Interfaces

4.11 Contracting Officer and Contracting Officer Representative (Quality Assurance Personnel) .. 25

4.12 Ground Concerns and Work Clearance Requests

4.13 Safety Requirements and Reports

4.14 Schedules

4.14.1 Schedule Changes

5 Appendices

1 DESCRIPTION OF SERVICES

The Contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Air Force Base (AFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. Areas, maps and workloads depicting the service described in this PWS are identified in the Appendices. The Contractor’s performance will be based on the Contracting Officer’s Representative (COR), and Contracting Officer’s (CO) evaluation of the results required by the Service Summary (SS) and not the method of performance. The evaluation of results will be based on COR surveillance, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.

The growing season at Buckley AFB is considered to be 1 April through 31 October. All damage caused by the Contractor or its employees to government property and personal property (to include facilities, fences, equipment, trees and shrubs, etc.) due to Contractor operations shall be repaired or replaced by the Contractor within 15 days after identification/notification at no additional cost to the Government. If a plant should die or become unhealthy due to damage, the Contractor will be responsible for replacing the damaged plant with a plant of same size and type. Plant replacement shall occur within 15 days after identification or notification.

All fence lines shall be trimmed to prevent vegetation growth in the fence, including removal of vegetation growing up the links of the fence. All areas shall be trimmed concurrent with mowing. Application of nonselective herbicides to control grass, weeds and vegetation around obstacles to include fence lines, shall only be allowed with the COR approval. The contractor shall utilize equipment that will not cause rutting in the grounds area during mowing operations.

The contractor shall maintain all standards identified in this PWS during dry or rainy season.

1.1 MAINTAIN IMPROVED GROUNDS

Improved grounds are identified in Appendix A (Grounds Description / Workload Estimates) and B (Buckley Air Force Base Map).

1.1.1 MOW

The contractor shall mow all improved grounds to look well-manicured, with a neat and professional appearance. Maintain grass height between 2 and 4 inches uniform in appearance, free of skips, gaps, rutting, or scalping. The contractor shall be required to pick up debris, natural and manmade, prior to mowing any area. The contractor shall remove or mulch grass clippings when visible after mowing, before leaving work area. Removed debris shall be disposed of in accordance with the base’s solid waste management plan.

1.1.2 EDGE

The contractor shall edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the improved grounds so that grass height matches surrounding area grasses.

Edging shall include removal of vegetation from expansion joints and cracks in sidewalks, driveways, curbs and other hard surfaces. Grass, vegetation and weeds shall be cut back no more than ½-inch from the surface edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping, rutting, and uneven or rough cutting.

1.1.3 TRIM

The contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. The contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.

1.1.4 WEED CONTROL

Control weeds in improved grounds through execution of a weed control program appropriate for the area to maintain a professional appearance. Restore grounds made barren where weeds are removed to the level of care of the surrounding area (i.e. semi-improved, improved, etc.). The Contractor shall use only approved pesticides as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para

4.7.4 and 4.7.6. All pesticides, herbicides, and rodenticides are defined in DoD and Air Force documents. The Contractor shall comply with current federal, state, local, DoD, and Air Force regulations, plans, and policies. The contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards, 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts, 40 CFR 150-189, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The Contractor shall ensure that all workers have current state certification for the pest control services being performed. Installation Pest Management Coordinator (IPMC) must approve all herbicides prior to use. All pesticides used must be on the installation-approved inventory list and applied by certified personnel.

1.1.5 IRRIGATION

The contractor shall maintain, adjust, and repair existing lawn irrigation systems during the growing season.

1.1.5.1 OPERATION OF IRRIGATION SYSTEMS

The Contractor shall irrigate improved grounds to maintain the health of the turf ensuring no ponding of water, excessive runoff, etc. This includes lawns, plants, flowers, landscaped areas, and all areas requiring manual watering (see Appendix A and B). Contractor shall position hoses, etc., for manual watering and then remove/store hoses, etc., between watering to ensure neat, clean appearance of areas. The Contractor is prohibited from connecting to any hydrant within the boundaries of the installation without prior approval. Contact COR for approval coordination. Contractor shall practice water conservation measures whenever possible and shall position all watering systems to avoid overspray onto pavements, sidewalks, roadways, etc. Watering shall be performed primarily during nighttime hours. Watering shall follow Aurora City watering recommendations as listed in Appendix F. For additional information and resources, reference auroawater.org. If daytime watering is necessary, Contractor shall notify the CO or COR of the reason for daytime watering, and the duration daytime watering will be in progress. Irrigation responsibilities also include setup, monitoring, adjusting, etc., of irrigation system computer, clocks/timers, controllers, pumps, etc. Contractor shall be responsible for day-to-day operation of the base-wide automated irrigation system. Buckley has a centralized master irrigation controller in building 1022. Contractor is to manage controller and provide reports to COR monthly.

1.1.5.2 MAINTENANCE OF IRRIGATION SYSTEMS

The Contractor shall maintain irrigation systems. Maintenance includes but is not limited to draining and charging systems; replacing damaged or broken control / valve devices, solenoids, sprinkler heads; and repair of ruptured pipes. Maintain equipment and systems to be efficient and in good operational working order. Provide COR with monthly schedule for each controller that lists the past month’s operating times and frequencies per zone with scheduled start times.

Coordinate with COR to ensure progress towards Air Force water use reduction goals. Existing controllers may be retrofitted or complimented with Radio Frequency (RF) controllers capable of communicating with master controller. Controller replacement, retrofitting or RF complimenting shall be accomplished by work order issued by CO on a NTE CLIN basis. The irrigation system to be maintained and related workload data is identified in Appendix A, B, and F.

1.1.5.3 WINTERIZATION OF IRRIGATION SYSTEMS

At the end of the growing season of each year, all the irrigation systems shall be winterized by closing off the primary irrigation control valve and utilizing compressed air to remove all water from the irrigation system. Winterization shall be coordinated with COR to ensure backflow preventers are also winterized or removed. The Contractor shall tag the irrigation system shut off valve with the following information: “system winterized,” the date, and performed by. Repairs to irrigation equipment must be accomplished prior to winterization.

Contractor to activate and winterize all 460th Space Wing irrigation systems located within the improved areas represented in Appendices B and G. The Contractor shall remove insulation from exposed pipes and activate the system after danger of freezing has passed and when necessary for plants, trees and grass to start receiving water. The Contractor shall clean, rebalance, and repair the system as necessary to reestablish the irrigation capability each spring. Any landscape damaged during the winterization of the irrigation system shall be returned to its previous state within an appropriate time to accomplish the repair or replacement as determined by the COR. The Contractor shall ensure that the irrigation system is fully-winterized in order to prevent damage to the system when the system is re-activated. The Contractor shall schedule and coordinate the spring activation and winterization of the irrigation systems with the COR.

1.1.5.4 REPLACEMENT OF IRRIGATION SYSTEM PARTS

Replacement of pumps, zone controllers, clocks/timers, master controllers or backflow prevention devices, RF controllers is not included in routine maintenance of irrigation systems, replacement shall be on a case-by-case basis. When replacement of these irrigation system parts is necessary, the Contractor shall submit an estimate to CO and COR that outlines the time and materials required to accomplish the repair. This work shall be accomplished by work order issued by the CO on a NTE CLIN. The parts, equipment, and materials required to accomplish the repair shall be in compliance with industry standards. Any work performed on the irrigation system must be accomplished by a fully-trained and certified technician. The Contractor must immediately notify CO or COR when the work necessitates any utility outages to BAFB but must be at a minimum of (2) two weeks prior to outage. Once the work has been completed and approved by COR, the Contractor shall submit an invoice to the CO and COR that outlines the accumulation of time and materials, excluding all profit and overhead costs. If any funding remains after the period of performance of the associated CLIN is complete, then the funding will be de-obligated.

1.1.5.5 BACK-UP IRRIGATION

During periods of prolonged irrigation system breakdown, vulnerable trees and plantings shall be watered using a hose and/or truck. No vegetation shall be allowed to die because of lack of capability or effort. The COR shall be notified immediately if an irrigation system breaks down and back-up irrigation is required. Also, if an area is considered to be Improved Grounds, and an irrigation system is not currently in place, then the area must be watered using alternative methods.

Equipment necessary to accomplish back-up irrigation will be provided by the Contractor. Water can be obtained from Government-approved sources; however, the Contractor shall monitor water usage and provide monthly meter reports to 460th CES/CEOES Service Contracts Element. Non-potable water sources will not be used at this time.

1.1.5.6 MAINTAIN BACKFLOW PREVENTERS

The Contractor shall ensure all backflow preventers, check valves, and shut-off valves to irrigation systems are inspected, calibrated, certified, and operate in accordance with all applicable State and Federal regulatory standards. The Contractor shall maintain a record of all backflow preventer component calibration, testing, certification, and documentation in accordance with all applicable Air Force Instructions. The Contractor shall provide a copy of all backflow preventer maintenance records annually to the COR (364 days from NTP) and upon completion of contract.

1.1.5.7 BACKFLOW PREVENTION DEVICE TESTING AND CERTIFICATION

The Contractor shall ensure that backflow prevention device (BPD) testing and certification is accomplished annually during spring activation. Test and certify BPDs meet the requirements of ANSI/ASSE Standard 1020. Documentation shall be provided to COR upon completion and shall be maintained by the Contractor accordingly.

1.1.5.8 WINTER WATERING OF TREES

The Contractor shall be responsible for the watering of trees, shrubs, etc. during the period in which the irrigation system is winterized to guarantee their survival until activation of the irrigation system in the spring.

1.1.5.9 PERIODS OF DROUGHT

During drought conditions, the Contractor shall ensure that all trees and shrubs in improved areas receive sufficient water to survive.

1.1.6 REMOVE DEBRIS/POLICE GROUNDS

The contractor shall perform general litter patrol in areas of improved grounds identified in Appendix A and B. Remove and dispose of natural debris, (tree limbs, dry brush, rodent habitats, dead animals, etc.), and man-made debris. Police areas to maintain a neat and professional appearance.

1.1.7 LEAF REMOVAL

The contractor shall remove leaves in improved areas to maintain a neat and professional appearance. Leaf removal must be completed within four days upon issue of the work order by the CO or COR. Leaves must be disposed in accordance with the base solid waste management plan.

1.1.8 LAWN CONDITIONING

1.1.8.1 FERTILIZATION

The Contractor shall have a pH adjustment and fertilizer application program. The Contractor shall perform a laboratory test of the soil in improved grounds and apply fertilizer and lime using procedures appropriate for the soil conditions found, type of grass, and season as recommended by the Colorado State University Extension Service (www.ext.colostate.edu). Provide test results to COR to average at least two sample locations per building. List results by building number.

Coordinate with COR using test results and Colorado State University Extension Service recommendations to determine optimum amendment and fertilizer application levels. Apply fertilizer and other soil amendments to bring soil condition to that suitable for the vegetation being treated. Apply amendments and fertilizer twice annually (generally spring and fall) unless testing and recommendation, as coordinated with COR, determines once annual application is sufficient. Weed and Feed Fertilizers are not authorized for use.

1.1.8.2 AERATION

The contractor shall aerate lawns on improved grounds (identified in Appendix A and B) once per year during the month that best suited for the grounds and type of grass. Aeration shall be performed with a core aerator to remove soil plugs at a minimum of 4 inches deep and 2-3 inches apart. Plugs will be left on the lawn to disintegrate.

1.1.9 PEST CONTROL

The contractor shall provide all management, licenses, laboratory testing, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan in the areas covered by this Grounds Maintenance PWS in a manner that will ensure the health and general well-being of installation personnel. The following types of are common on this installation and their abatement should be specifically addressed the IPM plan and use to determine the workload: Voles, prairie dogs, rabbits, wasps, bees, beetles, borers, aphids, ants, fungi, mice, rats, etc. The Contractor shall use only approved pesticides as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para 4.7.4 and 4.7.6. All pesticides are defined in DoD and Air Force documents. The Contractor shall comply with current federal, state, local, DoD, and Air Force regulations, plans, and policies. The contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards, 29

CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts, 40 CFR 150-189, Protection of Environment, Pesticide Program, and 49 CFR 171, Transportation, General Information, Regulations, and Definitions. The Contractor shall ensure that all workers have current state certification for the pest control services being performed. Installation Pest Management Coordinator (IPMC) must approve all herbicides prior to use. All pesticides used must be on the installation-approved inventory list and applied by certified personnel.

Control weeds in improved and semi-improved grounds through execution of a weed control program with the use of herbicides. Weeds in mulch and rock beds will be controlled with herbicides and / or pulled to maintain a weed free presentation no less than (NLT) 2 X per month. If weeds cannot be controlled with the 2 X per month guideline, then broadcast treatment with a pre-emergent herbicide will be utilized for future years on the contract. Weeds will be cut / sprayed or pulled in turf if over 3 inches to maintain a professional appearance. Restore grounds made barren where weeds are removed to the level of care of the surrounding area. Control rodents in improved grounds with pesticides and backfill exposed holes with soil to prevent further infestations and safety issues.

1.1.9.1 PAVED AREAS

The Contractor shall eliminate all weeds and crack grass from all paved surfaces in or directly adjacent to improved areas (identified in Appendix A and B), including curbing. If chemical control is used, Contractor shall exercise reasonable effort to control and minimize run-off.

Weeds shall be controlled with herbicides and / or pulled to maintain a weed free presentation. In addition, a soil sterilant may be used in conjunction with a nonselective herbicide with IPMC approval to help suppress repeat pesticide applications.

1.1.10 LAWN RENOVATION

The contractor shall renovate lawns in improved and semi-improved grounds as identified by the CO or COR. This work will be issued via a separate work order. Renovate deteriorated lawn area to match surrounding areas. The Contractor shall renovate lawns in improved grounds as identified by the CO or designated representative. Lawn renovation may be categorized as repairing existing lawn areas, or removing lawn areas and replacing the areas with xeriscape landscaping. This work will be issued via a separate work order on a NTE CLIN. Renovate deteriorated lawn area to match surrounding areas or with xeriscape landscaping as approved by COR. Once the work has been completed and approved by COR, the Contractor shall submit an invoice to the CO and COR that outlines the accumulation of time and materials, excluding all profit and overhead costs. If any funding remains after the period of performance has terminated, then the funding will be de-obligated. If lawn areas are damaged by fault of the Contractor, then the Contractor is responsible for the renovation at no additional cost to the Government.

*NOTE: The Contractor must also submit a local Base Civil Engineer Work Clearance Request or Digging Permit see PWS section 4.12 (AF Form 103 {electronic copy available upon request}) in order to obtain approval prior to moving or disturbing soil on BAFB. The Contractor must immediately notify CO or COR when the work necessitates any utility outages to BAFB. Coordinate all outages with 460 CEOES

1.1.11 PRUNE SHRUB, HEDGES AND OTHER PLANTS

The Contractor shall prune or trim all trees as necessary. The Contractor shall be responsible for identifying all trees that require pruning or trimming. Pruning or trimming shall be accomplished in accordance with the American National Standards Institute ANSI A300 Part 1 industry standards. Pruning shall be required to lift, remove, and/or cutback branches that conflict with normal traffic or safety. In addition, the Contractor shall prune or trim trees that pose public safety hazards. Minimum safety clearances are: 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, 4 feet over buildings, and 1 foot from buildings. Trees that pose threats to structures or buildings shall be removed. Topping and de-horning are not permitted. Trimming or pruning of trees that touch or hang over energized utility poles or power lines is the responsibility of the Contractor. Minimum clearance from primary lines (over 600 volts) shall be 8 feet. Minimum clearance from secondary lines (under 600 volts, i.e. electric service drops, telephone, and cable TV) shall be 4 feet. Contractor shall be responsible for removing all debris generated from trimming or pruning operations. This service is issued as a work order and must be completed within five (5) workdays from notification. The Contractor shall cut all ornamental grasses in the fall to ensure proper growth the following growing season. The Contractor shall prune/trim shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant.

Hedges shall be maintained to their natural mature height and shape. Shrubs, plants, hedges, and ground cover/vines shall be pruned/trimmed 3 inches away from buildings, fences, curbing, sidewalks, and other fixed obstacles. All ground cover and plants shall be kept within the bed borders. All plants around landscape and ground lights shall be pruned/trimmed to allow light usage for its intended purpose. Shrubs and hedges located on street corners, curb easements, etc. shall be pruned/trimmed to keep from obstructing view of oncoming traffic. Areas beneath shrubs and hedges shall be kept free (clean) of all grass, weeds, vegetation, and debris. Shrubs directly adjacent to buildings shall be no higher than the bottom of the building’s ground floor window sills. Volunteer tree growth seedlings shall be removed, not sprayed at no additional cost to the Government.

1.2 MAINTAIN SEMI-IMPROVED GROUNDS

Semi-improved grounds are identified in Appendix A (Grounds Description / Workload Estimates) and Appendix B (Buckley AFB Grounds Map).

1.2.1 MOW

The contractor shall maintain grass height between 4 and 10 inches in all semi-improved grounds areas. Maintain a uniform appearance in all areas. Where possible, maintain adjacent areas at or near the same grass heights. Equipment wash-down will be accomplished immediately at a designated location by COR to prevent the spread of noxious weeds into clean areas of the base.

1.2.2 TRIM

The Contractor shall trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots bumper blocks, boulders, curbs, sidewalks, street edges and other fixed obstacles and temporary obstacles/objects on semi-improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. The

Contractor shall mulch or remove grass clippings when visible after trimming, before leaving work area.

1.2.3 PERIMETER FENCE LINE

The contractor shall maintain a 6ft strip on each side of the perimeter fence (12 ft. total) as Semi- Improved Grounds. The Contractor shall remove debris along fence line. Dispose of natural debris, (tree limbs, dry brush, rodent habitats, etc.), and man-made debris to maintain a neat and professional appearance on a quarterly basis. The fence line is identified in Appendix A.

1.2.3.1 REPAIR PRAIRIE DOG FENCING

The Contractor will inspect the prairie dog fencing that is installed on the perimeter fence line for holes quarterly. All holes that are 1 1/2” or bigger will be marked with marking tape and briefed to the COR to schedule repairs.

1.3 MAINTAIN UN-IMPROVED GROUNDS

Un-improved grounds are identified in Appendix A (Grounds Description / Workload Estimates) and B (Buckley AFB Grounds Map). These areas exist in a dry-land state and receive maintenance only as it relates to the control of weeds, pests, and fire prevention, etc. The Contractor shall maintain grass and vegetation in un-improved grounds to prevent woody encroachment. They shall mow un-improved grounds up to once per year, according to the discretion and coordination of the COR, to a height of 10” - 14”. Contractor is to cut and remove vegetation in ditches, low areas, and around trees/shrubs before they reach 14” in height. Equipment wash-down will be accomplished immediately at a designated location by COR to prevent the spread of noxious weeds into clean areas of the base.

1.4 MAINTAIN VEGETATIVE BEDS, INERT BEDS, ROCK BEDS AND RELATED AREAS

The Contractor shall maintain vegetative beds, inert beds, and related areas in both improved and semi-improved areas as identified in Appendix A (Grounds Description / Workload Estimates) and B (Buckley AFB Grounds Map) to present a neat and professional appearance.

Maintenance activities may include but are not limited to cutting all ornamental grasses in the fall to ensure proper growth the following growing season, fertilizing, watering, weeding, mulching, amending soil, monthly dead stem, leaf, and petal removal, repairing and maintenance of micro or other bed irrigation, and repairing or replacing of damaged plants, weed barrier, and shrubs.

When replacing plants, weed barrier, shrubs, and performing repairs, conform to good xeriscaping practices for the area. Weeds in mulch and rock beds will be controlled with herbicides and / or pulled to maintain a weed free presentation no less than 2 X per month. If weeds cannot be controlled with the 2 X per month guideline, then broadcast treatment with a soil sterilant may be used instead of a nonselective herbicide or a pre-emergent herbicide. This will help suppress repeat pesticide applications. This is for semi-improved areas as represented on the official grounds map dated 1 May 2018. Restore grounds made barren where weeds are removed to the level of care of the surrounding area.

1.5 MAINTAIN SURFACE DRAINAGE DITCHES

The Contractor shall upon notification by the CO or COR through the issuance of a work order, perform all maintenance tasks on surface drainage ditches to ensure the flow of storm water runoff is in a manner that is not impeded and/or the water quality is not degraded by pollutants according to applicable regulations. The maintenance tasks may include any combination of clearing litter/trash (i.e., water-quality pollutants), clearing natural or man-made or foreign debris such as dead vegetation , silt, sediment (i.e., water-quality pollutants); reshaping ditch lines/grades to eliminate ponding; filling rills or gullies with clean soil; seeding and placing sod for bare areas; and restore/renovate grounds. Maintenance tasks may also include restoring the effectiveness of rip rap to properly dissipate energy of runoff flows to minimize erosion, rip rap removal, installation of bedding fabric/blankets, and/or rip rap placement/replacement. This service is issued as a work order and must be completed within five (5) workdays from notification. Also, maintenance tasks may address drainage ditch appurtenances including culverts, or drain pipe inlets/outlets, or area inlets, or detention ponds. Such work may include any combination of clean out of litter/trash and/or silt/sediment, installation of bedding fabric/blankets or equivalent erosion control best management practices; or reshaping earth lines/grades to eliminate ponding; or filling rills or gullies with clean soil; or seeding bare ground; or restore/renovate grounds.

1.6 PERFORM SNOW/ICE REMOVAL (RESERVED)

1.7 SPECIAL REQUIREMENTS

All work under this section shall be executed via a work order by the CO or COR (except for areas, referring to, “the contractor shall identify ……”). The contractor shall be responsible for removing all debris generated from all trees related operations. All non- emergency work order shall be completed within five (5) workdays from the work order date unless noted otherwise within subsections.

1.7.1 TREES

The contractor shall identify trees that pose public safety hazards or threats to structures/buildings. These hazards include minimum safety clearances, which are: 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, 4 feet over buildings, and 1 foot from buildings.

Topping and de-horning are not permitted. Trimming or pruning of trees that touch or hang over energized utility poles or power lines is the responsibility of the contractor. Minimum clearance from primary lines (over 600 volts) shall be 8 feet. Minimum clearance from secondary lines (under 600 volts, i.e. electric service drops, telephone, and cable TV) shall be 4 feet.

1.7.1.1 TREE CARE

The contractor shall brace, cable, guy (to keep tree vertical), and deep water all damaged trees after identification. The contractor shall remove all guy wires, cables, straps, and stakes when the trees remain vertical (normally, after one growing season). The contractor shall adjust wires, cables, and straps as required, to prevent girdling.

1.7.1.2 TREE STANDARDS

The contractor shall perform all tree work in accordance with contract specifications and the following tree care standards, latest addition, unless otherwise directed by the CO.

• ANSI A300 - Standard Practices for Tree Care Operations including referenced Combined Federal Regulations (Utility Pruning and Emergency Service Restoration)

• ANSI A300 (Part 1) – Tree Pruning

• ANSI A300 (Part 3) – Tree Support Systems (Cabling, Bracing, and Guying)

• ANSI Z60.1 – American Standards for Nursery Stock

• ANSI Z133.1 – Safety Requirements for Tree Care Operations

1.7.1.3 EMERGENCY SPOT PRUNING/TRIMMING

The contractor shall complete an emergency spot pruning/trimming within one (1) workday from the work order date. Typically, emergency spot pruning/trimming includes removal of dead and/or broken limbs or removal of limbs for required clearances.

1.7.1.4 TREE AND STUMP REMOVAL

The contractor shall perform stump and perimeter roots removal by completely removing, by cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall be ground within one (1) workday of the work order. Stump-grinding debris shall be removed the same day grinding is performed. The Contractor shall backfill with topsoil, and lay sod to match the existing ground grade and the type of grass. The Contractor shall maintain the patch area IWA with manufacturer’s recommendation until the grass has become established.

Trees identified for removal shall be considered within the following categories, Large, Medium, Small and Sapling, as based on their diameter. The diameter of the tree shall be determined by measuring 4.5 feet above the ground. Trees with multiple trunks shall be measured as follows:

All trunk diameters shall be measured. The largest trunk diameter shall be recorded. Each remaining trunk diameter shall be halved. All values will then be added together to obtain the final tree diameter.

• Large Trees: Diameter 36” and above, remove within 10 workdays from the work order date.

• Medium Trees: Diameter 24” to less than 36”, remove within 10 workdays from the work order date.

• Small Trees: Diameter 3” to less than 24”, remove within 5 work days from the work order date.

• Saplings: Diameter 3” and smaller, remove within 2 workdays from the work order date.

1.7.1.5 EMERGENCY TREE AND STUMP REMOVAL.

The following timeframe shall be apply for emergency tree and stump removal by the contractor:

• Large Trees: Remove within 2 workdays from the work order date

• Medium Trees: Remove within 2 workdays from the work order date

• Small Trees: Remove within 1 working day from the work order date

1.7.2 EMERGENCY AND SPECIAL EVENTS SERVICES

The Contractor shall, upon notification by the CO or COR through the issuance of an oral or written work order, perform emergency or special event grounds maintenance service. Upon notification of an emergency, the contract manager shall respond within one (1) hour to meet with the CO and Government evaluator and initiate emergency services. Upon receiving direction by the CO, Contractor personnel shall begin emergency work within (2) two hours.

Oral work orders for emergency services to minimize damages or mitigate hazardous conditions will be confirmed with written work orders. The CO will notify the Contractor as soon as a special event requirement is known, but no less than 24 hours prior to the event.

1.7.3 XERISCAPING AND URBAN FOREST SERVICES.

The Contractor shall upon notification by the CO or COR through a work order, perform xeriscaping and / or urban forest design and installation services.

1.7.4 SPECIAL CUTS.

The Contractor, upon notification by CO or COR through a work order, shall perform special cuts. Special cuts/mowing include any combination of mowing, edging, trimming, clearing litter / foreign debris, or other grounds-type work identified in the PWS. Special event areas shall be serviced within 24 hours prior to start of the special event.

1.7.5 PLANTING TREES, SHRUBS, AND VEGETATIVE BEDS.

The Contractor shall, upon notification by the CO or COR through the issuance of a work order, perform planting of trees, shrubs, and vegetative beds to include but not limited to: removal and disposal of trees, shrubs, or vegetative beds being replaced; and performance of maintenance after planting to include establishing a tree mulch ring, watering, and insect and disease prevention to promote survivability. Apply deep-root injection to improved / semi-improved trees using an organic balanced fertilizer combined with micorrhizae and humic acids. A systemic insecticide will be added in the spring treatment to prevent insect damage. The Contractor shall treat trees to eliminate harmful pests such as fungi, borers, beetles, weevils, scales, plant bugs, mealy bugs, aphids, etc. The Contractor will maintain mulch rings around trees in improved / semi-improved areas. A ring of 3-4 inches thick of mulch will be maintained to tree’s drip line and pulled back several inches from trunk. Herbicide will be sprayed on mulch ring to maintain a weed-free appearance. The Contractor shall brace, cable, guy (to keep tree vertical), and deep water all trees within improved and semi-improved areas which require such for healthy growth. The Contractor shall remove and dispose of all guy wires, cables, straps, and stakes when the trees remain vertical (normally, after one-two growing season). The Contractor shall adjust wires, cables, and straps as required, to prevent girdling. The Contractor shall install and maintain appropriate tree guards in order to effectively prevent rodent and animal damage to tree and shrub trunks, including their root systems, within the improved and semi-improved areas. When repellents are used, they shall be handled and reported as any other application of chemicals noted in this PWS.

*NOTE: COR or IPMC shall determine the appropriateness of the tree guard. The Contractor shall wrap from the base to the first limb of all young deciduous trees three-and-one-half (3- 1/2) inches in diameter or less or 4” or bigger that experience sun scalding. Never use burlap to wrap tree trunks, as it can trap moisture and cause fungal or bacterial problems. Remove the trunk wrap after (2) two years. The Contractor shall perform all tree work in accordance with contract specifications and the following tree care standards, latest addition, unless otherwise directed by the CO. Shrubs and trees that are acceptable candidates for planting are located in Installation Development Plan.

2 SERVICE SUMMARY

The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each work shall be allowed in an effort to identify normal phase-in problems.

PWS

Section Performance Threshold

Method of Surveillance

PO-1 - Maintain Improved Grounds 1.1

Excellent: 0 defects Customer Complaint;

100% Inspection;

Periodic Validation

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects Unsatisfactory: More than 5 defects

PO-2 - Maintain Semi-Improved Grounds 1.2

Excellent: 0 defects Customer Complaint;

100% Inspection;

Periodic Validation

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects

PO-3 - Maintain BASH (Reserved/NA) 1.3

N/A

N/A N/A N/A N/A N/A

PO - 4 Maintain Unimproved

Grounds 1.4 Satisfactory : 1 defect 100% Inspection

PO-5 - Maintain Vegetative Beds, Inert Beds and related Areas

1.5

Excellent: 0 defects

100% Inspection

Very Good: 1 defect Satisfactory : 4 defects Marginal: 5 defects

2.1 QUALITY CONTROL

The contractor shall provide a written description of the quality control system to include identification of the commercial practices and procedures to be used, such as those of the Professional Grounds Management Society (PGMS), Tree Care Industry Association, American Society of Landscape Architects, the American National Standards Institute (ANSI), and local Extension Offices of the Federal Cooperative Extension Service. Include the inspection system requirements of FAR 52.246-4 in this document. The contractor shall develop and implement procedures to identify, prevent, and ensure non-performance and continual repeat of defective service does not occur. A written Quality Control Plan shall be submitted to the contracting officer for review and feedback. The plan shall be submitted no later than the pre-performance conference. The plan shall specifically address the contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.

2.2 QUALITY ASSURANCE

The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The CO or COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The CO or COR will use the contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the Contracting Officer a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the Contracting Officer within 1 calendar days of receipt.

2.2.1 PERIODIC VALIDATIONS

This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re- perform the service after notification by the CO or COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any (1) one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any (2) two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.

2.2.2 PERIODIC PROGRESS MEETINGS

The CO, Functional Commander, COR, other Government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections, and trends against each performance objective observed, positive performance, and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. The CO or COR shall type up the meeting minutes. The meeting minutes shall be signed by the CO and any other signatures deemed appropriate before being distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 FACILITIES

The Government will provide the facilities identified below for contractor use in support of the requirements of this contract. The facilities are provided “as is.” Obtain CO approval in advance of making any changes to the facilities. Such changes will be at no cost to the Government unless otherwise approved by the CO. The contractor shall ensure facilities are maintained in a neat, clean and professional manner. The CO reserves the right to reallocate and relocate assigned facilities during the term of the Contract. Upon completion or termination of this Contract, or upon such reallocations or relocations, return facilities to the government in the same condition as received, fair wear and tear and approved modifications.

3.1.1 LAYDOWN SPACE

Approximately 20,000 square feet of exterior space is provided and/or made available that is fenced in and secure. Within the Government provided space, the Contractor may elect to provide an office trailer and/or temporary facility as shelter from inclement weather at the Contractor’s expense. The Contractor shall coordinate setup and location with the 460 CES.

3.2 UTILITIES

If available, the Government will furnish electricity, water, and sewage as necessary for accomplishment of work in accordance with this contract. All facilities do not receive the same utility services. The Contractor shall not change or modify any utility system or component; or connect any Contractor property, equipment or system without prior CO review and approval.

The Contractor shall practice energy conservation in the Government provided facilities.

3.3 SECURITY, FIRE , AND MEDICAL SERVICES

The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available but the contractor will provide cost reimbursement to the Medical Emergency Provider. From a Government land line, dial 911 for emergencies; or dial 720-847-9930 for Buckley AFB Security Forces and dial 720-847-9117/9118 for Buckley AFB Fire Department and Medical Services.

NOTE: Dialing 911 from a cellular phone on Buckley AFB will connect to off base authorities and response time may be delayed. If calling 911, report your location at Buckley Air Force Base.

3.4 TELEPHONE

The Government will not provide a telephone line in the Government provided facility for Contractor use in making local commercial calls and on base calls in support of contract requirements. Long distance calls and toll calls are not authorized on Government phones.

3.5 SOLID WASTE COLLECTION AND DISPOSAL

The Contractor shall use existing bulk containers to dispose of trash or solid waste generated from accomplishment of services detailed in this PWS (except for the work describes in section

1.8 Special Requirements). The contractor shall adhere to all base level recycling programs to include disposal of yard/tree waste in specified dumpster collection stations or at the recycling collection center on base. The CO or COR shall identify these specific dumpsters for yard/tree waste.

4 GENERAL INFORMATION

4.1 MISSION

The overall Civil Engineer mission at Buckley AFB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned airmen, families, civilian employees and retired community.

4.2 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION

The contractor is responsible for remediation of damages caused by unauthorized digging or damages caused due to violations of state and federal law. Damages to Government buildings, equipment, or vegetation are further addressed in clause 52.237-2 – “Protection of Government Buildings, Equipment, and Vegetation.”

4.3 ENVIRONMENTAL REQUIREMENTS

In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:

4.3.1 HAZARDOUS MATERIALS

The CO, COR, and Civil Engineer Asset Management (Environmental) Flight shall approve all hazardous materials brought on-site by the Contractor prior to use. The Contractor will be trained annually by Environmental and obtain approval using the Enterprise Environmental, Safety, and Occupational Health Management Information System (EESOH-MIS) application for each AF Form 3952 created electronically. Once the process is implemented and Contractor is trained, the Contractor may submit the AF Form 3952 electronically. The CO / COR has the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health and environment. In the event the CO / COR does not approve a hazardous material for use, the CO / COR may provide the Contractor a list of suitable substitutes; however, the Contractor shall retain responsibility for finding an acceptable substitute. The Contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies.

4.3.2 SPILL CONTROLS

The contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level.

4.3.3 PESTICIDES

The Contractor shall provide all management, licenses, laboratory testing, tools, supplies, equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan in the areas covered by this Grounds Maintenance PWS in a manner that will ensure the health and general well-being of installation personnel. The following types of pests are common on this installation and their abatement should be specifically addressed in the IPM plan and used to determine the workload: voles, prairie dogs, rabbits, wasps, bees, beetles, borers, aphids, ants, fungi, mice, rats, etc. The Contractor shall use only approved pesticides as stated in DoD Instruction 4150.07, DoD Pest Management Program, Encl 4 para 4.2.2 and AFI 32-1053, Pest Management Program, para 4.7.4 and 4.7.6. All pesticides are defined in DoD and Air Force documents. The AFCEC Command Entomologist, Civil Engineer Asset Management (Environmental) Flight and Pest Management Section must approve all pesticides prior to use (Submit a list with intended uses via the CO or COR before the start of every spray season). All pesticides used must be on the installation approved inventory list and applied by state certified personnel.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .