Attachment_5_Questions.pdf
PDF 902 KB Posted
- Attached to
- Building 26 Furniture
- Solicitation number
- FA254319RA018
About this file
Questions and answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA254319RA018_Amendment_2_CO_signed.pdf | ||
| Revised_SOW_dated_13_June.pdf | ||
| SOW_Summary_of_Changes_13_June.pdf | ||
| Attachment_2.dwg | DWG drawing | |
| FA254319RA018_Amendment_1_CO_signed.pdf | ||
| Attachment_3.dwg | DWG drawing | |
| Attachment_1_BLDG_26_SOW.pdf | ||
| Attachment_4.dwg | DWG drawing | |
| Typicals.pdf | ||
| Interior_Bldg_26.pdf | ||
| JCC_Bldg_26.pdf | ||
| NSA_Buckley_SOW.pdf | ||
| Furniture_Package_22Mar19.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA254319RA018, Building 26 Furniture
Post Site Visit Questions, 6 June 2019
The following Questions and Answers are hereby incorporated into the subject solicitation. Any proposal received not in conformance with the answers provided, would be considered ineligible for award.
Q1: Is a Dwg file avaialbale (CAD FIle)?.
A1: A .dwg file has been added with this amendment posted. Note this file is strictly to assist with vendor programs. If this .dwg file conflicts with the SOW, the SOW will take precedence.
Q2: The typicals are pretty straight forward, but they are asking for "standard modifications," by that do they mean options or changes that we can make to the stations that they are ok with and also meet our standards.
A2: The Portion of the typicals that states “standard modifications” refers to modifications expected to be delivered as a part of the requirement
Q3: It looks like they are asking for almost all of the typicals in a full monolithic panel and a monolithic plus fabric stacker, am I interpreting that correctly.
A3: This would appear to be an accurate interpretation. Please ensure that proposals are in conformance with requested specifications identified in the SOW.
Q4: It's not clear on the plan which typical goes where. Can I get a layout that provides that information?
A4: Figure 1 of the SOW identifies the location of each typical.
Q5: For the mothers room has it been pre-plumbed and hookup ready for plumbing?
A5: The SOW has been updated regarding the mother’s room, as well as the location of the mother’s room on attachment A of the SOW. The room itself is not plumbed but will require being plumbed into the neighboring connections as stated in the updated SOW.
Q6: Is the data and power running through the floors or through the ceiling?
A6: All connections that are not in a room, are running through the ceiling.
Q7: What brand is the furniture that is to be removed?
A7: The brand is not currently identifiable. However, the furniture to be removed is of the same modular style as what is to be removed.