This document appears to be a set of questions and answers related to a federal contract opportunity for fill materials/dirt for a K-Span building at the Kennedy Space Center.

The key details are:

  • The contract opportunity is for various types and quantities of fill materials/dirt, with deliveries scheduled for October 18th, November 8th, and November 15th.
  • Recycled concrete is allowed for one of the line items. Samples of the materials will be required before delivery.
  • The materials are to be used for the subgrade and base course layers of a building and concrete parking area.
  • Drivers will need to coordinate access to the Kennedy Space Center at least 3 days in advance, obtain temporary badges, and use the main gate. The materials may be stockpiled at a storage area until ready for placement.
  • The delivery location is the intersection of F Avenue SE and 9th St SE, Kennedy Space Center, FL 32953.
  • This is a Request for Quote (RFQ) solicitation, and all quotes must be submitted in PDF or Word format.

View the file

Other files

File Type Posted
24QB184 Q and A.docx DOCX document
24QB184 Q and A.docx DOCX document
24QB184 Q and A.docx DOCX document
24QB184 Q and A.docx DOCX document
24QB184 Salient Char. Doc.pdf PDF
24QB184 Clause Set.pdf PDF
24QB184 CSS Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA252124QB184

Fill Material/Dirt Q and A

1. Could you please confirm whether all requested items will be needed at once, or if there will be a breakdown of deliveries by line item?

a. Line Item 1: 18 Oct Line Items 2&3: 8 Nov Line Items 4&5: 15 Nov

2. Regarding line item # 3 FDOT Size #1 aggregate (3 1/2 - 1 1/2 inches) is the rock allowed to be recycled concrete?

a. Yes, line item 3 can be recycled concrete.

3. Will samples of the material be required before delivery?

a. Yes, samples before delivery.

4. What is the purpose of the materials?

a. Purpose is for subgrade and base course layers of a building and concrete parking area.

5. What kind of requirements will be made for drivers to gain access to the site? Is there a specific entrance/exit/route they need to take?

a. Access to KSC will have to be coordinated at least 3 days in advance of delivery. Drivers will have to receive a temporary badge, which will require filling out a form and providing 2 forms of ID (1 of which must be a driver’s license).

6. Will the material be spread, stockpiled, or managed in any way beyond spot dumping?

a. Materiel will likely be stockpiled at storage area until ready to place. Contractor will be responsible for dumping.

7. Can you explain exactly where BOSS Warehouse M6-0744 is located? Or the K-Span building? Is there a specific entrance or route the drivers will need to take.

a. The delivery address will be the intersection of F Avenue SE and 9th St SE, Kennedy Space Center FL 32953

b. This goes for all contractors: they will have to utilize the main gate on NASA Parkway to get on to KSC. They will have to get temporary badges, which will have to be coordinated at least 3 days in advance of delivery and will require filling out a form and providing 2 forms of ID (1 of which must be a driver’s license).