This document is a Q&A related to a solicitation (FA252124QB184) for fill materials/dirt for a K-Span building at the Kennedy Space Center. The key details are:
The solicitation requires several line item deliveries of different types of fill material, including FDOT Size #1 aggregate (which can be recycled concrete) as well as other sizes, between October 18 and November 15. Samples of the materials will be required before delivery. The purpose of the materials is for subgrade and base course layers of a building and concrete parking area at the Kennedy Space Center. Drivers will need to coordinate access and receive temporary badges to enter the site. The materials will likely be stockpiled at a storage area until ready for placement, with the contractor responsible for dumping. The exact location of the BOSS Warehouse M6-0744 and K-Span building can be discussed after award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24QB184 Q and A.docx | DOCX document | |
| 24QB184 Q and A.docx | DOCX document | |
| 24QB184 Q and A.docx | DOCX document | |
| 24QB184 Q and A.docx | DOCX document | |
| 24QB184 Salient Char. Doc.pdf | ||
| 24QB184 Clause Set.pdf | ||
| 24QB184 CSS Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA252124QB184
Fill Material/Dirt Q and A
1. Could you please confirm whether all requested items will be needed at once, or if there will be a breakdown of deliveries by line item?
a. Line Item 1: 18 Oct Line Items 2&3: 8 Nov Line Items 4&5: 15 Nov
2. Regarding line item # 3 FDOT Size #1 aggregate (3 1/2 - 1 1/2 inches) is the rock allowed to be recycled concrete?
a. Yes, line item 3 can be recycled concrete.
3. Will samples of the material be required before delivery?
a. Yes, samples before delivery.
4. What is the purpose of the materials?
a. Purpose is for subgrade and base course layers of a building and concrete parking area.
5. What kind of requirements will be made for drivers to gain access to the site? Is there a specific entrance/exit/route they need to take?
a. Access to KSC will have to be coordinated at least 3 days in advance of delivery. Drivers will have to receive a temporary badge, which will require filling out a form and providing 2 forms of ID (1 of which must be a driver’s license).
6. Will the material be spread, stockpiled, or managed in any way beyond spot dumping?
a. Materiel will likely be stockpiled at storage area until ready to place. Contractor will be responsible for dumping.
7. Can you explain exactly where BOSS Warehouse M6-0744 is located? Or the K-Span building?
a. The warehouse is located at Kennedy Space Center in FL. The exact location can be discussed after award