DRAFT_AIMS_Section_M.pdf

PDF 117 KB Posted

Attached to
Ascension Island Mission Services (AIMS) Solicitation FA252119RA017 Federal contract opportunity
Solicitation number
FA252119RA017
Issued by
Department of the Air Force Space Command

About this file

This document provides an evaluation plan for a solicitation seeking Ascension Island Mission Services. Key requirements include program management, non-mission support services such as civil engineering and base operations, and mission support services including 24/7 space object tracking via radar and telemetry operations. Offerors will be evaluated on technical approach, past performance, and cost/price with technical being most important. Technical evaluation will assess program management, non-mission support, and mission support capabilities. Past performance will be rated as substantial, satisfactory, neutral, limited, or no confidence. Cost/price proposals will be reviewed for completeness, reasonableness, balance, and a cost mischarging prevention plan. The winning proposal will provide the best overall value based on an integrated assessment of all factors. Award is intended for one contractor to provide the specified services through September 2025 with an option to extend.

Draft AIMS Section M

View the file

Other files for this federal contract opportunity

Other files attached to Ascension Island Mission Services (AIMS) Solicitation FA252119RA017, newest first.
File Type Posted
Attachment_7_-_DD_254.pdf PDF
Attachment_1_-_AIMS_PWS_18-October-2019.pdf PDF
MAJCOM_Apvl_Ltr_AOI_11-250.pdf PDF
Solicitation_Amendment_-_FA252119RA0170003_-_Conformed.zip ZIP file
Solicitation_Amendment_FA252119RA0170003_SF_30.pdf PDF
Attachment_17_-_CBA_WCFS_-_IBEW_01_Sep_2018_-_30_Sep_2021.pdf PDF
Attachment_3_-_AIMS_GFP_Listing_30_Sep_19.pdf PDF
Attachment_L-03_AIMS_Cost_Price_Workbook_Rev_1.xlsx XLSX spreadsheet
Attachment_M-01_Section_M,_Amendment_0003.pdf PDF
Attachment_L-03_AIMS_Cost_Price_Workbook_Rev_1.xlsx XLSX spreadsheet
1985_Exchange_of_Notes_Concerning_UK_Forces_Use_of_Facilities.pdf PDF
1959_BLRPG_Admin_Arrangements_Regarding_Sites_in_Ascension_Island.pdf PDF
AIMS_FES_Manning_Enclosure_9.pdf PDF
2016 Wideawake Agreement PDF
AAAF_Storage_Tanks_Redacted.pdf PDF
Solicitation Amendment - FA252119RA0170002.pdf PDF
45 SW OPLAN 91-212.2 BASH Reduction Plan Ascension AAF.PDF PDF
WWTP_Brochure.zip ZIP file
Ascension_Traffic_Count.pdf PDF
Solicitation_Amendment_-_FA252119RA0170002.zip ZIP file
Pending_Answers_to__Atch_L-01_Question_&_Answer_Rev_1.xlsx XLSX spreadsheet
AAAF_Facilities.pdf PDF
Solicitation_Amendment_FA252119RA0170001_SF_30.pdf PDF
Pending_Answers_to_Attachment_L-01_Questions_&_Answers.xlsx XLSX spreadsheet
Attachment_8a_-_NASA_MCAT_Preventive_Maintenance.pdf PDF
Exhibit_A_AIMS_CDRLs_A001_-_A020.pdf PDF
Attachment_M-01_Section_M.pdf PDF
Attachment_11_-_AIMS_Work_Load_Factor_Tables.pdf PDF
Attachment_9__NASA_Shadoz.pdf PDF
Attachment_8_-_Support_Agreement_for_NASA_MCAT.pdf PDF
Exhibit_D_AIMS_CDRLs_D001-D002.pdf PDF
Attachment_5_-_SCA_WD_2015-4555_Rev_8.pdf PDF
Attachment_12_-_Antenna_&_Tower_Listing.pdf PDF
Exhibit_E_AIMS_CDRLs_E001-E002.pdf PDF
AIMS_Pre-Solicitation_Conference_26_Jul_19.PPTX PPTX presentation
Draft_Exhibit_B_CDRLs_B001-B039.pdf PDF
Draft_Exhibit_D_CDRLs_D001-D002.pdf PDF
Draft_AIMS_Cost_Price_Workbook.xlsx XLSX spreadsheet
Draft_Exhibit_C_CDRLs_C001-C005.pdf PDF
AIMS_Pre-Solicitation_Conference_Sign-in.pdf PDF
AIMS_Presolicitation_Conference_Letter.pdf PDF
Attachment 5 -AIMS Draft GFP LISTING.pdf PDF
Attachment_9_-_AIMS_Draft_Facility_Listing.pdf PDF
Attachment_10-_Draft_AIMS_AAAF_Tower_Antenna_Structure_List.pdf PDF
Attachment_1-AIMS_Draft_PWS.pdf PDF
DRAFT_AIMS_Section_L.pdf PDF
Attachment_11-AIMS_Work_Load_Factor_Tables_14_Jun_19.pdf PDF
Draft_Solicitation_-_FA252119RA017.pdf PDF
DRAFT_AIMS_Section_L.pdf PDF
DRAFT_AIMS_Section_M.pdf PDF
Show all 50

Ascension Island Mission Services (AIMS) Solicitation FA252119RA017 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only – Source Selection Information – See FAR 2.101 and 3.104

SSP Attachment 5

Evaluation Factors for Award

M-I. SOURCE SELECTION

1.1. Basis for Contract Award: This acquisition will utilize the Tradeoff source selection procedures in accordance with FAR 15.3 as supplemented by the DoD Source Selection Procedures referenced in DFARS 215.300 and the AFFARS Mandatory Procedures 5315.3 to make an integrated assessment for a best value award decision. The Government intends to award one contract as a result of this solicitation. In using the best value approach, the Government seeks to award to the offeror who gives the Air Force the greatest confidence that it will best meet or exceed our requirements affordably in a way that will be advantageous to the Government. This may result in an award to a higher rated, higher priced offeror where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) reasonably determines that the technical superiority and/or overall business approach and/or superior past and present performance of the higher priced offeror outweighs the cost difference.

To arrive at a best value decision, the SSA will integrate the source selection team’s evaluations of the factors and subfactors described in this provision. While the Government will strive for maximum objectivity, the tradeoff process, by its nature, is subjective; therefore, professional judgment is implicit throughout the selection process. Award will be made to the responsible offeror whose proposal conforms to all required terms and conditions, includes all required representations and certifications, meets all requirements set forth in the RFP, and also provides the best value to the Government based on the results of the evaluation as described below.

1.2. Number of Contracts to Be Awarded: The Government intends to award one contract for the Ascension Island Mission Services. However, the Government reserves the right to not award a contract.

1.3. Discussions: The Government intends to award this contract after discussions, which will be held in accordance with FAR 15.306. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer, with the concurrence of the Source Selection Authority, may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the FPRs are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.

M-II. EVALUATION FACTORS: Volume 1 – Factor 1 –Technical

2.1. Evaluation Factors and Subfactors. The following evaluation factors and subfactors will be used to evaluate each proposal. Award will be made to the offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the factor and subfactors.

Factor 1: Technical (which includes both Technical and Technical Risk Ratings Combined)

Subfactor 1: Program Management Subfactor 2: Non-Mission Support Services Subfactor 3: Mission Support Services

Factor 2: Past Performance

Factor 3: Cost/Price

2.1.1. Relative Importance of Factors and Subfactors. The relative importance of each factor and subfactor is as follows: Technical, Past Performance, and Cost/Price are listed in descending order of importance with Factor 1 (Technical) being most important, Factor 2 (Past Performance) next importance and Factor 3 (Cost/Price) is last in importance. In accordance with FAR 15.304 (e), all evaluation factors other than Cost/Price, when combined are approximately equal to cost or price. The subfactors for Technical/Risk Factor combined are equal in importance.

2.2. Factor 1 – Technical Evaluation Factors, Subfactors and Ratings: The Technical evaluation provides for a combined technical/risk rating.

2.2.1. Technical Rating: The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. The Combined Technical/Risk rating considers the risk associated with the technical approach in meeting the requirement. Each Technical subfactor will receive one of the color/adjectival ratings described Table 2.1 – Combined Technical/Risk Ratings Method, excerpted below. The risk rating definitions are described in Table 2.2 – Technical Risk Rating Method, excerpted below. The technical rating focuses on the strengths and deficiencies of the offeror's proposal. The color rating depicts how well the offeror’s proposal meets the Technical subfactor requirements.

Subfactor ratings shall not be rolled up into an overall color rating for the Technical/Risk factor combined. In arriving at a best value decision, the Government reserves the right to give positive consideration, for performance in excess of Performance Work Statement (PWS) requirements, which may be used as a tradeoff for a higher cost proposal.

Technical capability will consist of three subfactors (as shown above), to be evaluated separately. All three subfactors are equal in importance. The possible ratings for all subfactors include outstanding, good, acceptable, marginal and unacceptable.

Table 2.1. Combined Technical/Risk Rating Method Color Rating Adjectival

Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Table 2.2. Technical Risk Rating Method Adjectival

Rating Description

Low

Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High

Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost, or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

2.2.2. Subfactor 1 – Program Management: This subfactor evaluates the proposed approach to program management. The standard is met when:

2.2.2.1. The offeror provides a detailed organization chart and staffing plan that enables organizing, managing, and coordinating resources in a geographically separated location. The organization chart describes labor skill mix with FTEs per category and identifies which positions are managed by a subcontractor. The staffing plan describes an acceptable approach which demonstrates a thorough understanding of necessary workforce size, roles, qualifications (education, certifications, and/or experience), and the staffing/skill (job classification)/shift summary matrix required to meet the requirements in the PWS. The staffing plan provides an acceptable solution for management of subcontractor employees (if any).

2.2.2.2. The offeror demonstrates a competitive methodology to effectively attract and retain a highly qualified workforce and provides effective management plans to accommodate shortfalls. The approach demonstrates the ability to adequately staff the contract, identifies an acceptable cross utilization and training solutions, and establishes a plan to replace personnel throughout the life of the contract who have required knowledge, experience, training, and/or certification at a minimum in the areas of vehicle/equipment mechanics, air traffic controllers, fire fighters, medical personnel, HVAC technicians, radar/telemetry operation and maintenance (O&M) personnel, powerhouse operators, corrosion control personnel, and IT technicians. The offeror’s approach also mitigates the risk associated with any proposed one deep critical positions and specifically addresses a plan of action to reduce risk related to turn over.

2.2.2.3. The offeror provides a detailed and effective phase-in/transition plan that complies with the requirement in PWS paragraph 1.11, minimizes any impact of transitioning from legacy contracts, and is fully capable of performing the entire PWS within 90 days from transition start.

2.2.2.4. The offeror provides a detailed and effective approach to accommodate multiple U.S. Government tenants, manage a foreign national workforce in a foreign remote environment, and interface with Host Nation representatives that meet requirements in PWS paragraphs 1.10, 2.9. & 2.10, as well as any other subparagraph that references tenant support and/or foreign national workforce.

2.2.2.5. The offeror provides a detailed and effective quality control program that complies with the requirements of the PWS paragraph 1.5.4.

2.2.3. Subfactor 2 – Non-Mission Support Services: This subfactor evaluates the proposed approach for successfully accomplishing non-mission support. The standard is met when:

2.2.3.1. The offeror demonstrates an effective, detailed, and knowledgeable approach to perform civil engineering services that meets the requirements of PWS paragraph 4.

2.2.3.2. The offeror demonstrates an effective, detailed, and knowledgeable approach to provide/perform base airfield services and maintain Air Traffic Control and Landing Systems (ATCALS) that meets the requirements of PWS paragraph 2.8.

2.2.3.3. The offeror demonstrates an effective, detailed, and knowledgeable approach to perform Base Operation Support (BOS) services that meets the requirements of PWS paragraph 2.

2.2.3.4. The offeror demonstrates an acceptable, detailed, and knowledgeable approach for providing non-mission communication and network services that meets the requirements of PWS paragraph 5.

2.2.4. Subfactor 3 – Mission Support Services: This subfactor evaluates the proposed approach for successfully accomplishing mission support. The standard is met when:

2.2.4.1. The offeror demonstrates an effective and detailed approach to perform 24/7 space object tracking mission to successfully meet the service summary item objective #14 Operational Availability (Ao) threshold of 90% as well as the requirements within PWS paragraph 6.2.16.

2.2.4.2. The offeror demonstrates an effective and detailed approach to perform concurrent radar and telemetry operations that meets the requirements of PWS paragraph 6.

2.2.4.3. The offeror demonstrates an effective and detailed approach to perform maintenance functions for radar and telemetry systems and at a minimum address performance of Preventative Maintenance Inspections (PMI’s), scheduling depot maintenance, and system events that cause Non Mission Capable (NMC) status that meets the requirements of PWS paragraph 6.

2.2.4.4. The offeror demonstrates an acceptable and detailed approach to restore mission systems to Fully Mission Capable (FMC) status after a system becomes inoperable or experiences a catastrophic failure within the time allotted in PWS table 6-3.

2.2.4.5. The offeror demonstrates an effective and detailed approach on how they will calibrate and maintain the tracking and receiver performance of radar and telemetry systems that meets the requirements of PWS paragraph 6.

2.2.4.6. The offeror demonstrates an effective and detailed approach for performing both launch support and day to day mission communications and provides explanations of the subsystems and manpower differences between day to day and mission support that meets the requirements of PWS paragraph 6.

M-III. EVALUATION FACTORS: Volume 2 - Factor 2 – Past Performance:

3.1. Past Performance Factor. The Past Performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements.

3.1.1. The Past Performance factor will receive one of the performance confidence assessments described in Table 3.1 Performance Confidence Assessments, excerpted below.

Table 3.1 Performance Confidence Assessments

Adjectival Rating Description

Substantial Confidence

Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence

Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

3.1.2. Evaluation Process. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the Offeror, Major Subcontractors, Primary Teaming Partners, or Joint Venture Partners’ recent past performance, focusing on performance that is relevant to the Technical subfactors and Cost/Price factor for those requirements that they are proposed to perform. The Government may consider past performance in the aggregate in addition to on an individual contract basis. In conducting the past performance evaluation, the Government reserves the right to use both the information provided in the offeror’s past performance proposal volume and information obtained from other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract Management Agency (DCMA), and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.

The evaluation of the offeror’s/joint venture members’ present/past performance WILL NOT include the present/past performance of any key personnel even though they may perform major or critical aspects of this requirement.

3.1.2.1. Recency Assessment. An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past three years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.

3.1.2.2. Relevancy Assessment. The Government will conduct an in-depth evaluation of all recent performance information performed by the Offeror, Major Subcontractors, Primary Teaming Partners, or Joint Venture Partners obtained to determine how closely the products provided/services performed under those contracts relate to the Technical subfactors and Cost/Price factor for those requirements that they are proposed to perform. For each recent past performance citation reviewed, the relevance of the work performed will generally be assessed for the Technical subfactors and Cost/Price Factor (however, all aspects of performance that relate to this acquisition may be considered). A relevancy determination of the offeror’s past performance will be made based upon the aforementioned considerations, including Major Subcontractors, Primary Teaming Partners, or Joint Venture Partners. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, major subcontractor, primary teaming partner, or joint venture partner whose contract is being reviewed and evaluated. Past performance provided from sources other than the Offeror, Major Subcontractors, Primary Teaming Partners, or Joint Venture Partners or for work that they are not proposed to perform will not be evaluated. The Past Performance Questionnaires (PPQs) and information obtained from other sources will be used to establish the degree of relevancy of past performance.

The relevancy of the work performed on past and present efforts will be assessed for the areas described in Table 3.2.

Table 3.2 – Relevancy. Present/past performance citation is similar to the scope, magnitude and complexities when each subfactor has been met in that area.

3.1.2.3. Quality of Services Assessment. The Government will consider information from customers on how well the offeror performed on past contract citations.

For each recent, relevant past performance citation reviewed, the quality of products or services, the work performed, will be assessed for the Technical subfactors and Cost/Price Factor (however, all aspects of performance that relate to this acquisition may be considered). The quality of services assessment consists of an in-depth evaluation of all past performance information available, regardless of its source. The quality of services assessment may result in positive or adverse findings. Adverse is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comment received from sources without a formal rating

Program Management Non-Mission Support Services Mission Support Services

Magnitude approximately $15M annually or greater on a single Base

Operations Support contract

Operated a Base Service Contract which includes civil engineering, facility maintenance, dining hall, fire protection, airfield operations, and motor pool functions

Provided radar operations and maintenance

And And And

Managed at a minimum a workforce of 50 foreign laborers

Performed OCONUS Logistic Operations (supply, shipping, procurement, motorpool)

Telemetry operations and maintenance

Program Management Non-Mission Support Services Mission Support Services

Magnitude at least $10M annually on a single Base Operations Support contract

Provided at least three of the following:

civil engineering, facility maintenance, dining hall, fire protection, airfield operations, or motor pool functions

Provided radar operations and maintenance

And And

Staff greater than 80 employees Performed CONUS Logistic Operations

(supply, shipping, procurement, motorpool)

Program Management Non-Mission Support Services Mission Support Services

Managed a DoD contract of at least $5M annually on a single Base Operations Support contract

Provided at least two of the following:

civil engineering, facility maintenance, dining hall, fire protection, airfield operations, or motor pool functions

Operate and Maintain mission equipment on a DoD test range operations and maintenance contract providing services of at least $1M annually

Very Relevant

Relevant

Somewhat Relevant

NOT RELEVANT: did not meet any of the above very relevant, relevant, and somewhat relevant definitions system. For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements. Process changes will only be considered when objectively measurable improvements in performance have been demonstrated.

3.1.3. Assigning Performance Confidence Assessments Rating. The past performance confidence assessment rating is based on the offeror’s overall record of recency, relevance and quality of services assessments. Offerors will receive an integrated performance confidence assessment rating at the factor level (see Table 3.1 above). Although the past performance evaluation focuses on performance that is relevant to the Technical subfactors and cost/price factor, the resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance. Offerors without a record of recent/relevant past performance or for whom information on past performance is so sparse that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated favorably or unfavorably on past performance and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor.

More recent performance will have a greater impact on the performance confidence rating than less recent effort. A strong record of relevant past performance may be considered more advantageous to the Government than a "Neutral Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.

3.2. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contract citations deemed most relevant to the effort described in this RFP.

Table 3.4 Performance Confidence Assessments Rating Method Adjectival Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the

Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Offerors are cautioned to submit sufficient information and in the format specified in Section L.

Offeror’s may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.

Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.

M-IV. EVALUATION FACTORS: Volume 3 - Factor 3 – Cost/price:

The offeror’s cost/price proposal will be evaluated to determine that the proposal is complete, reasonable, and balanced. This information will then be used in the tradeoff analysis to make a best value determination.

4.1. Complete Proposal: The Government will evaluate completeness of the offeror’s submitted cost/price volume. The cost/price volume shall adequately describe the offeror’s proposed accounting system, how the proposed cost was derived, and measures to prevent cost mischarging. The proposal shall include completed versions of the TEP Workbook (Attachment

10) with supporting cost detail and the Labor Hour Listings (Attachments 10a-10c). Failure to provide required narrative description, applicable worksheets or supporting detail may make the proposal ineligible for award.

4.2. Reasonableness: The offeror’s proposal will be evaluated to ensure it is fair and reasonable, pursuant to FAR 15.404. For additional information see FAR 31.201-3.

4.3. Balanced: The Government will analyze proposals to determine whether they are unbalanced with respect to prices, costs and separately priced line items IAW FAR 15.404-1. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

4.4. Cost Mischarging Prevention Plan: The Government will evaluate the offeror’s proposed method of preventing the improper allocation of cost between fixed price and cost CLINs or movement of direct labor costs to indirect cost pools, to include subcontractor methods (if applicable). To be acceptable, the offeror’s prevention measures must demonstrate established procedures for proper cost allocation, ability to provide documentation of the work performed (to include labor category and employee identification) for labor hours charged to cost CLINs and provide an internal audit process for identifying and correcting incorrect labor charges. Failure to present an acceptable plan may cause the offer to be rejected.

4.5. Total Evaluated Price: The offeror’s cost/price proposal will be evaluated for award purposes using the total price proposed for fixed-price CLINs and the Probable Cost (PC) for cost type CLINs for all five years plus 50% of the FY25 CLIN value (for purposes of evaluating the potential cost of an extension under 52.217-8, Option to Extend Services).

For FFP CLIN X014 (Project CLIN) an estimated value will be evaluated as part of the TEP only; however, after award the Government will not be liable for the estimated amount of the Projects CLIN and will only be liable for projects separately negotiated.

The offeror's proposed estimated costs for Cost CLINs shall not be controlling for source selection purposes. A cost realism analysis will be performed in accordance with FAR 15.404- 1(d). The analysis will consist of independently reviewing and evaluating specific elements of each offeror's proposed cost estimate to determine whether the estimated proposed cost elements are realistic for the work to be performed under the cost reimbursable and CPFF CLINs; reflect a clear understanding of the requirements; and are consistent with the unique methods of performance and materials described in the offeror's technical proposal in accordance with FAR 15.404-1(d)(1). A PC will be assessed. The PC reflects the Government's best estimate of the cost of any contract that is most likely to result from the offeror's proposal. The PC is determined by adjusting the offeror's proposed cost to reflect any additions or reductions in cost elements to realistic levels based on the result of the realism analysis. If the Government determines an offeror's proposal to be unrealistic, the PC will be included as part of the TEP and shall be used in the evaluation to determine best value. The combination of the proposed price (Fixed Price CLINS) and the PC (Cost CLINs) will form the TEP.

4.6. Options: Evaluation of options shall not obligate the Government to exercise such options.

4.7. Professional Employee Compensation Plan: The professional employee compensation plan and supporting information will be evaluated per FAR 52.222-46 to assure it reflects a sound management approach and understanding of the contract requirements. Failure by the offeror to include their Major Subcontractors/populated joint venture/each joint venture partner in an unpopulated joint venture to submit this professional employee compensation plan will result in the offeror being considered as failing to meet the RFP terms and conditions.

M-IV. EVALUATION FACTORS: Volume 4 – Administrative Documents

5.1. Solicitations Requirements, Terms and Conditions

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale.

5.2. Past Performance Information

Offerors past performance information will be used as a basis for the Contracting Officer’s determination of responsibility. Offerors must be deemed responsible to receive contract award

IAW FAR 9.104.

5.3. Pre-Award Survey

The Government may conduct a pre-award survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offeror's capability to meet the requirements of the solicitation.

File details come from the government source that posted it. Updated .