This document provides workload factor tables and standards for custodial services for the Ascension Island Mission Services contract. The tables list tasks and meetings required along with estimated workload volumes and variance ranges. Tasks include facility studies, construction projects, shipments, emergency services and more. Meetings cover project status, communications infrastructure and contractor performance. Standards define improved, semi-improved and unimproved grounds maintenance at various facilities on Ascension Island.
Attachment 11 - AIMS Work Load Factor Tables
View the file
Other files for this federal contract opportunity
Show all 50
Ascension Island Mission Services (AIMS) Solicitation FA252119RA017 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Planning Purposes Only
AIMS Work Load Factor Tables 28 August 2019
FA2521-19-R-A017, Attachment 11
AIMS Work Load Factor Tables
1.0 Work Load Factors
1.1 By Task
Table 1-1: List of Work Load Factors
TASK # WORK LOAD FACTOR
UNIT OF
MEASURE/FREQUENCY UNITS
UNIT
VARIANCE
1.6 and 4.2
Ad Hoc Cost Data Requests
Ad hoc request / Yr. 100 +/- 10%
1.6.21.1 and 2.6.3.4.1
Hydroponics Growing Area to be Utilized (square feet)
9000 sq. ft. +/- 500 sq. ft.
1.6.21.1 and 2.6.3.4.1
Garden Solutions (Hoop house/soil garden)
Growing Area to be Utilized (square feet)
8000 sq. ft. +/- 500 sq. ft.
1.6.13 Contract Change
Requests (CCR)
Contract Change Requests / Yr. 20 +/- 20%
1.8 Wing Exercises Exercise Days / month 2 + / - 1
1.8 Wing Inspections
(ORI/UCI)
Inspections / Yr. 10 + / - 1
Days / Per Inspection 2 + / - 5
2.1.1 No Notice Fire Inspection Number of Inspections / Yr.
(After Hrs./Per Direction of Base Commander)
2 +/- 1
2.3 Distinguished Visitors Visitors / Yr. 5-6 AAAF +/-1
Visitors / Group 3-4 AAAF
2.3 and 4.3
Escort Services Visitors / Yr.
(Not including AFCEC runway project)
800 +/- 10
2.5 Emergency Medical
Service Calls
Emergency Calls / Month 3 +/- 2
2.5 Cash Reimbursable
Medical Services
$ / Yr. Estimate: AAAF - $13,500 / Yr.
+/- 10%
2.6 TDY lodging Lodging (Rooms)
(Not including AFCEC runway project)
AAAF – 30 TDY
lodging
N/A
2.6 TDY Trips Ascension: Estimated 1040 / Yr.
(Not including AFCEC runway project)
AAAF: 1040
TDY Trips / year
+/- 10%
2.6 Permanent Party
Quarters
Quarters (Rooms) AAAF – 300 Quarters
N/A
2.6 TDY / Personnel TDY / Personnel AAAF / Yr. 1040 +/- 10%
TASK # WORK LOAD FACTOR
UNIT OF
MEASURE/FREQUENCY UNITS
UNIT
VARIANCE
(Not including AFCEC runway project)
2.7.4 Lifeguard Services (Pool) Hours / Week Pool Will Have a Manned Lifeguard (Unmanned Remainder of the Year)
NTE 16 hrs.
/normal wk., N/A
24 hrs./wk. with a UK/island or US Holiday
2.7.9 MWR Off Shore Fishing
Trips (Customer Reimbursable)
Off Shore Fishing Trips / Week, Approximately 4 hrs. duration each trip.
2/Week/Base Commander Approval
+/- 1
2.8 Total Aircraft Aircraft / Yr. AAAF 700 +/- 50
2.8 Transient Aircraft Aircraft / Yr. AAAF 12 +/- 10%
2.10.1.8 All other tenant support
other than AFTAC, NRL, and NASA (mainly Comm)
Hours/Annually 500 hrs. +/- 20%
2.10.3 AFTAC Support (mainly
Comm)
Hours/Annually 500 hrs. +/- 20%
2.10.5 NRL Support (mainly
Comm)
Hours/Annually (800 hrs. during normal hrs. / 200 hrs. during after hrs.)
1000 hrs. +/- 20%
3.2 Combined Downrange
Shipments (Air)
Pallets of Cargo Per Every Other Week
8-10 pallets / every other wk. of cargo
+/-15%
3.2 Downrange shipments
(Sea)
Sea Vans / Vessel Shipment, 5 Vessels / Year
50 Sea Vans/Vessel
+/- 2 Vessels
3.4.9 UK Ship to Shore Support 3 Bodies for 5 Days /
Maintenance Action
2 Occurrences / Yr.
+/- 1
3.5.2.28 Vehicle Recovery Vehicle Callouts / Yr. 10-15 +/- 10%
4.1 Downrange Facility
Studies
Studies / Yr. 4 + / - 1
4.2.4 Construction Procured
Contracts
Projects/ Yr. 3-5 N/A
4.2.7 GIS Surveys Surveys / Yr. 2 N/A
4.3 Downrange Facility
Projects Programming and Project Support
Facility Projects / Yr. 8 + / - 3
4.3 and 4.4
Downrange Planned Work Orders
$ Planned work orders / Yr.
(CLIN 2 labor only)
$500K + / - $50K
TASK # WORK LOAD FACTOR
UNIT OF
MEASURE/FREQUENCY UNITS
UNIT
VARIANCE
4.3 and 4.4
Downrange Direct Scheduled Work
Direct Scheduled Work / Occurrence
Less than 50 hrs. NA
4.4 Work Plans Recurring Work Plans / Yr. 3.5 N/A
4.4 Antennas Number of Antennas Maintained
/ Yr.
64 +/- 5
4.4.9.8 Mooring Point Inspection Number of scuba dives / Yrs. 4 +/- 2
5.4.3.3 and 6.2.21.4.
Circuit Line Record Cards Total CLRC 72 +/- 20%
Maintained CLRC 72 +/- 20% Updated / Month 10 +/- 20% # Changes / Month 10 +/- 20%
6.2.17 Launch/Test Mission
Operations
Missions/ Per Year 2 +/- 2
6.2.21 Cable Records Total Fiber Lines: 624 Strands +/- 10%
Total Copper Lines: 7896 Pair
Total In Use Fiber Lines: 153 Strands
Total In Use Copper Lines: 1123 Pair
6.2.21 Telephone Lines Telephone Records 676 +/- 20%
1.2 Meetings
Table 1-2: List of Meetings
Meeting Title Frequency Government Participants Objective
Ascension Systems, Projects, & Flt Schedules Status
Weekly 45 MSG/CC, Det
2/CC
Review status of projects, issues, actions, upcoming events impacting Ascension AAF
Range Schedule As Requested
RANS Detailed review of Range Schedule
CE Projects Status Weekly CES Review status of upcoming CE projects to understand impacts on communications infrastructure
CE Facility Review Weekly CES CEPT and/or 332 Review & Prioritization
Communications Corrective Action TIM
Bi-Weekly SCS/SCX, SCS/SCO SCS/SCX Status Meeting of open WOMS/Remedy (and other) projects
Downrange Construction Status
Bi-Weekly CES, Det 1 & 2 CCs Downrange Construction Status
Contractor Performance Feedback
Monthly OG/CC, CONS/CC, CONS/LGCZR, SCS/CC
Review status of program.
Government provides Ktr performance feedback.
Program Management
TIM
Monthly RANS Chief Engineer and RANS CORs
Monthly dialogue between regarding PWS Chapter 4 issues, concerns, and performance
Program Management Review
Weekly OG/CC, CONS/CC, CONS/LGCZR
Review status of AIMS program.
Government provides contractor performance feedback.
Communications TIM Monthly SCS/SCX, others by invitation
Review status of Communications projects, issues, actions, upcoming events
Downrange Customer Brief
Quarterly CES Downrange Customer Brief
Review of Airfield Status Quarterly Det 2/CC & Det 2 Air Field Manager
Review of Airfield Status
AIMS Tag-Up Bi-Monthly PMO, SCS, CES, FSS, OSS, MDG, Review of real-time activities being performed by AIMS contractor
1.3 Custodial Standards
Note: Ascension Auxiliary Airfield does not have any facilities that qualify for Prestige, Academic, etc.
AF COLS 3
METRIC DESCRIPTION
AND KEY
PERFORMANCE
INDICATORS
Clean restrooms twice per week
Level of service performed for restroom cleaning
Key Performance Indicators:
Yes No
Sweep and mop floors, vacuum carpet, and clean walk-off mats once every two weeks
Level of service performed for sweeping and mopping floors, vacuuming carpet, and cleaning walk-off mats
Conduct trash removal (centralized location only) once per week
Level of service performed for trash removal
Buff floors, maintain/strip floors, and shampoo carpets for emergency spot cleaning only as required
Level of service performed for buffing floors, maintaining/stripping floors, and shampooing carpets
Ascension (AAAF)
Maintain as Improved Grounds (Estimated at ~3 Acres total):
Strip of land between Facilities (Dorms) 12175 and 12176 Strip of land between Facilities (Dorms) 12142 and 12143 Strip of land between Facilities (Dorms) 12126 and 12127 Strip of land between Facilities (Dorms) 12177 and 12188 Strip of land in front of (North of) Facility (Dorm) 12141 Grassy areas around all the Modular Dorms Grassy areas around the Volcano Club (Facility 12103)
All other areas at Ascension are Unimproved.
NOTE: There will be requirements to remove Acacia plant if/when it encroaches on equipment and facilities.
AF COLS 3 DESCRIPTION OF REQUIREMENTS
IMPROVED
GROUNDS
Maintain irrigated grass at 2”-4” and non-irrigated grass at 2-5”; provide limited non-mowing maintenance solely for appearance purposes. Limit trimming and edging to DV, high visitor, memorial/flag parks, parade and fitness areas Limit irrigation system maintenance and fertilization to only DV, high visitor, memorial/parade/fitness areas, and limit lawn renovation to vehicle rut correction and erosion control as needed Limit leaf removal, debris removal, grounds policing to operational, safety, AT/FP, drainage problem and lawn disease prevention Limit pest/weed control to noxious or invasive species control Limit pruning of shrubs, hedges, and other vegetation to prevention of infrastructure damage, pest infestation and to comply with AT/FP standards
SEMI-IMPROVED
GROUNDS
Grass height maintained at 7-14” to match BASH standard; Limit trimming and edging to prevent infiltration of grates, equipment, other infrastructure and safety issues. Limit weed control to noxious or invasive species control appropriate to local region guidance
UNIMPROVED
GROUNDS
Control vegetation as necessary for safety, security, wildlife control and to minimize fire fuel (generally keep grass height at 10”-14”). Limit weed control to noxious or invasive species control appropriate to local region guidance
AIRFIELD GROUNDS
Maintain airfield grounds height between 7 and 14 inches in BASH areas. Follow AFI 91- 202, The US Air Force Mishap Prevention Program guidance. Maintain weed and pest control IAW BASH guidance.
SURFACE DRAINAGE
DITCHES
Maintain surface drainage ditches to be free of shrubs, trees, silt and trash to prevent erosion and ensure continuous flow of water
OTHER
REQUIREMENTS
Limit pruning or trimming trees, removal of trees and/or stumps for safety or AT/FP emergencies only, and discontinue planting of trees
No DV cuts provided; provide special cuts for emergency special events only
Provide maintenance of vegetative beds, inert beds, and related areas per 2008 LOS baseline limited to DV, high visitor and memorial areas only Discontinue planting of vegetative beds, inert beds, and related areas
| AIMS Work Load Factor Tables |
| 28 August 2019 |
| 1.0 Work Load Factors |
| 1.1 By Task |
| 1.3 Custodial Standards |
| Note: Ascension Auxiliary Airfield does not have any facilities that qualify for Prestige, Academic, etc. |