Attach_5_-_DBEH151571_Rpr_Cable_Splices__Submittal_Register.xls

XLS spreadsheet 54 KB Posted

Attached to
Repair Cable Splices in Manholes on Phillips Parkway, CCAFS, FL
Solicitation number
FA252119BA020
Issued by

About this file

Attachment 5 Submittal Register

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:Repair Cable Splices in Manholes on Phillips ParkwaySUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Trans-mittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E RevwrSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 11 00.00 3001Preconstruction SubmittalsUtility Outage Requests1.10.1G
201 11 00.00 3001Preconstruction SubmittalsConnection Requests1.10.1G
301 11 00.00 3001Preconstruction SubmittalsAF 39521.8.4G
401 11 00.00 3001Preconstruction SubmittalsSOLID WASTE DISPOSAL DIVERSION TRACKING1.11.6G
501 11 00.00 3001Preconstruction SubmittalsPremises/Access Plan1.7G
601 11 00.00 3001Preconstruction SubmittalsStorage Area Request1.8.1G
701 11 00.00 3001Preconstruction SubmittalsSuperintendent Contact and Qualifications3.7G
801 33 0001Preconstruction SubmittalsSubmittal Register1.7G
901 35 2601Preconstruction SubmittalsAccident Prevention Plan (APP)1.7G
1001 35 2606Test ReportsMonthly Exposure Reports1.4
1101 35 2606Test ReportsNotifications and Reports1.12
1201 35 2606Test ReportsAccident Reports1.12.2G
1301 35 2606Test ReportsLHE Inspection Reports1.12.3
1401 35 2607CertificatesStandard Lift Plan1.7.2.2G
1501 35 2607CertificatesCritical Lift Plan1.7.2.3G
1601 35 2607CertificatesActivity Hazard Analysis (AHA)1.8
1701 35 2607CertificatesConfined Space Entry Permit1.9.1
1801 35 2607CertificatesHot Work Permit1.9.1
1901 35 2607CertificatesCertificate of Compliance1.12.4
2001 57 1901Preconstruction SubmittalsPreconstruction Survey1.6.1
2101 57 1901Preconstruction SubmittalsSolid Waste Management Permit1.10G
2201 57 1901Preconstruction SubmittalsRegulatory Notifications1.6.2G
2301 57 1901Preconstruction SubmittalsEnvironmental Protection Plan1.7G
2401 57 1901Preconstruction SubmittalsStormwater Notice of Intent3.2.1.2G
2501 57 1901Preconstruction SubmittalsDirt and Dust Control Plan1.7.9.1G
2601 57 1901Preconstruction SubmittalsEmployee Training Records1.6.5G
2701 57 1901Preconstruction SubmittalsEnvironmental Manager Qualifications1.6.4G
2801 57 1906Test ReportsInspection Reports3.2.1.3
2901 57 1906Test ReportsSolid Waste Management Report3.7.2.1G
3001 57 1907CertificatesEmployee Training Records1.6.5G
3101 57 1907CertificatesErosion and Sediment Control Inspector1.6.5
3201 57 1911Closeout SubmittalsStormwater Pollution Prevention Plan Compliance Notebook3.2.1.4G
3301 57 1911Closeout SubmittalsStormwater Notice of Termination3.2.1.5G
3401 57 1911Closeout SubmittalsWaste Determination Documentation3.7.1G
3501 57 1911Closeout SubmittalsDisposal Documentation for Hazardous and Regulated Waste3.7.3.6G
3601 57 1911Closeout SubmittalsSolid Waste Management Permit1.10G
3701 57 1911Closeout SubmittalsSolid Waste Management Report3.7.2.1G
3801 57 1911Closeout SubmittalsHazardous Waste/Debris Management3.7.3.1G
3901 57 1911Closeout SubmittalsRegulatory Notifications1.6.2G
4001 57 1911Closeout SubmittalsAs-Built Topographic Survey3.2.1.5G
4101 74 1901Preconstruction SubmittalsWaste Management Plan1.6G
4201 74 1911Closeout SubmittalsRecords1.7
4301 78 0003Product DataWarranty Management Plan1.5.1
4401 78 0003Product DataWarranty Tags1.5.4
4501 78 0003Product DataSpare Parts Data1.4
4601 78 0008Manufacturer’s InstructionsPreventative Maintenance3.5
4701 78 0008Manufacturer’s InstructionsCondition Monitoring (Predictive Testing)3.5
4801 78 0008Manufacturer’s InstructionsInspection3.5
4901 78 0008Manufacturer’s InstructionsInstructions1.5.1
5001 78 0010Operation and Maintenance DataOperation and Maintenance Manuals3.3G
5101 78 0011Closeout SubmittalsAs-Built Drawings3.1G
5201 78 0011Closeout SubmittalsRecord Drawings3.2G
5326 05 00.00 4001Preconstruction SubmittalsMaterial, Equipment, and Fixture Lists2.1
5426 05 00.00 4003Product DataWire and Cable3.2G
5526 05 00.00 4003Product DataCircuit Breakers3.2G
5626 05 00.00 4006Test ReportsContinuity Test3.2G
5726 05 00.00 4006Test ReportsPhase-Rotation Tests3.2G
5826 05 00.00 4006Test ReportsInsulation Resistance Test3.2G
5926 05 00.00 4008Manufacturer’s InstructionsManufacturer's Instructions3.1
6026 05 13.00 9803Product DataCable Tags3.2.5G
6126 05 13.00 9803Product DataFireproof Tape2.2G
6226 05 13.00 9803Product DataSplice Kits2.1G
6326 05 13.00 9806Test ReportsField Testing3.3G
6426 05 13.00 9807CertificatesSplicer/Terminator Certifications1.4.1G
6526 05 13.00 9808Manufacturer’s InstructionsSplice Kits2.1G

&RPage &P of &N

File details come from the government source that posted it.