6_-_Hazardous_Waste_Generation_Form.doc
DOC document 39 KB Posted
- Solicitation number
- FA252119BA019
About this file
This document contains a pre-solicitation notice and description for solicitation number FA252119BA019 to repair generators at buildings 50225 and 54800 at Cape Canaveral Air Force Station in Florida. The solicitation will be issued as an invitation for bids for a single-award construction contract providing all materials, labor, and equipment to repair the electrical redundancy system and generators at building 85125, including replacement of transformers. The performance period is 230 calendar days beginning within 10 days of notice to proceed, with notice to proceed issued within 30 days of award. The acquisition is set aside for service-disabled veteran-owned small businesses and will utilize the wide area workflow system for payment. The anticipated solicitation release date is August 7, 2019.
Attachment 6 Hazardous Waste Form
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION
| PROJECT #: |
| SXHT |
| PROJECT TITLE: |
CONTRACTOR:
CONTRACT #
POINT OF CONTACT:
FA2521- - -
PHONE:
FAX:
| HAZARDOUS MATERIAL: |
| DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL |
(INCLUDE METHOD OF APPLICATION)
| DESCRIPTION OF WASTE: |
| QUANTITY: |
Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.
Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:
1) Must remove and dispose of paints, building components, or equiptment containing hazardous materials (lead, mercury, etc.)
2) Submits an MSDS for approval of use of a material known to be hazardous.
On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.
1. Project #: Provide installation project number.
2. Project Title: Provide installation project title.
3. Contractor: Enter complete name of contractor performing process.
4. Point of Contact: Provide name of individual knowledgable on requirements of materials listed.
5. Phone/Fax: Provide phone and fax numbers for point of contact.
6. Hazardous Material: Provide common name of each hazardous material
7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).
8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.
9. Quantity: Estimate quantity of waste to be generated
10. Sign and date each form at bottom
CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________
File details come from the government source that posted it. Updated .