This document provides historical program information and estimated workload indicators for the Instrumentation Radar Support Program contract. The contract will provide logistics sustainment support for instrumentation tracking systems including radar, telemetry, and optics at 26 test ranges worldwide. Services will include inventory management, stock acquisition, component repair, engineering investigations, system modifications, and on-site overhauls. Estimated requirements over the five-year period include routine requisitions, component remanufacturing, engineering support hours, and planned overhauls by location. Additional high-dollar actions are also projected. Responses to the pre-solicitation notice were due by June 29, 2018. The NAICS code is 334511 with a size standard of 1,250 employees. The applicable security clearance is Secret and facility clearance is Top Secret.
Attachment L-01 Historical Info
View the file
Other files for this federal contract opportunity
Show all 50
Instrumentation Range Support Program has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA252119RA007
(REF) FA2521-18-R-0024
RFP Attachment L-01 June 27, 2019
1 13 February 15
INSTRUMENTATION RADAR SUPPORT PROGRAM
HISTORICAL PROGRAM INFORMATION / WORKLOAD INDICATORS
GENERAL PROGRAM REQUIREMENTS AS COVERED IN SOW PARAGRAPHS 1.0, 2.0, AND 3.0:
1. Program Variables: The number of ranges and systems supported may fluctuate throughout the duration of this contract. The contract effort involves a degree of uncertainty in the final costs. This is attributable to several factors:
(a) The number of participating ranges has and may continue to either increase or decrease, driving an increase or decrease in the number of requirements being supported;
(b) The number and type of systems at any given range may go up or down as the individual range's mission requirements change; and
(c) The number of items failing and hence needing repair/replacement as well as the cost of those items will vary due to aging infrastructure, duty cycles of usage, availability of vendors, etc.
2. Contractor Interface Requirements: The contractor will be required to interface with other range contractors to provide support in a timely manner consistent with mission requirements.
3. Reference Documents: The following documents are provided for guidance only for work to be performed on this contract.
GUIDANCE TITLE
MIL-HDBK-454B General Guidelines for Electronic Equipment 15 Apr 07 ISO-10012 Measurement Management Systems Requirements for Rev 3 Measurement Processes and Measuring Equipment
15 Apr 03
4 . Inventory Management (SOW Paragraph 3.2): Government Furnished Material/Inventory currently there are approximately 34,753 total line items which consume approximately 300,000 cubic feet of warehouse space and approximately 40,000 SF of outside storage.
The largest single item is approximately 360 cubic feet and weighs approximately 6,000 pounds. The approximate value of all government-owned property is 43.7 million dollars.
The actual value will vary according to the inventory and is described more fully in the documentation requirements established by the Government-Furnished Property Clause.
5. Obsolescence Engineering (SOW Paragraph 3.3): Approximately 3,000 hours are estimated per contract year to perform obsolescence engineering.
6. Configuration Management and Drawings: There are no program configuration management requirements. Each range participant is responsible for their local configuration management; therefore, there is no central repository of configuration drawings available.
DRAFT
FA2521-18-R-0024
Instrumentation Range Support Program
Attachment L-01 June 27, 2019
2 13 February 15
RANGE REQUIREMENTS AS COVERED IN SOW PARAGRAPH 4.0:
1. Material Acquisition (SOW paragraph 4.1): This is handled as stock replenishment actions during requisitioning, SOW 4.1, remanufacture & fabrications, SOW 4.1.2, and overhaul actions, SOW 4.2, and will fall into under $35K and over $35K requirements.
a. Under $20K material acquisition requirements: Requisitions requirements under SOW para 4.1, previously requisitions under $20K have been between 300 to 400 each year depending on participating ranges’ requirements for that year. Previously 100 to 200 of the requisitions submitted have resulted in under $20K remanufacture/fabrication actions under SOW para 4.2.
b. Over $20K material acquisition requirements: Previously the program had between 200 and 300 high cost actions each contract ordering period, SOW paragraphs’ 4.1, 4.2, and
4.4. Requisitions over $20K SOW paragraph 4.1 are considered High Cost Requisitions (HCR)s, and will vary significantly each year based on actual range requirements.
Component Remanufacture /Fabrication HCRs covered under SOW para 4.2 generally fall between 0 to 15.
2. Budgetary requests and Request for Proposals (Can cover SOW paragraphs 4.3 and 4.4): Typically there will be times during the year that ranges will need to submit changes to their existing requirements or new requirements such as system modifications in order to meet mission requirements. These requirements will typically fall into two categories:
a. SOW Requirements: The contractor shall provide “budgetary" estimates for SOW requests in the form of an abbreviated Cost Proposal (approximately 0-20 per year) when requested by the Government. Typically SOW requests will fall into Overhaul para 4.2. Of these approximately 0-10 abbreviated Cost Proposals, typically 0 to 5 will result in a request for proposal to the contractor.
b. System Modifications: System modification requests could come as budgetary requests or a formal request for proposal. If requested by the Government, the contractor shall provide budgetary estimates for system modification requests in the form of an abbreviated Cost Proposal (approximately 0-10 per year). Typically 0 to 5 of these budgetary requests will result in a formal request for proposal and could require both a technical and cost proposal. These will be negotiated separately and added subject to availability of funding.
3. Component Remanufacture/Fabrication (SOW Paragraph 4.1.2): Previously, 100 to
300 will be repairables under $20K covered under this SOW paragraph for each ordering period. Of these total number of reparable actions 5 to 15 have historically resulted in over $20K actions for each ordering period.
4. Engineering Support, Field Support, Technical Studies/Investigations (SOW
Paragraph 4.2)
a. Engineering Support: This action will be handled according to SOW paragraph 4.2.1 Engineering and is calculated using manweeks. A manweek for US ranges is based on
Attachment L-01
3 13 February 15
56 direct labor hours - 40 work-performance hours and 16 hours for travel time to and from the requesting site. A manweek for FMS ranges is based on 72 direct labor hours - 40 work-performance hours and 32 hours for travel time. Historical Workload indicators for engineering and technical support vary significantly depending on system failures and mission requirements. Typically the program’s annual requirement’s call yields 113 to 314 manweeks requested by the ranges. Field Support: These requirements generally include labor, materials, equipment and/or special projects. The support contractor will propose based on a SOW, and this may involve a proposal to a subcontractor. This action will be handled according to SOW paragraph 4.2.2. Some of the typical problems encountered are listed below; however, this list is not all inclusive:
Alignments, Electronic or mechanical Slip Ring or Cable-wrap problems Alignments and or repairs of Transmitters Servo Alignments and/or repairs Computer Interface issues Checkout and resolve unique system problems Tape Drive and Magnetic Head problems Plotter Problems Training in Operations and Maintenance of Member Systems
Manweek Scenarios:
Scenario Skill Mix # Hours Antenna Problems Electrical Engineer
Field Service Engineer Electrical Technician
Alignments and/or repairs of receivers (RF and IF) issues
Electrical Engineer Field Service Engineer
Calibration and Accuracy Evaluation
Field Service Engineer Electrical Technician
Gear Box Problems Field Service Engineer Mechanical Technician
Software/Firmware Issues Software Engineer Systems Integration Analyst
b. Technical Investigations: Approximately 2-5 technical studies and/or investigations per contract year are anticipated. These are added as needed throughout the life of the contract to meet a range’s mission requirements. This action will be handled according to SOW paragraph 4.2.3.
5. Pre-Overhauls/Overhauls (SOW Paragraph 4.3): The numbers of overhauls will vary each year according to ranges’ mission requirements. Historically a contract year has had between 4 and 11 overhauls during the ordering period. Workload indicators for the projected number of overhauls per range for each year are listed beginning on page 11 of this document. The number of actual overhauls could vary significantly and will fluctuate between from 0 to 17 per fiscal year.
Attachment L-01
4 13 February 15
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
WORKLOAD INDICATORS for
1 Jan 21 – 30 SEP 21
Following are the estimated number of actions to be supported:
1. ROUTINE & EMERGENCY REQUISITIONS: 594
(Requisitions under $35K)
3. COMPONENT REMANUFACTURE and FABRICATION: 191 (Under $35K-includes those from requisitions)
4. ENGINEERING FIELD SUPPORT: 161*
NOTE: The quantities of the items to be supported above represent the government's estimate of actual work requirements. These requirements can and do change during the program’s annual requirement’s call and throughout the year based on range mission requirements, funding availability, and actual system failures experienced during the fiscal year.
*The 161 manweeks of Engineering Field Support are estimated as follows:
RANGE MANWEEKS RANGE MANWEEKS
96 TW 4 NASA/A 2
NAWC/WD-C 5 YPG 5
PMRF 2 NAWC/WD-P 8
CCM 1 DOE 5
AFLCMC 2 ATC 8
45 SW 12
WSMR 40* SWEDEN 2
WSMR-PRST 12* KOREA 2
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 8
SMC/CO 2 NORWAY 2
UTTR 3 SWITZERLAND 1
NASA/W 5 SMC/SY 12
* NOTE: WSMR on-site representative is split as follows WSMR - 22 manweeks, WSMR-PRST - 12 manweeks.
Attachment L-01
5 13 February 15
1 OCT 21 – 30 SEP 22
1. ROUTINE & EMERGENCY REQUISITIONS: 607
3. COMPONENT REMANUFACTURE and FABRICATION: 191
4. ENGINEERING SUPPORT: 163*
annual requirement’s call and throughout the year based on range mission requirements, *The 163 manweeks of Technical Field Support are estimated as follows:
96 TW 4 NAWC/WD-P 8
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 6
AFLCMC 2 NASA/A 2
45 SW 12
WSMR 40* SWEDEN 0
WSMR-PRST 12* KOREA 2
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 8
SMC/CO 2 NORWAY 2
UTTR 3 SWITZERLAND 4
YPG 5 SMC/SY 12
Attachment L-01
6 13 February 15
FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 22 – 30 SEP 23
1. ROUTINE & EMERGENCY REQUISITIONS: 615
3. COMPONENT REMANUFACTURE and FABRICATION: 188
4. ENGINEERING SUPPORT: 156*
annual requirement’s call and throughout the year based on range mission requirements, *The 156 manweeks of Technical Field Support are estimated as follows:
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 5
AFLCMC 2 NASA/A 2
45 SW 12
WSMR 40* SWEDEN 0
WSMR-PRST 12* KOREA 3
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 8
SMC/CO 2 NORWAY 2
YPG 5 SMC/SY 8
Attachment L-01
7 13 February 15
FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD
INDICATORS for
1 OCT 23 – 30 SEP 24
1. ROUTINE & EMERGENCY REQUISITIONS: 600
3. COMPONENT REMANUFACTURE and FABRICATION: 190
4. ENGINEERING SUPPORT: 163*
annual requirement’s call and throughout the year based on range mission requirements, *The 163 manweeks of Technical Field Support are estimated as follows:
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 5
AFLCMC 2 NASA/A 2
45 SW 12
WSMR 40* SWEDEN 2
WSMR-PRST 12* KOREA 3
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 10
SMC/CO 2 NORWAY 2
UTTR 3 SWITZERLAND 4
Attachment L-01
8 13 February 15
1 OCT 24 – 30 SEP 25
1. ROUTINE & EMERGENCY REQUISITIONS: 603
3. COMPONENT REMANUFACTURE and FABRICATION: 194
4. ENGINEERING SUPPORT: 165*
annual requirement’s call and throughout the year based on range mission requirements, *The 165 manweeks of Technical Field Support are estimated as follows:
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 6
AFLCMC 2 NASA/A 2
45 SW 14
WSMR 40* SWEDEN 0
WSMR-PRST 12* KOREA 3
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 10
SMC/CO 2 NORWAY 2
Attachment L-01
9 13 February 15
1 OCT 25 – 30 SEP 26
1. ROUTINE & EMERGENCY REQUISITIONS: 635
3. COMPONENT REMANUFACTURE and FABRICATION: 198
4. ENGINEERING SUPPORT: 162*
annual requirement’s call and throughout the year based on range mission requirements, *The 162 manweeks of Technical Field Support are estimated as follows:
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 5
AFLCMC 2 NASA/A 2
45 SW 14
WSMR 40* SWEDEN 0
WSMR-PRST 12* KOREA 3
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 8
SMC/CO 2 NORWAY 2
Attachment L-01
10 13 February 15
1 OCT 26 – 30 SEP 27
1. ROUTINE & EMERGENCY REQUISITIONS: 632
3. COMPONENT REMANUFACTURE and FABRICATION: 200
4. ENGINEERING SUPPORT: 162*
annual requirement’s call and throughout the year based on range mission requirements, *The 162 manweeks of Technical Field Support are estimated as follows:
NAWC/WD-C 5 DOE 5
PMRF 2 ATC 8
CCM 1 NASA/W 5
AFLCMC 2 NASA/A 2
45 SW 14
WSMR 40* SWEDEN 0
WSMR-PRST 12* KOREA 3
AUTEC 4 GERMANY 4
NAWC/AD 10 UK 8
SMC/CO 2 NORWAY 2
UTTR 4 SWITZERLAND 4
Attachment L-01
11 13 February 15
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Jan 21 – 30 Sep 21
RANGE RADAR/T
M/
OPTICS
S/N RADAR SITE
1. WSMR FPS-16 4 Stallion, NM
2. NSMC/SY AN/FPQ-15
C-Band 2 Ascension Island
3. 96 TW FPS-16 #32
Ft Walton Beach, FL
4. 96 TW SA#4
(TAS3)
104 Port St. Joe, FL
5. PMRF Radar TBD TBD
6. PMRF Radar TBD TBD
7. PMRF Telemetry TBD TBD
8. PMRF Telemetry TBD TBD
9. PMRF Telemetry TBD TBD
10. PMRF Optics TBD TBD
11. NAWC/AD MIR
AN/FPQ-17
001 Patuxent NAS, MD
12. NASA/Armstrong Datron (pedestal only)
123 Edwards AFB, CA
13. Center for Countermeasures
KTM TBD TBD
14. WMSR-PRST ELTS-1 1300035 White Sands Missile Range, NM
15. WSMR-PRST ELTS-2 1300034 White Sands Missile Range, NM
16. WSMR-PRST TTS-5 TBD Mobile Sys, White Sands Missile
Range, NM
17. NASA-Wallops RIR-778C radar #2 82013 Wallops Island, VA
Note 1: The above table reflects the projected workload indicators for the FY indicated.
Ranges may add and delete overhauls based on mission needs and funding availability.
Attachment L-01
12 13 February 15
1 Oct 21 – 30 Sep 22
RANGE RADAR/TM/
OPTICS
S/N RADAR SITE
1. WSMR FPS-16 16 Phillips Hill, NM
2. SMC/SY AN/FPS-134 C-
Band N/A Exmouth, Western
Australia
3. 96 TW RIR 980 #2 BAE00265
Ft Walton Beach, FL
4. 96 TW Datron #3 (TAS 2)
103 Ft Walton Beach, FL
5. UTTR RIR980S 7 South Range, Dugway, UT
6. PMRF Radar TBD TBD
7. PMRF Radar TBD TBD
8. PMRF Telemetry TBD TBD
9. PMRF Telemetry TBD TBD
10. NASA/Armstrong RPM (pedestal only) 003 Edwards AFB, CA
11. DOE R-3 Tonopah, NV
12. NASA/Wallops RIR-778C radar
#8 94078 Wallops Island, VA
13. United Kingdom RIR-779 TBD So. Uist, Hebrides
14. Switzerland TBD TBD TBD
Attachment L-01
13 13 February 15
1 Oct 22 – 30 Sep 23
RANGE RADAR/T
M/
OPTICS
S/N RADAR SITE
1. WSMR FPS-16 33 WILDE Site
2. 96 TW SA#1
(TAS3)
101 Ft Walton Beach, FL
3. 96 TW Malibu 7.3m
(TAS2)
101 Ft Walton Beach, FL
4. PMRF Radar TBD TBD
5. PMRF Telemetry TBD TBD
6. PMRF Telemetry TBD TBD
7. PMRF Telemetry TBD TBD
8. PMRF Telemetry TBD TBD
9. PMRF Optics TBD TBD
10. NAWC/AD MTAV MTAV1 Patuxent NAS, MD
11. NASA/Armstrong LRO-1 BLP-
Edwards AFB, CA
12. DOE R-4 Tonopah, NV
13. NASA/Wallops RIR-716 radar #18 49 Wallops Island, VA
14. United Kingdom RIR-779 TBD So. Uist, Hebrides
Attachment L-01
14 13 February 15
1 Oct 23 – 30 Sep 24
S/N RADAR SITE
1. WSMR FPS-16 40 ADAMS site by Hollomon
AFB
2. 96 TW SA#6 (D-
1C)
106 Panama City, FL
3. 96 TW FPS-16 27 Port St. Joe, FL
4. PMRF Radar TBD TBD
5. PMRF Telemetry TBD TBD
6. PMRF Telemetry TBD TBD
7. PMRF Telemetry TBD TBD
8. PMRF Telemetry TBD TBD
9. NASA/Armstrong RIR-716 34 Edwards AFB, CA
10. NASA/Wallops RIR-716 radar #3 8 Wallops Island, VA
11. United Kingdom MPS-39 5 Aberporth, Wales
12. United Kingdom CW Doppler DRX413
Eskmeals, Cumbria
Attachment L-01
15 13 February 15
1 Oct 24 – 30 Sep 25
S/N RADAR SITE
1. SMC/SY AN/FPQ-15 C-
Band
2 Ascension Island
2. 96 TW SA #5 (C-12) 105 Niceville, FL
3. 96 TW FPS-16 20 Ft Walton Beach, FL
4. UTTR RIR-980W 6 Wendover, UT
5. PMRF Radar TBD TBD
6. PMRF Telemetry TBD TBD
7. PMRF Telemetry TBD TBD
8. PMRF Telemetry TBD TBD
9. PMRF Telemetry TBD TBD
10. YPG NIDIR (TPQ-39) 2104 Yuma, AZ
11. NASA/Armstrong RIR-716 38 Edwards AFB, CA
12. WSMR-PRST TTS-1 TBD M.V. Pacific Collector, Portland, OR
13. NASA/Wallops 7m #1 (mobile) 150118-01 Wallops Island, VA
14. United Kingdom RIR TBD So. Uist, Hebrides
Attachment L-01
16 13 February 15
1 Oct 25 – 30 Sep 26
S/N RADAR SITE
1. SMC/SY AN/FPS-134
C-Band
N/A Exmouth, Western Australia
2. PMRF Radar TBD TBD
3. PMRF Telemetry TBD TBD
4. PMRF Optics TBD TBD
5. YPG FPS-16 Yuma, AZ
6. Center for
Countermeasures
KTM TBD TBD
7. WSMR-PRST TTS-3 24273TE Mobile System, Kwajalein Atoll
8. United Kingdom RIR TBD So. Uist, Hebrides
Attachment L-01
17 13 February 15
1 Oct 26 – 30 Sep 27
S/N RADAR SITE
1. UTTR RIR-980S 7 South Range, Dugway, UT
2. PMRF Radar TBD TBD
3. PMRF Radar TBD TBD
4. PMRF Telemetry TBD TBD
5. PMRF Telemetry TBD TBD
6. PMRF Telemetry TBD TBD
7. YPG MPS-25 XN-2 Yuma, AZ
8. Center for
Countermeasures
KTM TBD TBD
9. WSMR-PRST TTS-2 TBD S.S. Pacific Tracker, Portland, OR
10. WSMR-PRST TTS-4 24272TE Mobile System, Kwajalein Atoll
Attachment L-01
18 13 February 15
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 JAN 21-30 SEP 21
The following historical data are the estimated number of additional actions that may be supported after the program’s annual requirements call:
1. MATERIAL ACQUISITIONS:
HIGH COST ROUTINE & EMERGENCY REQUISITIONS (over $35K): 0 - 165
2. COMPONENT REMANUFACTURE and FABRICATION:
(Over $35K-includes those from requisitions) 0 - 49
3. ENGINEERING (Manweeks): 0 - 161 (Each engineering action historically involves one manweek. A manweek is (US Ranges: 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs; (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 - 668
(This equates to the estimated number of manweeks to be performed by the contractor which includes labor, materials, equipment, and/or special projects and requires a proposal.)
4. OVERHAULS: 0 - 17
NOTE: The information above represents high cost requisitions, component remanufacture and fabrication actions over $35,000; engineering field support, and overhauls. The quantities of high cost and additional actions to be supported above represent the historical collection of actual work requirements along with member range projections, and will fluctuate based on system age, failures, mission needs, obsolescence issues, and funding availability.
Attachment L-01
19 13 February 15
1 OCT 21 – 30 SEP 22
1. MATERIAL ACQUISITIONS
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 172
(Over $35K-includes those from requisitions) 0 - 52
3. ENGINEERING (Manweeks): 0 - 163
(Each field support action historically involves one manweek. A manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 – 612
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 - 14
fabrication actions over $35,000; engineering field support, and overhauls added after. The quantities of high cost and additional actions to be supported above represent the historical collection of actual work requirements along with member range projections, and will fluctuate based on system age, failures, mission needs, obsolescence issues, and funding availability.
Attachment L-01
20 13 February 15
1 OCT 22 – 30 SEP 23
supported after the program’s annual requirements call:
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 163
(Over $20K-includes those from requisitions and overhauls) 0 - 43
3. ENGINEERING (Manweeks): 0 - 156 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 – 645
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 – 14
high cost and additional actions to be supported above represent the historical collection of
Attachment L-01
21 13 February 15
1 OCT 23 – 30 SEP 24
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 166
(Over $35K-includes those from requisitions) 0 - 44
3. ENGINEERING (Manweeks): 0 - 163 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 – 671
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 - 12
high cost and additional actions to be supported above represent the historical collection of
Attachment L-01
22 13 February 15
1 OCT 24 – 30 SEP 25
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 183
(Over $35K-includes those from requisitions) 0 - 50
3. ENGINEERING (Manweeks): 0 - 165 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 - 698
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 - 14
high cost and additional actions to be supported above represent the historical collection of
Attachment L-01
23 13 February 15
1 OCT 25 – 30 SEP 26
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 193
(Over $35K-includes those from requisitions) 0 - 53
3. ENGINEERING (Manweeks): 0 - 162 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 – 620
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 - 8
high cost and additional actions to be supported above represent the historical collection of
Attachment L-01
24 13 February 15
1 OCT 26 – 30 SEP 27
HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 193
(Over $35K-includes those from requisitions) 0 - 50
3. ENGINEERING (Manweeks): 0 - 162 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)
FIELD SUPPORT: 0 – 616
(This equates to the estimated number of manweeks to be performed
4. OVERHAULS: 0 - 10
high cost and additional actions to be supported above represent the historical collection of
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 Jan 21 – 30 SEP 21 |
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 OCT 21 – 30 SEP 22 |
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 OCT 22 – 30 SEP 23 |
| 1 OCT 23 – 30 SEP 24 |
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 OCT 24 – 30 SEP 25 |
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 OCT 25 – 30 SEP 26 |
| ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for |
| 1 OCT 26 – 30 SEP 27 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Jan 21 – 30 Sep 21 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 21 – 30 Sep 22 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 22 – 30 Sep 23 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 23 – 30 Sep 24 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 24 – 30 Sep 25 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 25 – 30 Sep 26 |
| ESTIMATED WORKLOAD INDICATOR |
| OVERHAUL SCHEDULE |
| 1 Oct 26 – 30 Sep 27 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 JAN 21-30 SEP 21 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 21 – 30 SEP 22 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 22 – 30 SEP 23 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 23 – 30 SEP 24 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 24 – 30 SEP 25 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 25 – 30 SEP 26 |
| ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR |
| MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, |
| ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL |
| 1 OCT 26 – 30 SEP 27 |