SXHT08-1113 Haz Waste Form.doc

DOC document 39 KB Posted

Attached to
Repair Fuel Cell Vapor Extraction System Federal contract opportunity
Solicitation number
FA2521-11-R-0030
Issued by
Department of the Air Force Space Command

About this file

Hazardous Waste Form

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fuel Cell Vapor Extraction System, newest first.
File Type Posted
DBA WD FL100017 dated 22 Jul 11.pdf PDF
FA2521-11-R-0030 0002 New DBA WD.pdf PDF
11-R-0030 SF 30 Final.pdf PDF
11-R-0030 SF 30.pdf PDF
FA2521-11-R-0030.pdf PDF
11-R-0030 PERFORMANCE QUESTIONNAIRE.docx DOCX document
SXHT 08-1113 Repair Fuel Cell Vapor Extraction System 920th —
STATEMENT OF WORK.docx DOCX document
GPP.pdf PDF
DBA Wages.PDF PDF
SXHT08-1113 REPAIR FUEL CELL Plans.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT 08-1113
PROJECT TITLE:
Repair Fuel Vapor Extraction System, Bldg 647

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equiptment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________

File details come from the government source that posted it. Updated .