This document contains questions and answers related to a solicitation for Satellite Control Network Tracking Station Operations, Remote Site, and Mission Partner Support services. The solicitation is seeking proposals for operations, maintenance, and engineering support services at multiple CONUS and OCONUS satellite tracking and command stations. Key details include an estimated award date of 18 March 2024 for the IDIQ contract with a base ordering period of five years through 17 March 2029. The period of performance for the first task order is from 22 March 2024 to 21 May 2029 across a base period and multiple option years. Proposals are due by 4 December 2023. The solicitation is seeking services in support of the Air Force Space Command and involves work at sites in the United States, United Kingdom and other overseas locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| STORMS Solicitation Amendment FA251824R00010002 SF 30.pdf | ||
| STORMS Solicitation Amendment FA251824R00010001 SF 30.pdf | ||
| Attachment Eight (9) - CUI STORMS Task Order DD254.pdf | ||
| Attachment Eleven (11) - Current CBAs on CAMMO per Location.pdf | ||
| Solicitation - FA251824R0001.pdf | ||
| Attachment Three (3) - STORMS Bidders Library Instructions.pdf | ||
| Attachment Eight (8) - CUI STORMS IDIQ DD254.pdf | ||
| Attachment Ten (10) - STORMS Perf. Locations Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMEND 01 STORMS Solicitaion Q&A
| AMEND 01 - Questions and Answers | No. | Document | Section(s) | Reference Narrative | Question | Government Response |
| 1 | Attachment 7 CUI Task Order CLIN Schedule Worksheet, |
Attachment 14 CUI STORMS Staffing for SCN Locations, Solicitation_FA251824R0001
Each tab, Each tab, Section F - Deliveries or Performance N/A
N/A
N/A
Pg 9 Attachment 7 CUI Task Order CLIN Schedule Worksheet states 02 September 2024 – 31 October 24 as the Phase-In/Base period, with the remaining option years going from 01 November 2025 – 31 October 2029.
Attachment 14 CUI STORMS Staffing for SCN Locations states 22 May 24 – 21 May 25 for the base period of performance.
Solicitation_FA251824R0001 states 18 Mar 2024 to 17 Mar 2029 for the entire period of performance.
Can the Government please clarify what is the correct period of performance?
NOTE: As this question has large impact to all offeror’s proposal responses, if the Government would please consider providing the answer to this question prior to waiting for all Q&A to be released, it would be greatly appreciated. See Amend 01 - Attachment 7 with updated period of performance dates to match Attachment 14.
22 May 2025 - 21 May 2025 is correct for the base period.
Estimated award date of the IDIQ is 18 March 2024 with a base ordering period of five (5) years through 17 March 2029.
Correct period of Performance for the IDIQ is 18 March 2024 - 17 March 2029 with a one (1) five (5) year option from 18 March 2029 - 17 March 2034.
The first Task Order: Phase-in: 22 March 2024 - 21 May 2024 Base POP: 22 May 2024 - 21 May 2025 OY1 POP: 22 May 2025 - 21 May 2026 OY2 POP: 22 May 2026 - 21 May 2027 OY3 POP: 22 May 2027 - 21 May 2028 OY4 POP: 22 May 2028 - 21 May 2028 Six Month Ext POP: 22 May 2029 - 21 November 2029
| 2 | Attachment Twelve (12) – CUI STORMS Task Order Section L – Instructions Conditions and Notices to Offerors | L-8.4.3 ORGANIZATION/COPIES/ | |||||
| PAGE LIMIT | Pg 4 | Would the government consider allowing an additional 5 pages for Factor 2 Subfactor 1: Staffing at TTS & DGS and an additional 5 pages for Subfactor 2 Recruitment & Retention at all SCN Locations for a total of 15 pages for each subfactor? As they are tradeoff scored, this will give offerors the ability to provide more details regarding their approach for each of these subfactors. | Amend 01 Attachment 12, Page 4, Factor 2, Subfactor 1 and 2 page limitation increased from 10 pages to 15 pages. | ||||
| 3 | Final RFP | L-3 SUBMISSION OF PROPOSALS and l-8.4.2 Electronic Copies | Pg 9 | Respectfully request the Government add STORMS Solicitation Number FA251823R0035 to the PIEE system. | PIEE System will be updated after Amendment 01 is posted on SAM.gov to ensure all updates have been captured correctly. The PIEE solicitation module requires the Government to upload all approved Offeror's CAGE Codes and those who have been approved, will have access to the PIEE Solicitation and all documentation. | ||
| 4 | Final RFP | ||||||
| Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors.pdf | L-3.1 | L-3.1 states: " ...Proposals shall be received by the PCO no later than 01:00 PM Mountain Time (MT) on 27 November 2023. …" | Given the draft solicitation came out on 10/13/23 with vendor questions due to the Government 11/1/23 (six business days after the final solicitation was released), the bidder's library (77 documents) was not released with the draft so vendors first access was the morning of the 25th, the final solicitation document does not provide CBAs for Telemetry and Commanding Station (TCS), “LION”, 23 SOPS/OL-A, United Kingdom (UK) Ministry of Defense (MOD) Oakhanger, Hampshire, UK, vendors have not been provided guidance for the procedures necessary to provide UK partners the requisite CUI solicitation documents, and the fact that vendor proposals are due to the Government the Monday following a long holiday weekend puts all bidder's, other than the incumbent, at a significant disadvantage. We respectfully request the Government change the proposal due date from November 27th to December 11 or later. | The following CUI documents are releasable to UK contractors: CUI REL to USA, GBR STORMS IDIQ PWS – Final Amend 01, CUI REL to USA, GBR STORMS TO PWS – Final Amend 01, BL - CUI REL TO USA, GBR TCS SATCOM Mission Equipment_Redacted pgs 14-18, BL - CUI REL TO USA, GBR TCS SATCOM Mission Equipment_Redacted pgs 15-28, BL - CUI REL TO USA, GBR TCS Site Inventory, BL - CUI REL TO USA, GBR TMDE TCS1_Redacted, BL - CUI REL TO USA, GBR TMDE TCS2_Redacted, BL - CUI REL TO USA, GBR TMDE TCS3_Redacted, BL - CUI REL TO USA, GBR TCS IT Inventory 1 Redacted PIEE, BL - CUI REL TO USA, GBR TCS IT Inventory 2 Redacted PIEE, BL - CUI REL TO USA, GBR CA_CRL TCS1_Redacted PIEE |
Any other CUI documents or Technical Orders are not authorized be released to UK contractors without US Government approval.
5 Attachment 12 and 13 Factor 1 - Experience Gate Respectfully request that the Government consider amending the solicitation to allow all subcontractor experience(s) to be evaluated for consideration of award? If allowed, will the Government consider extending the proposal due date to 11 December 2023? The Government has thouroughly reviewed this request with the Satellite Control Network subject matter experts and due to the magnitude of this project with overseas (includes OCONUS and foreign) and OCONUS sites, the evaluation factors will not be revised.
The Government is extending the proposal due date to 4 December 2023 at 1300 MT.
| 6 | Attachment 12 CUI STORMS Task Order Section L Instructions Conditions and Notices to Offerors | L-11.2 - Price and Supporting Backup Data | 8 of 11 | Section L-11.2. states “Certified cost or pricing data is not required; however, supporting data is requested to explain the methodology used developing the proposed direct and indirect rates”. | ||
| Can the Government confirm that any additional supporting price data is only required in the pricing narrative and not to be added into the Attachment 7? | Correct. Any supporting price data is only required in the pricing narative and is not to be added to Attachment Seven (7). | |||||
| 7 | Attachment Two (2) -CUI STORMS Task Order PWS | 3.2.3.7 | 33 | PWS paragraph 3.2.3.7 provides Table 3-2 DoDM 8140.03 Intermediate Level Requirements which does not match the DoD Cyber Workforce Qualifications for DoDM 8140.03 dated February 15, 2023. |
Can the Government please confirm that offerors are to adhere to the DODM 8140.03 Manual and Workforce Qualifications? The Government believes Table 3-2 is correct as stated in the PWS. All 8104 certified personnel must meet the requirements outlined in Table 3-2. The Government has selected the Personal Certification as the only option to meet the Foundational Qualification requirement. The list of acceptable certifications are listed in Table 3-2.
8 Attachment 12 CUI STORMS Task Order Section L Instructions Conditions and Notices to Offerors L-8.4.1 3 Section L-8.4.1 PAGE FORMAT states, “The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary.”
Q1: Can the Government please clarify if screenshots are exempt from font requirements?
Q2: Can the Government please clarify if headers/footers are allowable at 8 pt font? A1: Screenshots are exempt from the font requirements, as long as they remain easily readable (ie.. not smaller than 8 pt font) and only used when absolutely necessary. Screenshots shall also not take the place of information that can normally be documented in the proposal and shall not take up the full page to only meet the page limitations.
A2: Headers/Footers are allowable no smaller than Times New Roman 8 pt font.
This information was added to Amend 01 - Attachment Twelve (12), L-8.4.1 PAGE FORMAT.
| 9 | Attachment 12 CUI STORMS Task Order Section L Instructions Conditions and Notices to Offerors | General | General | Q1: Can offerors supply exhibits as back up information within Subfactor 3 to accompany the Service Contract Act (SCA) Wage Determination(s) (WDs) Details and Collective Bargaining Agreement (CBA) Details? | ||
| Q2: If so, can the exhibits be outside of page count? | A1: Offerors are not allowed to supply exhibits as backup information within Subfactor 3 to accompany the SCA WD or CBA. The Government believes that the necessary information is requested and can be documented in Attachment Fourteen (14). |
A2: N/A based on the Government's response to A1.
10 Attachment Four (4) - CUI STORMS Mgt. Experience Form Table 1 Within the table on the cover page of Attachment 4, it states “The form shall not exceed four (4) pages in length including this page/cover page.”
L-8.4.5 PAGES NOT INCLUDED IN PAGE COUNT states “Covers for volumes, tables of contents, glossaries, indices, title pages, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal.”
Can the Government please confirm the reference to ‘cover page’ in Attachment 4 is referring to the first page of the Attachment and not a volume cover page excluded from page count per Section L? Correct. The first page in Attachment Four (4) is not a volume cover page as described in Section L but is the first page of the attachment included in the total page count.
Amend 01 - Attachmetn Four (4) and Five (5) have been updated to allow for one additional page for responses; Amend 01 - Attachment Four (4) shall not exceed five (5) pages in length and Amend 01 - Attachment Five (5) shall not exceed eight (8) pages including the first page.
11 Attachment Five (5) - CUI STORMS Tracking Station Experience Form Table 1 Within the table on the cover page of Attachment 5, it states “The form shall not exceed seven (7) pages in length including this page/cover page. Excess pages will not be reviewed. Font Times New Roman and font size eleven (11) shall be used.”
L-8.4.5 PAGES NOT INCLUDED IN PAGE COUNT states “Covers for volumes, tables of contents, glossaries, indices, title pages, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal.”
| Can the Government please confirm the reference to ‘cover page’ in Attachment 5 is referring to the first page of the Attachment and not a volume cover page excluded from page count per Section L? | Correct. The first page in Attachment Five (5) is not a volume cover page as described in Section L but is the first page of the attachment included in the total page count. Each submitted experience form shall not exceed seven (7) pages in length including the first page. | |||||
| 12 | Attachment Eleven (11) -Current CBAs on CAMMO per Location | Attachment 13B CBA for NBAFS | 27-74 | The NBAFS Agreement pages 27-74 appears to have expired on May 28, 2023. |
Will the government be providing an updated CBA that includes current rates? Attachment 11, CBA for NGAFS, Page 66, Article 33 - Duration states:
"Except as is specifically otherwise provided herein, this Agreement shall be come effective as of August 01, 2020 and shall remain in effect until and including May 28, 2023. It shall remain in effect from year to year thereafter unless either party gives written notice to the other party of termination (and requests to negotiate a new agreement) or a desire to modify the Agreement, not less than sixty (60) days prior to May 28, 2023, or the expiration of any such subsequent yearly period."
SpOC SAIO is in receipt of the CBA from SSC who administers the current CAMMO contract with appropriate CBAs. SSC has stated this is the most current agreement on their contract.
| 13 | General | CUI | Controlled Unclassified Marking | Can the Government confirm that CUI markings are not required on any proposal submission files? If markings are required, can the Government identify which submission files should be marked and provide guidance to correctly mark said files? If marking is required, please confirm 8pt font can be used for said marking. | If a document is currently marked CUI or source selection information, it shall be submitted as such within Offeror's proposal using 8 pt font. It is the Offerrors responsibility to determine how to safely and appropriately mark their proposal submission. |
| 14 | "Solicitation - FA251824R0001" and "Attachment Seven (7) - CUI Task Order CLIN Schedule Worksheet" | Reference: "Section F - Deliverables or Performance section |
| Ordering Period' lists a Base ordering period of 3/18/2024 - 3/17/2029 for a 5 year span; However, this does not match Attachment seven (7) Task Order CLIN Schedule Worksheet, which starts performance in as 02 September 2024" | Can the Government update Attachment 7 to reflect the Ordering Period of the RFP? | Please see the Government response to Question One (1) listed above detailing the estimated Period of Performance (POP) dates and corrections made to Attachment Seven (7). |
| 15 | Solicitation - FA251824R0001 |
and Attachment Two (2) - CUI STORMS Task Order PWS All The STORMS RFP and PWS are marked as CUI. As the government knows, significant portions of the STORMS work are performed in the UK and necessarily rely on UK personnel. Offerors will need the ability to share the Draft RFP and PWS with UK companies who are able to perform such work. Will the government please provide permission and guidance (see, e.g., DoD Instruction 5200.48 § 3.7(b)(4)) for offerors to disclose this information to UK companies for the purposes of teaming and responding to the RFP? The following CUI documents are releasable to UK contractors: CUI REL to USA, GBR STORMS IDIQ PWS – Final Amend 01, CUI REL to USA, GBR STORMS TO PWS – Final Amend 01, BL - CUI REL TO USA, GBR TCS SATCOM Mission Equipment_Redacted pgs 14-18, BL - CUI REL TO USA, GBR TCS SATCOM Mission Equipment_Redacted pgs 15-28, BL - CUI REL TO USA, GBR TCS Site Inventory, BL - CUI REL TO USA, GBR TMDE TCS1_Redacted, BL - CUI REL TO USA, GBR TMDE TCS2_Redacted, BL - CUI REL TO USA, GBR TMDE TCS3_Redacted, BL - CUI REL TO USA, GBR TCS IT Inventory 1 Redacted PIEE, BL - CUI REL TO USA, GBR TCS IT Inventory 2 Redacted PIEE, BL - CUI REL TO USA, GBR CA_CRL TCS1_Redacted PIEE
Any other CUI documents or Technical Orders are not authorized be released to UK contractors without US Government approval.
16 Attachment One (1) - CUI STORMS IDIQ PWS and
Attachment Two (2) - CUI STORMS Task Order PWS
Section 3.18
Section 3.5.1.2
Atch 1 Section 3.18. States: "Contractor shall develop, implement, and maintain a Quality Program on par with or exceeding ISO 9000 to ensure service delivery meets or exceeds all performance requirements in the IDIQ or task order."
3.5.1.2 States: "The quality program shall follow Aerospace Standard AS9100D."
As there are currently no Aerospace maintenance requirements as part of the work, please confirm ISO 9001 is the quality requirement for this procurement. ISO 9001 is the correct standard. Both Attachment One (1) - CUI STORMS IDIQ PWS and Attachment Two (2) - CUI STORMS Task Order PWS have been updated 17 Attachment One (1) - CUI STORMS IDIQ PWS and Attachment Two (2) - CUI STORMS Task Order PWS
Section 10
Section 4 In the table in Section 10 there is reference to DAFI 21-101 and TO 00-20-1, which is Aircraft Maintenance Management and Aerospace Equipment Maintenance Inspection, Documentation, Policies, and Procedures; HOWEVER, these are not called out anywhere within the PWS.
In the table in Section 4 there is reference to DAFI 21-101 and TO 00-20-1, which is Aircraft Maintenance Management and Aerospace Equipment Maintenance Inspection, Documentation, Policies, and Procedures; HOWEVER, these are not called out anywhere within the PWS. Can the Government please confirm all references to aerospace/aircraft maintenance instructions and TO’s should be removed.
In regards to Attachment Two (2) - CUI STORMS Task Order PWS: DAFI 21-101 was errorounsly listed as AFI 21-101 . PWS was updated to reflect DAFI 21-101 and the document is referenced in PWS para 3.3.1.2.2
In regards to both Attachment One (1) - CUI STORMS IDIQ PWS and Attachment Two (2) - CUI STORMS Task Order PWS those documents are referenced because they contain standard DAF maintenance practices that form the baseline for SCN maintenance actions.
18 Attachment One (1) - CUI STORMS IDIQ PWS Section 2.4 2.4. CONTRACTING MANPOWER REPORTING (CMR) states: "The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this IDIQ contract and task orders via a secure data collection site. The contractor is required to completely fill in all required data fields required for CMR. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year." This is an outdated requirement. The Government no longer uses Manpower Reporting but replaced it with SCR Reporting via SAM.gov. Respectfully request the Government update this requirement with 52.204-14, Service Contract Reporting Requirements. Changed attachment One (1) - CUI STORMS IDIQ PWS to:
2.4 Services Contract Inventory
IAW with DFARS 204.17, the Contractor shall report annually, by October 31, at https://www.sam.gov, on the services performed, including any first-tier subcontracts, during the preceding Government fiscal year (October 1 - September 30).
Changed Attachment Two (2) - CUI STORMS Task Order PWS to:
2.4.3 Services Contract Inventory
IAW with DFARS 204.17, the Contractor shall report annually, by October 31, at https://www.sam.gov, on the services performed under this order, including any first-tier subcontracts, during the preceding Government fiscal year (October 1 - September 30).
19 Attachment Four (4) - CUI STORMS Mgt. Experience Form and
| Attachment Five (5) - CUI STORMS Tracking Station Experience Form | All | Instructions/guidance, control information, etc., currently occupy over 20 lines on the experience forms provided by the Government. Vendors have very limited page allocation for our Volume I submission, four (4) pgs. for each form in SF1 and seven (7) pgs. for each form in SF2. | Can the government confirm instructions/guidance, control information, etc., are to be removed from the Attachments 4 and 5 forms prior to submission? | Amend 01 - Attachment Four (4) and Five (5) have been updated to allow one additional page for responses. | |||
| 20 | Attachment Six (6) - CUI Task Order Mission Essential Contractor Services by PWS Paragraph | Section under PWS Section 3.10: Civil Engineering Support | On the final line on the final page of Attachment 6 in the section titled: PWS Section 3.10: Civil Engineering Support, there is a reference to a PWS paragraph that does not exist - 3.12.11.2. | Can the Government confirm that the line item 3.12.11.2 is in error and should be deleted or if it should refer to a different paragraph number? | Amend 01 - Attachment Six (6) has been updated to correct the last reference to 3.10.11.2. | ||
| 21 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Sections L-3.1 and L-8.4.2 | L-3.1 Offerors shall submit one (1) complete proposal via PIEE…, L-8.4.2 ELECTRONIC COPIES. Offerors must be registered in PIEE and the solicitation module within PIEE, to use the solicitation module for proposal submission. Information on how to register for access to PIEE can be found at: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. | Respectfully request the Government add STORMS Solicitation Number FA2518-24-R-0001 to the PIEE system. | PIEE System will be updated after Amendment 01 is posted on SAM.gov to ensure all updates have been captured correctly. The PIEE solicitation module requires the Government to upload all approved Offeror's CAGE Codes and those who have been approved, will have access to the PIEE Solicitation and all documentation. | ||
| 22 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.2.1 and L-8.4.3 | L-8.4.2.1 states submission should be in Word and PDF | ||||
| L-8.4.3 states submission should be in Word or PDF | Please confirm a PDF submission is acceptable. | Section L-8.4.2.1 updated to "…or Portable Document Finder (PDF).." |
This information was added to Amend 01 - Attachment Twelve (12), L-8.4.2.1 PAGE FORMAT.
23 Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors and
ATTACHMENT THIRTEEN (13): STORMS Task Order Section M – Evaluation Factor for Award Section L-9.1
Section M-4.1.1.1.1 L-9.1 states: "Provide in Attachment Four (4) for each awarded US Government contracts or task orders only (NTE 3 experience references) Concurrent Contract Management Experience where the Parent/Affiliate Company/Prime Offeror has managed one (1) or more overseas (includes OCONUS or foreign) sites and one (1) or more CONUS site(s) concurrently. Concurrent is defined as either a single contract or multiple contracts with at least twelve (12) months of overlapping performance." (Emphasis added).
M-4.1.1.1.1 states: "This Subfactor will be rated “Acceptable” when it clearly demonstrates in Attachment Four (4) concurrent management of one (1) or more overseas (includes OCONUS or foreign) sites and one (1) or more CONUS sites where the combined total value exceeds $30M per year, as well as meet all of the following:
1. Experience performing a worldwide operations and maintenance contract with multiple performance locations at CONUS and OCONUS / foreign locations ..." As written the evaluation criteria (M-4.1.1.1.1) for concurrent OCONUS and CONUS operations and maintenance appears to imply the requirement must be met with a single contract.
| Are we correct to assume the statement in section L-9.1 defining concurrent " Concurrent is defined as either a single contract or multiple contracts with at least twelve (12) months of overlapping performance." should also be applied to the evaluation criteria, allowing up to three experience references to satisfy the requirement(s) to include number 1? | Amend 01 - Section M, M-4.1.1.1.1 and M-4.1.1.2.1 have been updated to cross reference the definition of "concurrent" in section L. | ||||||
| 24 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.1 | L-8.4.1 states: "The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary." | Will the government confirm that text in callout boxes and quote boxes may also be no smaller than 8 point? | L-8.4.1 has been updated to allow for callout/quote boxes no smaller than Times New Roman 8 pt font. | ||
| 25 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.1 | L-8.4.1 states: "The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary." | Will the government confirm that text in headers and footers may also be no smaller than 8 point? | See the Governments response to question 8 above -- A2: Headers/Footers are allowable no smaller than Times New Roman 8 pt font. | ||
| 26 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.1 | L-8.4.1 states: "The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary." | Will the government confirm that company logos are exempt from the font limitations and they may be submitted in their original fonts? | L-8.4.1 has been updated allowing company logos to be submitted in their original fonts. | ||
| 27 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.1 | L-8.4.1 states: "The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary." | Will the government exclude screenshots from this font requirement so they may be submitted in their native screen capture font? | See the Governments response to question 8 above -- A1: Screenshots are exempt from the font requirements, as long as they remain easily readable (ie.. not smaller than 8 pt font) and only used when absolutely necessary. Screenshots shall also not take the place of information that can normally be documented in the proposal and shall not take up the full page to only meet the page limitations. | ||
| 28 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.1 | L-8.4.1 states: "The proposal shall be submitted electronically where text shall not be smaller than Microsoft Word Times New Roman 11-point font, single column, single spacing and one-inch (1”) margins (top, bottom, left and right). The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman 8-point font, and used only when absolutely necessary." | Please confirm that these font and margin requirements do not apply to the Government-provided Excel worksheets, including Attachment 7 and Attachment 1, which should be submitted in the fonts and margins provided. | Correct. The listed font and margin requirements above do not apply to Government-provided Excel worksheets, including Attachment Seven (7) and Fourteen (14). |
This information was added to Amend 01 - Attachment Twelve (12), L-8.4.1 PAGE FORMAT.
| 29 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.2.1 | L-8.4.2.1 states: "Each volume shall be in a single searchable file, with copy/paste capability, and stored in a folder that corresponds to the proposal volume it represents." | Will the Government confirm that PIEE will allow the upload of a folder? | PIEE System will be updated after Amendment 01 is posted on SAM.gov to ensure all updates have been captured correctly. The PIEE solicitation module requires the Government to upload all approved Offeror's CAGE Codes and those who have been approved, will have access to the PIEE Solicitation and all documentation. | ||
| 30 | Attachment Twelve (12) - CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | Section L-8.4.2.1 | L-8.4.2.1 states: "Volume III Price/Contract Documents shall be submitted in Microsoft Excel and Microsoft | ||||
| Word." | Will the Government allow the Volume III narrative to be submitted in PDF as allowed for the other volumes? | Correct. See Government response above to question 22. | |||||
| 31 | Attachment Fourteen (14) - CUI STORMS Staffing for SCN Locations | General | There is currently no worksheet in the Attachment 14 workbook for Ellison Onizuka Satellite Operations Facility (EOSOF), “DICE”, 21 SOPS, Vandenberg Space Force Base (VSFB), CA. | Did the Government intentionally omit the staffing worksheet for Ellison Onizuka Satellite Operations Facility (EOSOF), “DICE”, 21 SOPS, Vandenberg Space Force Base (VSFB), CA from Attachment 14? If bidders are expected to provide staffing at EOSOF, can the Government please provide and updated Attachment 14? | This was an inadvertent error by the Government and has been updated in Amend 01 - Attachment Fourteen (14) | ||
| 32 | Attachment Fourteen (14) - CUI STORMS Staffing for SCN Locations | General | Attachment 14 is provided by the Government in an 8.5 x 11 inch page format in Excel. Excel limits the cell size yet allows text content beyond the cell boarders. This application limitation makes reading cell content without scrolling very difficult. | Given the data heavy structure of Attachment 14, respectfully request the Government allow offerors to submit Attachment 14 in and 11 x 17 inch page format to facilitate ease of readability for evaluators. | Amend 01 Attachment Fourteen (14), updated format to 11 x 17 Landscape format to allow ease of submission and readability by all parties. | ||
| 33 | Attachment One (1) - CUI STORMS IDIQ PWS and Attachment Two (2) - CUI STORMS Task Order PWS | Section 2.1.5 |
and
| Section 2.14.2 | Sections 2.1.5 (IDIQ PWS) and 2.14.2 (TO PWS) state: Under current DoD micro-thresholds and laws, a government designated Contracting Officer Representative (COR) can approve the purchase of applicable parts, materials, supplies, and other direct costs in support/scope of STORMS that are to be paid under the CR CLIN. ~~ and ~~ Under current DoD micro-thresholds and laws….. If no exception is applicable, the contractor shall submit three (3) competitive quotes for the desired supply items, other direct costs, or services for review and approval. | Can we be excluded from the overly burdensome requirement? Micro purchases fall under FAR 13 and we have an approved purchasing system (FAR 52.244-2). ADS falls under DCMA’s approval dated August 2018. The use of p-cards is the preferred method to purchase and pay for micro-purchases. | You cannot be excluded from this requirement as the Government still needs to make a fair and reasonable determination over the micro-purchase threshold for applicable parts, materials, supplies, and other direct costs in support of STORMS. | |||
| 34 | Attachment Twelve (12) – CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | L-1D1.3.1.9.a | Pg 10 | Section L-11.3.1.9.a Organizational Conflict of Interest (OCI) states “As a part of the proposal, the offeror shall provide the PCO with complete information of previous or ongoing work that is in any way associated with the contemplated acquisition or any potential OCIs of which the Offeror is known. Prime or any tier of subcontract work related to the SCN sustainment contract managed by USSF/SSC (i.e., DSLM contract) may represent an OCI that cannot be mitigated, and which may disqualify an offeror from award.” |
Also reference, DAFFARS Provision 5352.209-9001 “Potential for Organizational Conflict of Interest (Jun 2023).
| As the Government has identified a potential conflict, to aid offerors in the development of appropriate OCI Plans, can the Government clarify from their perspective the nature of the conflict? | The Government has only idientified this as a potential conflict if an Offeror is to bid or be a subcontractor for both STORMS and DSLMS. Currently, the Government is not aware of a current conflict or the nature of the conflict. It is the responsibility of the Offeror to fully understand any OCI issues and present a plan to mitigate, if any, those conflicts to the Government in their proposal. | ||||||
| 35 | Attachment Twelve (12) – CUI STORMS Task Order Section L - Instructions_Conditions_and_Notices to Offerors | L-3 | Pg 1 | With respect to PIEE submission thru the Solicitation Module, currently the solicitation is not available in PIEE. Are there additional approvals needed from the Government Contracting Officer to grant access to Contractors for solicitation proposal submission? If so, please advise of the additional PIEE/Solicitation Module requirements needed for proposal submission. | PIEE System will be updated after Amendment 01 is posted on SAM.gov to ensure all updates have been captured correctly. The PIEE solicitation module requires the Government to upload all approved Offeror's CAGE Codes and those who have been approved, will have access to the PIEE Solicitation and all documentation. |