FA2517-24-Q-2024 - B1470 PHAS III AHUS Questions.docx

DOCX document 18 KB Posted

Attached to
Building 1470 Air Handler Units Phase III , Peterson Space Force Base
Solicitation number
FA251724Q2024
Issued by

About this file

This document appears to be a set of questions and answers related to an RFQ (Request for Quote) for the Building 1470 Air Handler Units Phase III project at Peterson Space Force Base. The key details are:

The RFQ number is FA251724Q2024 and the procurement is a 100% small business set-aside under NAICS code 238220 with a $19M size standard. The project involves the repair of air handler units (AHUs) at Building 1470 per the attached Statement of Work. The questions cover topics such as electrical work, airflow requirements, vacuum levels, fan supports, and controls. The agency is the Department of the Air Force Space Command. Responses indicate the government will provide additional supporting information to the successful contractor after award.

View the file

Other files

File Type Posted
B1470 SOW - Rpr B1470 Ph 3 WT 14535593 Rev 10 Sep 24.docx DOCX document
B1470 SOW - Rpr B1470 Ph 3 8212024.pdf PDF
RFQ - B1470 AHUs 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Building 1470 Air Handler Units Phase III, Peterson Space Force Base project

RFQ: FA2517-24-Q-2024

Questions:

Here are my questions from today’s walk.

· 2.2.1 confirming this must be a licensed Electrician?

· There are the florescent and there are older incandescent fixtures are all being replaced or just the florescent?

· Replace all light fixtures in mechanical rooms with LED fixtures.

· Which light fixture is being required?

· Replace fluorescent and incandescent fixtures with equivalent LED light fixture.

· Is it ok to contact Anuj Sainjoo for an electrical contractor currently working on the base?

· You are free to contact SSgt Sainjoo or others to find current electrical contractors working on base.

· 2.3.1.1.9 has a statement “flows must match original design”

· Do you have the original design number on a set of prints?

· Original Design for North AHUs: AHU-1 9980 CFM, AHU-2 7610 CFM, AHU-3 11,000 CFM, AHU-4 8090 CFM

· We can provide successful proposer additional supporting information after award.

· If not, where do we get this information

· 2.3.1.4.5.2 States “A vacuum of 500 microns shall be achieved”.

· May we remove this as it is not refrigeration work?

· Edited 2.3.1.4.5.1 and changed 2.3.1.4.5.2 to Not Applicable.

· 2.3.1.1.3 , 2.3.1.2.4 , 2.3.1.3.4, and 2.3.1.4.9 all discuss replacing the “fan supports”

· Please define the fan supports?

· The intent was for contractor to provide any required supports like collars and/or mounting hardware.

· Could mean the floor mounted vibration isolators?

· We are not requiring vibration isolators to be replaced.

· If so, would you want them all done? On all fans?

· Controls

· How do we know the controls are operational?

· We are not aware of any issues with controls. Successful contractor should let us know of operational issues that arise.

· Do you have a member on site that can operate the controls?

· Yes, we have an EMCS Shop that can operating controls.

· Do you have a front end for the controls?

· Yes, our front end is at EMCS Shop.

· Is the control system a JCI brand?

· Yes, our front end is Johnson Controls (JCI) Metasys system.

· 13 Closeout 13.1, 13.2, 13.3, 13.4, and 13.5 do not pertain this project as we are not replacing / adding any equipment just parts and labor on existing equipment.

We have edited/eliminated these sections. Note we added a statement to articulate 1 year parts and warranty requirement.

File details come from the government source that posted it. Updated .