Transformer Questions and Answers.docx
DOCX document 14 KB Posted
- Attached to
- Transformer (750KVA) Pad Mount Replacement and Installation at Cheyenne Mountain Air Force Station
- Solicitation number
- FA251720Q0098
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Transformer Questions and Answers Updated 13July2020.docx | DOCX document | |
| Image 4.JPG | JPG image | |
| Transformer Image 3.JPG | JPG image | |
| Transformer Image 2.JPG | JPG image | |
| Transformer Image 1.JPG | JPG image | |
| Attachment 1 - Statement of Work 750KVA Transformer.pdf | ||
| Attachment 3 - Contractor Submittal Form (Services).docx | DOCX document | |
| Attachment 2 - Combo FA251720Q0098 - CMAFS Transformer Replacement and Installation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for FA2517-20-Q-0098
What is the current condition of the transformer? Unit is operational.
Wondering if there are more detailed specs on the transformer? See picture of data plate supplied.
Are there any access issues to get to it? No access issues. Transformer located on side of facility with piping above.
From the description it sounds like we will be removing the transformer and disposing. Are there any stipulations that go with that? Follow established guidelines, no stipulations.
Are the existing elbows and cables in serviceable condition and if not is there excess cable to terminate new elbows? They are serviceable, excess cable unknown.
Are there arrester elbows? Yes, feed through transformer.
What size cable? 5KB.
What size bushings? 200A.
Is there a certain manufacturer of transformer that is required? (We like to use Eirmco and Maddox) Nothing specific, prefer copper windings.
Is there an underground basement below the transformer and what dimensions? Yes, 8’X8’.
Are we expected to sectionalize to perform the outage or will that be done by others Contractor expected to isolate in vault located below transformer. (confined space entry)
Does the existing unit contain PCB's and if so, what is the contamination level? No.
Is the existing unit operational? Yes.
Why is it being replaced? Would like it changed on our terms as a potential failure unexpectedly. (39 years old) Aluminum windings.
Please provide a picture of the data plate, located within the low voltage section. See attached photo of plate.
What brand/type of transformer is currently in place? Please see attached photos.
Do you have any drawings depicting the location of the transformer to be replaced? There are no drawings for this, but there are no access issues to the transformer.