Attach_9_-_JPPSO_Notional_Floor_Plan,_N-103.pdf

PDF 2 MB Posted

Attached to
Repair JPPSO Offices B350, Various Offices B350 and OSI Offices B418
Solicitation number
FA251718R5000
Issued by

About this file

Attach 9 - JPPSO Notional Floor Plan, N-103 DRAFT

View the file

Other files

File Type Posted
Attach_17_-_01_05_00_-_PAFB_Computer_Aided_Drafting_(CAD)_Standards.pdf PDF
RFP_FA251718R5000_DRAFT_1MAR18_Redacted.pdf PDF
Attach_5_-_Bldg_350_1st_Floor,_E-101.pdf PDF
Attach_21_-_UFC_1-200-01_DoD_Building_Code_(General_Building_Requirements)_-_2016.pdf PDF
Attach_19_-_23_09_23_-_Direct_Digital_Control_(DDC)_Systems_PAFB.pdf PDF
Attach_8_-_Bldg_350_2nd_Floor,_N-102_-_Revised_9JAN18.pdf PDF
Attach_10_-_8_FIS_Notional_Floorplan,_N-104.pdf PDF
Attach_1_-_Performance_Work_Statement_JPPSO_15FEB18.pdf PDF
Attach_2_-_JPPSO_Moves_-_Revised_9JAN18.pdf PDF
Attach_7_-_Bldg_350_2nd_Floor,_E-102.pdf PDF
Attach_13_-_Bldg_350_Color_Coded_Interior_Signage_Options.pdf PDF
Attach_6_-_Bldg_350_1st_Floor,_N-101.pdf PDF
Attach_14_-_Bldg_350_Interior_Signage_Types_Options.pdf PDF
Attach_3_-_Product_List_Bldg_350,_TDKA_16-2513.pdf PDF
Attach_16_-_OSI_Facility_Guide.pdf PDF
Attach_20_-_28_31_15_-_Addressable_Fire_Alarm__Mass_Notification_System_(EST3)__PAFB.pdf PDF
Attach_22_-_UFC_1-200-02_High_Performance_and_Sustainable_Building_Requirements_-_2016.pdf PDF
Attach_11_-_Final_Furniture_Reconfiguration_21CONS-PMD.pdf PDF
Attach_15_-_21_CES_Design_Guide_20170417.pdf PDF
Attach_24_-_Bid_Schedule.pdf PDF
Attach_18_-_01_57_20.00_10_-_Environmental_Protection_PAFB.pdf PDF
Attach_23_-_UFC_3-120-10_Interior_Design_FF-E,_SID_Package_-_2007.pdf PDF
Attach_12_-_Bldg_350_-_MissionSup_Exterior_Sign_Draft.pdf PDF
Attach_4_-_Product_List_Bldg_418,_TDKA_16-2505.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 350 South side - Exhibit S1 Item S1: Remove wall, repair carpet & ceiling Item S2: Remove wall, repair carpet & ceiling Item S3: Remove wall, repair carpet & ceiling Item S4: Remove wall, repair carpet & ceiling Item S5: Remove wall, repair carpet & ceiling Item S6: Remove wall, repair carpet & ceiling Item S7: Remove wall and door, repair carpet & ceiling Item S8: Remove wall and door, repair carpet & ceiling Item S9: Remove wall, repair carpet & ceiling Item S10: Remove wall, repair carpet & ceiling

Building 350 South side - Exhibit S2 Item S11: Build wall approx. 13’ Item S12: Build wall approx. 13’ Item S13: Build wall approx. 10’ w/ door on the far left opening inward. Three pane window to the right of the door.

Item S14: Build wall approx. 13’ Item S15: Build wall approx. 10’ Item S16: Build wall approx. 13’ w/ door on the far left opening inward. Three pane window to the right of the door.

Item S17: Build wall approx. 13’ Item S18: Build wall approx. 10’ w/ door on the far left opening inward. Three pane window to the right of the door.

Building 350 North side - Exhibit N1 Item N1: Remove door. (door will be relocated to the east side wall) Item N2: Remove door. (door will be relocated to the south side wall into the hallway) Item N3: Remove doorway.

Item N4: Remove wall, repair carpet & ceiling Item N5: Remove wall, repair carpet & ceiling Item N6: Remove wall, repair carpet & ceiling Item N7: Remove sink, counter, and adjacent wall, repair carpet & ceiling Item N8: Remove wall, repair carpet & ceiling Item N9: Remove wall, repair carpet & ceiling Item N10: Remove wall, repair carpet & ceiling Item N11: Remove wall, repair carpet & ceiling Item N12: Remove door & wall, repair carpet & ceiling Item N13: Remove door & wall, repair carpet & ceiling Item N14: Remove door, repair carpet & ceiling Item N15: Remove wall, repair carpet & ceiling Item N16: Remove door & wall, repair carpet & ceiling Item N17: Remove wall, repair carpet & ceiling Item N18: Move door (to lengthen wall), repair carpet & ceiling Item N19: Remove door, repair carpet & ceiling Item N20: Remove door, repair carpet & ceiling (will be centering the door to make one office) Item N21: Remove wall, repair carpet & ceiling

JPPSO NOTIONAL FLOOR PLAN

DRAWING SHEET N-103

DRAFT

Building 350 North side - Exhibit N2 Item N22: Add wall (or use existing) approx. 10’ with door and window.

Item N23: Use existing wall approx. 14’. Repair where door was removed Item N24: Add wall approx. 13’ with door and window.

Item N25: Add wall approx. 3’ Item N26: Add door to existing wall providing entry from hallway.

Item N27: Add wall approx. 14.5’ with door and window.

Item N28: Add wall approx. 6’ with door.

Item N29: Add wall approx. 9’ with door.

Item N30: Add wall approx. 1’ with window and door on corner.

Item N31: Add wall approx. 10.5’.

Item N32: Add wall approx. 13’ with door and window.

Item N33: Add wall approx. 10.5’.

Item N34: Add wall approx. 15’ with door and multiple windows (3) (conference room).

Item N35: Add wall approx. 18’ with door and windows on each side of the door.

Item N36: Add wall approx. 4’.

Item N36: Add wall approx. 23.5’.

N

14'-0"

S1

S2 S3

S4

S5

S6

S7

S8

S9 S10

10'-5"

13'-0"

14'-0"

S11 S12

S13

S14 S16

S15

S17

S18

Window

Window

Window

U p

U p

U p

N4

N1

N2

N3

N5

N6

N7

N8

N9

N10

N11

N12 N13

N14

N15

N16

N17

N18

N19

N20

N21

10'-0"

12'-1 1/2"

U p

U p

U p

11'-3/4"

11'-9"

10'-1/2"

13'-10 1/4"

N23

N25

N27

N26

N30

N31

N32

N33

N34

N35

N37

N28

N24

N22

11'-1 1/8"

N29

N36

Window

Window

Window

Window

Window

WindowWindow Window

9'-6"

10'-5"

13'-0"

Main Entrance Reception

JPPSO Colorado PPPO Peterson

Multi-use (Counseling) Offices

Shipment Mgt Branch Chief

Storage Mgt Section Chief

Work lead Work lead

Break Area

South side of wing

Branch Chief

14'-0"

Branch NCOICBranch NCOIC

Quality Control

Shipment Mgt Section Chief

Storage ManagementShipment Management

Enterprise Spt Branch Chief

Peterson PPPO Chief

Work lead

NCOIC

Dx7 Tx7 Dx7 Tx7Dx8 Tx8 Dx8 Tx8Dx8 Tx8 Dx5 Tx5Dx1 Tx1 Dx1 Tx1

Dx1 Tx1

Dx1 Tx1

Dx1 Tx1

Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1 Dx1 Tx1

Dx1

Tx1

Data Line

Telephone

Dx2 Tx2

Dx3 Tx1

10'-2"

12'-1 1/2"

U p

U p

U p

10'-0"

18'-4"

13'-0"

15'-0" 13'-0"

16'-5"

21'-0"

Division Chief

Break Area

Conference/Training Room

Commander

Superintendent Deputy

Admin

IT/SIPR

North side of wing

IT Section

Branch Chief

Branch Chief

Movement Support

Supplier Support

Dx1 Tx1

Dx2 Tx1

Dx2 Tx1

Dx2 Tx1

Dx1 Tx1

Dx1 Tx1

Dx1 Tx1Dx3 Tx3Dx6 Tx6Dx5 Tx5

Dx1 Tx1

Dx1 Tx1

Dx6 Tx6 Dx9 Tx9 Dx5 Tx5 Dx2 Tx1 Dx1 Tx1 Dx1 Tx1

Dx1 Tx1

Dx2 Tx1

Dx1 Tx1

Dx1 Tx1

Dx1 Tx1

Dx1

Tx1

Data Line

Telephone

10'-5"

13'-0"

Main Entrance Reception

JPPSO Colorado PPPO Peterson

Multi-use (Counseling) Offices

Shipment Mgt Branch Chief

Storage Mgt Section Chief

Work lead Work lead

Break Area

South side of wing

Branch Chief

14'-0"

Branch NCOICBranch NCOIC

Quality Control

Shipment Mgt Section Chief

Storage ManagementShipment Management

Enterprise Spt Branch Chief

Peterson PPPO Chief

Work lead

NCOIC

10'-2"

12'-1 1/2"

U p

U p

U p

10'-0"

18'-4"

13'-0"

15'-0" 13'-0"

16'-5"

21'-0"

Division Chief

Break Area

Conference/Training Room

Commander

Superintendent Deputy

Admin

IT/SIPR

North side of wing

IT Section

Branch Chief

Branch Chief

Movement Support

Supplier Support

Page-6�
Page-5�
South Wing�
North Wing�
Page-7�
Page-8�
SW Configured�
NW Configured�
S1�
N1�
N2�
Exhibit S1�
Exhibit S2�
Exhibit N1�
Exhibit N2�
Exhibit J1�
Exhibit J2�

File details come from the government source that posted it.