Attach_22_-_UFC_1-200-02_High_Performance_and_Sustainable_Building_Requirements_-_2016.pdf
Unified Facilities Criteria 2016 PDF 1 MB Posted
- Solicitation number
- FA251718R5000
About this file
Attach 22 - UFC 1-200-02 High Performance and Sustainable Building Requirements - 2016 DRAFT
View the file
Other versions and copies of UFC 1-200-02
| File | Revision | Posted | Attached to |
|---|---|---|---|
| Attachment 14 - MAHG211009 - Additional Specifications UFC 1-200-02.pdf | Revision not stated | FA301024R0008 Replace AHUs & VAVs in NPS Dorms Ph1 |
Who attaches UFC 1-200-02
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFC 1-200-02
01 DEC 2016
UNIFIED FACILITIES CRITERIA (UFC)
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
HIGH PERFORMANCE AND
SUSTAINABLE BUILDING
REQUIREMENTS
DRAFT
UNIFIED FACILITIES CRITERIA (UFC)
HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS
Any copyrighted material included in this UFC is identified at its point of use.
Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.
U.S. ARMY CORPS OF ENGINEERS
NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity)
AIR FORCE CIVIL ENGINEER CENTER
Record of Changes (changes are indicated by \1\ ... /1/)
Change No.
Date Location
This UFC supersedes UFC 1-200-02, dated 1 March 2013, with Changes 1-3.
FOREWORD
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DOD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. UFC will be used for all DOD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.)
Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.
UFCs are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DOD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request. The form is also accessible from the Internet sites listed below.
UFCs are effective upon issuance and are distributed only in electronic media from the following source
• Whole Building Design Guide web site: http://www.wbdg.org/.
Hard copies of UFC printed from electronic media should be checked against the current electronic version prior to use to ensure that they are current.
AUTHORIZED BY:
GEORGE O. LEA, P.E. JOSEPH E. GOTT, P.E.
Chief, Military Engineering Branch Chief Engineer U.S. Army Corps of Engineers Naval Facilities Engineering Command
EDWIN H. OSHIBA, SES, DAF MICHAEL McANDREW Deputy Director of Civil Engineers DCS/Logistics, Engineering & Force Protection
Deputy Assistant Secretary of Defense (Facilities Investment and Management) Office of the Assistant Secretary of Defense (Energy, Installations, and Environment)
DRAFT
http://www.wbdg.org/pdfs/ufc_implementation.pdf http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 http://www.wbdg.org/
UNIFIED FACILITIES CRITERIA (UFC)
REVISION SUMMARY SHEET
Document: UFC 1-200-02, High Performance and Sustainable Building Requirements
Superseding: UFC 1-200-02, dated 1 March 2013, with Changes 1-3.
Description: This document is a complete update to UFC 1-200-02, continues to maintain uniformity across the DOD Components, and:
• Drives transformation in the performance of the DOD facility inventory
• Requires greater energy and water efficiency measures that are supported by a life-cycle cost analysis
• Balances building performance with occupant comfort, health and wellness, safety and productivity
• Covers planning, designing and acquiring new building construction, existing buildings, and installations
• Guides compliance with higher level mandates, policies and standards
• Provides companion document to UFC 1-200-01 DOD Building Code (General Building Requirements)
• Clarifies requirements, thresholds for compliance, and means of compliance
• Is organized around the “Guiding Principles for Sustainable Federal Buildings and Associated Instructions”, February 2016, which is the revision to “Guiding Principles for Federal High Performance and Sustainable Buildings”, 2008.
• Includes requirements for consideration of resiliency for energy, water and climate change, related to mission execution.
Reasons for Document: This document provides minimum unified requirements, and guidance for planning, designing, constructing, renovating, and maintaining, high performance and sustainable buildings that will enhance DOD mission capability by reducing total ownership costs.
Impact: Improved mission capability through:
• Reduced total ownership costs of buildings
• Improved energy and water efficiency
• Enhanced building and installation performance and sustainability
• Promoting sustainable resource and environmental stewardship
• Enhanced energy and water security i
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION
1-1 BACKGROUND
1-2 PURPOSE AND SCOPE
1-3 ORGANIZATION
1-4 UFC APPLICABILITY
1-5 GENERAL REQUIREMENTS
1-6 HISTORIC REQUIREMENTS
1-7 LIFE-CYCLE COST ANALYSIS (LCCA)
1-7.1 LCCA Format
1-7.2 LCCA Calculation
1-7.3 LCCA Comparison
1-8 CYBERSECURITY
1-9 REFERENCES
1-10 GLOSSARY
CHAPTER 2 BUILDING DESIGN AND CONSTRUCTION
2-1 OVERVIEW
2-1.1 New Construction and Renovation
2-1.2 Work in Existing Buildings
2-2 EMPLOY INTEGRATED DESIGN PRINCIPLES
2-2.1 Integrated Design
2-2.2 Commissioning
2-3 OPTIMIZE ENERGY PERFORMANCE
2-3.1 Energy Efficiency
2-3.2 On-Site Renewable Energy
2-3.3 Energy Compliance Analysis (ECA)
2-3.4 Metering
2-4 PROTECT AND CONSERVE WATER
2-4.1 Indoor Water
2-4.2 Outdoor Water
2-4.3 Alternative Water
2-5 ENHANCE INDOOR ENVIRONMENTAL QUALITY
2-5.1 Ventilation and Thermal Comfort ii
2-5.2 Daylighting
2-5.3 Indoor Air Quality
2-5.4 Occupant Health and Wellness
2-6 REDUCE ENVIRONMENTAL IMPACT OF MATERIALS
2-6.1 Environmentally Preferable Products
2-6.2 Waste and Materials Management
2-7 ADDRESS CLIMATE CHANGE RISK
CHAPTER 3 ASSESSMENT OF EXISTING BUILDINGS FOR HIGH PERFORMANCE
AND SUSTAINABLE BUILDING (HPSB) COMPLIANCE
3-1 OVERVIEW
3-2 EMPLOY INTEGRATED ASSESSMENT, OPERATION, AND
MANAGEMENT PRINCIPLES
3-2.1 Integrated Assessment, Operation, and Management
3-2.2 Re-Commissioning and Retro-Commissioning
3-3 OPTIMIZE ENERGY PERFORMANCE
3-3.1 Energy Efficiency
3-3.2 On-Site Renewable Energy
3-3.3 Metering
3-3.4 Benchmarking (Verification)
3-4 PROTECT AND CONSERVE WATER
3-4.2 Outdoor Water
3-4.3 Alternative Water
3-4.4 Stormwater Management
3-5 ENHANCE INDOOR ENVIRONMENTAL QUALITY
3-5.1 Ventilation and Thermal Comfort
3-5.2 Daylighting and Lighting Controls
3-5.3 Indoor Air Quality
3-5.4 Occupant Health and Wellness
3-6 REDUCE ENVIRONMENTAL IMPACT OF MATERIALS
3-6.1 Environmentally Preferable Products
3-6.2 Waste and Materials Management
3-7 ADDRESS CLIMATE CHANGE RISK
CHAPTER 4 FEDERAL HPSB COMPLIANCE, REPORTING, AND SUSTAINABILITY
POLICIES
iii
4-1 OVERVIEW
4-2 COMPLIANCE WITH FEDERAL REQUIREMENTS
4-2.1 Compliance Checklists
4-2.2 Existing Buildings, HPSB Assessment
4-2.3 Compliance Strategies for Aligning Energy and Water Investments with Sustainability
4-2.4 Compliance Reporting
4-2.5 Compliance Tracking and Reporting
4-3 DEPARTMENT OF DEFENSE SUSTAINABILITY POLICY
REQUIREMENTS
4-3.1 Office of Secretary of Defense Guidance
4-3.2 Sustainable Third Party Certification
4-3.3 Sharing Whole-Building Energy and Water Usage Data Exemption for Third Party Rating Systems
4-3.4 Air Force Guidance
4-3.5 Army Guidance
4-3.6 Navy and Marine Corps Guidance
CHAPTER 5 SUSTAINABLE INSTALLATIONS
5-1 OVERVIEW
5-2 INSTALLATION-WIDE HPSB GUIDING PRINCIPLES COMPLIANCE. 31
5-3 DOD STRATEGIC SUSTAINABILITY PERFORMANCE PLAN (SSPP). 32
APPENDIX A REFERENCES
APPENDIX B BEST PRACTICES
B-1 PROMOTE SUSTAINABLE LOCATION AND SITE DEVELOPMENT. .. 39
B-1.1 Evaluation of the Site
B-1.2 Mitigation of Heat Island Effect
B-2 PROTECT INDOOR AIR QUALITY
B-3 DOMESTIC SOLAR HEATING
APPENDIX C GLOSSARY
APPENDIX D PROJECTS IMPACTING A HISTORIC BUILDING OR DISTRICT
D-1 APPLICABILITY TO SUSTAINABILITY GOALS
D-1.1 Applicability
D-1.2 Building Analysis
D-1.3 Coordination iv
D-1.4 Consultation
D-2 NEW CONSTRUCTION AND RENOVATION PROJECTS
D-3 REPAIR AND MAINTENANCE PROJECTS
D-4 LEASED HISTORIC BUILDINGS
D-5 NHPA SECTION 106 PROCESS
D-5.1 Initiate Process
D-5.2 Identify Historic Properties
D-5.3 Assess Adverse Effects
D-5.4 Resolve Adverse Effects
D-5.5 Implementation
D-5.6 Failure to Resolve Adverse Effects
D-5.7 Tribes, Native Hawaiians, and the Public
D-6 SPECIAL CONSIDERATIONS
D-6.1 Daylighting
D-6.2 Solar Panel Installation
D-6.3 Infill
D-6.4 Cistern Use
D-6.5 Replacement of Materials
D-6.6 Reclaimed/Salvaged Materials
D-7 LIFE-CYCLE COST ANALYSIS CONSIDERATIONS
D-8 HISTORICAL LANDSCAPES
TABLES
Table 1-1 Compliance Requirement/Thresholds
CHAPTER 1 INTRODUCTION
1-1 BACKGROUND.
The Energy Policy Act of 2005, Energy and Independence Security Act of 2007, and Executive Order (EO) 13693 mandate Federal agencies to lead by example, promoting sustainable Federal buildings through environmentally-sound, economically-sound, and fiscally-sound design, construction, and operating decisions. The Federal requirements collectively are referred to as the “Guiding Principles”, and are detailed in “Guiding Principles for Sustainable Federal Buildings and Associated Instructions”, February 2016, which replaces “Guiding Principles for Federal High Performance and Sustainable Buildings”, 2008. Consistent with UFC program requirements, this UFC integrates DOD requirements (DODI 4170.11 and other DOD Policies) with High Performance and Sustainable Building (HPSB) Guiding Principles and industry standards for high performance and sustainable buildings.
1-2 PURPOSE AND SCOPE.
This UFC provides minimum requirements and guidance to achieve high performance and sustainable buildings that comply with the Energy Policy Act of 2005, the Energy Independence and Security Act of 2007, EO 13693, and the implementation requirements found in “Guiding Principles for Sustainable Federal Buildings and Associated Instructions” (HPSB Guiding Principles). This UFC is organized around the HPSB Guiding Principles. Per DOD Sustainable Buildings Policy, when a building meets the requirements of this UFC, it is considered compliant with the HPSB Guiding Principles.
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings applies to all projects (except low-rise residential which must comply with IECC) in its entirety. ASHRAE 189.1 Standard for the Design of High-Performance Green Buildings is an industry standard created to consolidate and address sustainability and energy requirements. This UFC incorporates the sections of ASHRAE 189.1 mentioned herein when appropriate and determined to be life cycle cost effective. Where the provisions of ASHRAE 189.1 meet the intent of the HPSB Guiding Principles, the provisions of ASHRAE 189.1 are referenced as a means of compliance or provided as an alternative compliance pathway. When other standards are referenced in ASHRAE 189.1, use the publication date of the standard referenced in Appendix A of this document.
1-3 ORGANIZATION.
Chapter 2 provides requirements for building design and construction activities. Chapter 3 details Federal HPSB Guiding Principles Existing Building Assessment requirements that must be met in order for an existing building to be reported as a High Performance and Sustainable Building (HPSB). Chapter 4 provides HPSB tracking and reporting and third-party certification procedures. Chapter 5 highlights the more holistic vision of sustainability at the Installation level.
1-4 UFC APPLICABILITY.
This UFC applies to all planning, design and construction, renovation, repair, operations and maintenance, and affixed equipment installation in new and existing buildings, regardless of funding source, that result in DOD real property assets. Table 1-1 “Compliance/Requirements Thresholds” is applicable to all methods of project delivery and levels of construction (as defined in UFC 1-200-01, paragraph 1-4.)
Apply this UFC to the following construction activities to the greatest extent practical:
• Buildings outside of United States and U.S. territories.
• Buildings supporting contingency operations (Refer to UFCs 1-201-01, 1- 201-02, and 1-202-01).
• Non-permanent buildings.
• Projects with DD1391 marked “austere”.
This UFC does not apply to:
• Buildings to be demolished or deconstructed, except for demolition waste diversion.
• Buildings that have a status of Report of Excess (ROE) submitted, ROE accepted, or Determination to Dispose.
• Unoccupied buildings, which are occupied one hour or less per person per day on average; AND have total building energy consumption from all sources less than 10.9 BTU/ SF/ Yr.; AND have annual average water consumption less than 2 gallons per day for the building.
Comply with Table 1-1: DRAFT
1267723490C Highlight
Table 1-1 Compliance Requirement/Thresholds
Requirement Thresholds
Chapter 1 All design and construction activity1; and assessments of existing buildings larger than 5,000 SF.
Chapter 2 All design and construction activity1
Chapter 3 Assessments of existing building assets larger than 5,000 SF.
Chapter 4 Tracking and Reporting
Tracking Only
Third Party
Certification
1. Each new building larger than 5,000 SF
2. Each renovation2 in an existing building larger than 5,000 SF, with construction cost greater than $3M3 and 50% ERC4, and with comprehensive replacement2 (include additions that are part of the building renovation)
3. Assessments of existing building assets over 5,000 SF.
New buildings 5,000 SF and under; and additions.
1. Each new building larger than 5,000 SF, with construction cost greater than $3M3, unless Component policy is more stringent5.
2. Each renovation2 in an existing building larger than 5,000 SF, with construction cost greater than $3M3 and 50% ERC4, and with comprehensive replacement2 (include additions that are part of the building renovation).
Chapter 5 Installation planning, affecting all projects.
Appendices All projects as applicable.
1 New work over 5000 SF must comply with UFC requirements. New work under 5000 SF, additions, sustainment, modernization, and restoration building improvements must comply with UFC requirements relevant to the scope of the project/work. Structures that are part of any of these projects must comply with UFC requirements relevant to the scope of the project/work.
2Includes changes to a building that provide significant opportunities for comprehensive replacement, and improvement in: energy and water efficiency (such as HVAC, lighting, building envelope and other building components) indoor air quality, and other requirements in this UFC.
3 Aligns with thresholds of both USC Title 10 Section 2805(a) and USC Title 42 Section 6834(a) (adjusted from 2007 dollars) 4 Estimated Replacement Cost (ERC) is the cost listed in the project’s DD1391 “Economic Analysis”, and is exclusive of the cost to bring the existing building into compliance with all criteria.
5 Army threshold is based on designated Third Party Certifier’s minimum requirements.
1-5 GENERAL REQUIREMENTS.
Comply with UFC 1-200-01. UFC 1-200-01 provides applicability of model building codes and government-unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, HPSB, and safety. Use UFC 1-200-02, in addition to UFC 1-200-01, and the UFCs and government criteria referenced therein.
If any conflict occurs between this UFC and UFC 3-600-01, the requirements in UFC 3- 600-01 take precedence. In case of conflict between industry standards and military criteria, use the military requirements.
1-6 HISTORIC REQUIREMENTS.
See Appendix D for project requirements impacted by historic buildings, historic districts and those near historic facilities, view sheds and other designated cultural resources.
1-7 LIFE-CYCLE COST ANALYSIS (LCCA).
Life-cycle cost-effectiveness (LCCE) as defined in CFR Title 10 Part 436, applies to this entire document unless otherwise stated. In addition to energy, water and renewables, LCCE may be applied to other materials, and building construction types. The purpose of the LCCE is to deliver buildings that meet mission needs at the lowest total ownership cost.
1-7.1 LCCA Format.
Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST Handbook 135 “Life-Cycle Costing Manual for the Federal Energy Management Program”. The LCCA must be prepared using the Building Life-Cycle Costing (BLCC) program, available from the National Institute of Standards and Technology (http://energy.gov/eere/femp/building-life-cycle-cost-programs). The implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135 must be used. A link to BLCC can also be found at the Department of Energy’s building energy tools web site:
http://energy.gov/eere/femp/building-life-cycle-cost-programs When needed, refer to UFC 3-410-01 for requirements to obtain weather data.
1-7.2 LCCA Calculation.
Any building-level LCCA must be calculated using a maximum of a 40-year building life and equipment lives based on accepted industry averages. Individual components or systems life expectancies must be reflected by inclusion of appropriate replacement and salvage values in the appropriate year of the analysis.
1-7.3 LCCA Comparison.
LCCAs comparing individual component or system alternatives must use the estimated life of the mutually exclusive alternative having the longest life, not to exceed 40 years http://energy.gov/eere/femp/building-life-cycle-cost-programs from the beginning of beneficial use or the lowest common multiple of the expected lives of the alternatives. Include the appropriate replacement and salvage values for each of the other alternatives. A number of tools comparing energy system alternatives and evaluating specific efficiency measures may be of benefit in performing energy efficiency calculations. Additional information can be found at:
http://www.energy.gov/eere/femp/building-life-cycle-cost-programs.
Perform analysis based on the actual conditions expected over the life of the facility including anticipated occupancies, scheduled hours of operation and process loads.
Include realistic energy usage and efficiencies, maintenance cost and repairs renovations, all costs or savings associated with the utilization of recovered energy, solar heat, solar photovoltaic energy and other renewable or waste heat applications.
Credit any alternative funding such as rebates in the LCCA.
1-8 CYBERSECURITY.
All control systems (including systems separate from an energy management control system) must be planned, designed, acquired, executed, and maintained in accordance with UFC 4-010-06 Cyber Security of Facility-Related Control Systems and as required by individual Service Implementation Policy.
1-9 REFERENCES.
Appendix A contains a list of references used in this document.
1-10 GLOSSARY.
Appendix C contains acronyms, abbreviations, and terms.
http://www.energy.gov/eere/femp/building-life-cycle-cost-programs
This Page Intentionally Left Blank
CHAPTER 2 BUILDING DESIGN AND CONSTRUCTION
2-1 OVERVIEW.
The requirements of this chapter apply to all building design and construction. Refer to Table 1-1 for thresholds for compliance.
2-1.1 New Construction and Renovation.
New construction and renovation projects must comply with all requirements; or must clearly identify and provide justification when requirements are not applicable or fully achievable. Refer to 4-2 COMPLIANCE WITH FEDERAL REQUIREMENTS for additional guidance and requirement applicability.
2-1.2 Work in Existing Buildings.
In some of the paragraphs that follow, there are specific requirements provided for renovations. For existing building renovation, operations and maintenance; sustainment, restoration, and modernization, the goal is to improve the performance of the existing building inventory with every investment. Project teams must meet the requirements of this UFC relative to systems and components included in the project scope of work, by providing the most resource-efficient solutions for the requirements of this UFC.
2-2 EMPLOY INTEGRATED DESIGN PRINCIPLES.
Integrated design is the most important requirement in achieving a high performance building. A design team must have strong, consistent representation from all stake-holders throughout the project phases to maximize opportunities to improve building performance and to fully realize increased savings potential.
2-2.1 Integrated Design.
Incorporate the following planning and evaluation into the integrated design, as described in ASHRAE 189.1 Informative Appendix F (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section F1.1.1 (Charrette Process).
2-2.1.1 Integrated Planning.
Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.
2-2.1.2 Evaluation for Design Strategies.
Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed. Incorporate these features where applicable.
Take into account site attributes, including climate and local and regional context, which impact the design of the building.
2-2.1.3 Evaluation of the Site.
During the site selection process, meet the requirements of UFC 2-100-01. See Appendix B “Best Practices” for desirable site characteristics.
2-2.1.4 Site Integration and Design of the Building.
During the planning and design process meet the requirements of applicable UFCs, and use the following site development considerations and passive strategies:
• Site design elements that ensure safe and convenient pedestrian access.
• Meet the requirements of UFC 3-201-02.
• Incorporate results of site analysis, in order to design the building, focusing on orientation, configuration and massing.
• Orient building to maximize energy efficiency, passive solar and daylighting potential.
• Select, design and integrate into the overall building, high performance and sustainable systems (e.g., HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, building envelope and fire protection systems).
• Promote opportunities for occupants to voluntarily increase physical movement such as making stairwells a desirable option for circulation and active workstations.
2-2.2 Commissioning.
In order to verify design and performance, and ensure that the Government requirements are met, employ commissioning practices appropriate to the size and complexity of the building and its system components. This must include an experienced commissioning provider, who should be independent of the project design and construction team, and the operations team. The choice of either contracted services or Government personnel to serve as the commissioning provider will be determined at project level.
Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:
• For buildings and systems that are less complex6, commissioning may be tailored as determined by the DOD Component AHJ7.
6 For Army projects, refer to Army policy for determination of systems to commission.
7 For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.
• “Schematic design” is the design charrette or similar conceptual design activity.
• Documentation as described in ASHRAE 55 Section 6.2 is not required.
2-3 OPTIMIZE ENERGY PERFORMANCE.
Base energy efficiency design decisions on life-cycle cost as indicated in Chapter 1 of this UFC.
2-3.1 Energy Efficiency.
2-3.1.1 Commercial and Multi-Family High-Rise Residential Buildings.
• Meet the requirements of ASHRAE 90.18.
• Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 baseline.
• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
• Determine energy consumption levels for both the ASHRAE Baseline Building and proposed building by using the Performance Rating Method found in appendix G of ASHRAE 90.1, except the formula for calculating the Performance Rating. Replace the formula in G1.2 with the following:
Percentage improvement = 100 × ((Baseline building consumption − Receptacle and process loads) − (Proposed building consumption − Receptacle and process loads)) / (Baseline building consumption − Receptacle and process loads)9
2-3.1.2 Low-Rise Residential Buildings.
• Meet the requirements of International Energy Conservation Code (IECC).
• Design the building to achieve at least 30% energy consumption reduction from the IECC baseline using the Simulated Performance Alternative found in Section 405 of the IECC.
• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
8Use ASHRAE 90.1(2010) for all projects with design starts before November 6, 2016. Use ASHRAE 90.1(2013) thereafter.
9 Energy consumption for the purposes of calculating the 30 percent savings requirements in CFR Title 10 Part 433, §433.100 shall include the building envelope and energy consuming systems normally specified as part of the building design by ASHRAE 90.1 such as space heating, space cooling, ventilation, service water heating, and lighting, but shall not include receptacle and process loads not within the scope of ASHRAE 90.1 such as specialized medical or research equipment and equipment used in manufacturing processes.
2-3.1.3 Renovations.
• Renovation projects that replace everything above the foundation must either apply 2-3.1.1 or 2-3.1.2 as applicable.
• All other renovations choose one of the following options:
1. Reduce measured building energy use by at least 30%, below FY 2003 energy use baseline.
2. Reduce measured building energy use by at least 20% below FY 2015 energy use baseline.
3. Reduce modeled energy use (from all sources including renewable energy) by 20% compared to the ASRHAE 90.1 baseline building design.
• If none of the reduction choices is life-cycle cost-effective, modify the design of the proposed building system(s) to achieve an energy consumption level at the highest level of energy efficiency that is life-cycle cost-effective.
2-3.1.4 Energy Efficient Products.
Per EISA 2007 Section 525, acquire products that are ENERGY STAR®-qualified or meet FEMP-designated efficiency requirements in all covered product categories.
Select products based on life cycle cost, not initial cost. Link to EPA sites:
http://www.energystar.gov/ or http://www1.eere.energy.gov/femp/ .
2-3.1.5 Standby Powered Devices.
Per EISA 2007 Section 524, provide commercially available, off-the-shelf products that use no more than 1 watt in their standby mode.
2-3.2 On-Site Renewable Energy.
Provide on-site renewable energy systems in accordance with ASHRAE 189.1 Section
7.4.1.1 (On-Site Renewable Energy Systems) and UFC 3-440-01 where LCCE, considering climate, infrastructure condition, mission compatibility, and effects on base wide electrical system (grid) power quality. Exception: Do not use purchase of renewable energy certificates (RECs) as a substitute for the Section 7.4.1.1 new building requirement.
• For Army projects, if not LCCE, utilize ASHRAE 189.1 Section 7.3.2 (On- Site Renewable Energy Systems) for future installation of on-site renewable energy systems.
• Navy and Air Force will utilize an installation-level solution to renewable energy systems and will not require ASHRAE 189.1 Section 7.3.2 if a building-level solution is not LCCE.
DRAFT
http://www.energystar.gov/ http://www1.eere.energy.gov/femp/
• Components may choose centralized renewable energy development in lieu of building by building application. Meet the requirements of UFC 3- 540-08.
2-3.2.1 Solar Domestic Hot Water (SDHW).
Per EISA 2007 Section 523, meet at least 30% of the annual domestic hot water requirement through the installation of solar water heating unless SDHW is not LCCE.
If 30% is not LCCE, modify the design of the proposed system to achieve the highest level of solar water heating that is LCCE.
2-3.3 Energy Compliance Analysis (ECA).
The ECA must include all required LCCA studies and narratives. The ECA must be provided and updated with each design submittal.
2-3.3.1 ECA Requirements.
In the design analysis, include an ECA which demonstrates compliance with all energy related requirements in this UFC. Identify the specific energy efficiency criteria that apply to the project, the software used to prepare the necessary calculations, a summary of all input to and output from the calculations, and the calculated baseline and as-designed building energy consumption of the proposed design. The ECA must include a completed “Performance Rating Report” as shown in Appendix G of the ASHRAE 90.1 “User’s Manual.” Building-level energy consumption calculations must be performed using a computer program or programs that integrate architectural features such as windows for daylighting, air-conditioning, heating, lighting, and other energy producing or consuming systems. These programs must be capable of simulating the features, systems, and thermal loads used in the design. The energy savings and any parasitic energy loads associated with the utilization of recovered energy, solar heat, solar photovoltaic energy and other renewable or waste heat applications must be included. The program must be capable of performing 8,760 hourly calculations. The Department of Energy (DoE) maintains a list of building energy tools for design (such as eQuest).
2-3.3.2 Narrative Requirements.
LCCA narrative must be prepared by each of the following individuals: the Lead Project Architect, Lead Project Mechanical Engineer, and the Lead Project Electrical Engineer.
Each of the three narratives must list the conservation features considered for that discipline, a list of conservation measures adopted in the design, and any supporting LCCA calculations. Use the results of this analysis for design decision-making in reducing total Life Cycle Cost, while meeting mission objectives.
2-3.4 Metering.
A utility meter must be installed at each building, for each utility serving the building (e.g., district steam, district hot and chilled water, electricity, natural gas, fuel oil, etc.) in the standard units of the measure. Meters must be connected to a base wide energy and utility monitoring and control system using the installation’s advanced metering protocols. The installation of meters is required per DODI 4170.11, and as amended by DOD Utilities Meter Policy, 16 April 2013.
2-4 PROTECT AND CONSERVE WATER.
Base water efficiency design decisions on life-cycle cost as indicated in Chapter 1 of this UFC.
2-4.1 Indoor Water.
• Meet the requirements of ASHRAE 189.1 Section 6.3.2 (Building Water Use Reduction), which incorporates USEPA WaterSense-labeled products. Water closet replacements in renovations may have a flush value of up to 1.6 GPF (6.1 LPF) to accommodate existing plumbing capacity.
• Meet the requirements of ASHRAE 189.1 Section 6.4.2 (Building Water Use Reduction).
• Meet the requirements of ASHRAE 189.1 Section 6.4.3 (Special Water Features).
2-4.1.1 Indoor Water Metering.
Install advanced water meters to monitor building indoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
2-4.2 Outdoor Water.
2-4.2.1 Water for Landscaping.
• Limit potable irrigation water use by 50% compared to the conventional methods, and when LCCE, by using the methodologies in ASHRAE 189.1:
Section 6.3.1 (Mandatory Provisions: Site Water Use Reduction) and either Section 6.4.1 (Prescriptive Option: Site Water Use Reduction) or Section 6.5.1 (Performance Option: Site Water Use Reduction).
• For existing systems, if a building has a single water meter, reduce indoor and outdoor potable water use combined by at least 20% compared to building water use in 2007. Compare results to a baseline building, using the EPA WaterSense landscape water budget tool version 1.01 or later, or a Component approved tool.
• Show preference for irrigation contractors who are certified through a WaterSense labeled program, or other industry-recognized credentialing programs.
• Refer to UFC 3-201-02 for additional requirements.
2-4.2.2 Outdoor Water Metering.
When potable water is used, provide water meters for irrigation systems serving more than 25,000 square feet of landscape, when life-cycle cost-effective. Install advanced water meters to monitor outdoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
For all other irrigation systems, separate water meters for locations with outdoor water use are encouraged.
2-4.3 Alternative Water.
Where life-cycle is cost-effective and permitted by local laws and regulations, use alternative water sources, such as harvested rainwater (UFC 3-210-10), treated wastewater, air handler condensate capture, grey water, and reclaimed water.
2-4.3.1 Stormwater Management.
Meet the requirements of UFC 3-210-10.
2-5 ENHANCE INDOOR ENVIRONMENTAL QUALITY.
2-5.1 Ventilation and Thermal Comfort.
Meet the requirements of ASHRAE 55 and 62.1 (62.2 for low-rise residential.).
Compliance with standards by providing passive (non-mechanical) thermal comfort methods are allowed and encouraged as described in paragraph entitled, “Integrated Design” in this UFC.
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for ventilation and thermal comfort criteria.
2-5.2 Daylighting.
All regularly occupied spaces located on the exterior wall must have vision fenestration.
Where mission precludes vision fenestration for regularly occupied spaces located on the exterior wall, daylighting is still required. All classrooms and offices must have daylighting. Meet the requirements of ASHRAE 189.1 Section 8.4.1.2 (Minimum Sidelighting effective Aperture for Office Spaces and Classrooms) or Section 8.5.1.2 (Usable Daylight Illuminance in Office Spaces and Classrooms). Provide automated lighting controls in accordance with UFC 3-530-01.
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for additional daylighting criteria.
2-5.3 Indoor Air Quality.
2-5.3.1 Moisture Control.
Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contamination, and reduce health risks related to moisture. Meet the requirements of ASHRAE 189.1 Section
10.3.1.5 (Moisture Control), UFC 3-410-01, Chapter 3, Sections 3-2 and 3-3 (Ventilation Air), and UFC 3-101-01 Chapter 3 (Building Envelope Requirements). Refer to Appendix B “Protect Indoor Air Quality” for best practices.
2-5.3.2 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials).
Specify materials and products with low or no pollutant emissions, including composite wood products, adhesives, sealants, interior paints and finishes, carpet systems, and furnishings. Meet the requirements of ASHRAE 189.1 Section 8.4.2 (Prescriptive Option: Materials)
Exception: Exclude compliance with 8.4.2, first sentence.
2-5.3.3 Protect Indoor Air Quality during Construction.
For new construction and for renovation of unoccupied existing buildings, comply with ASHRAE 189.1 Section 10.3.1.4 (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60%.
For renovation of occupied existing buildings, comply with ANSI/SMACNA 008-2008, 2nd Edition, SMACNA IAQ Guidelines for Occupied Buildings Under Construction.
2-5.3.4 Environmental Tobacco Smoke Control.
Prohibit smoking10 within the building and within a minimum of 50 feet (15.24 meters) of all building entrances, operable windows, and building ventilation intakes. Verify if more stringent facility criteria or Installation policy applies.
2-5.4 Occupant Health and Wellness.
Promote opportunities for occupants to voluntarily increase physical movement such as making stairwells a desirable option for circulation, active workstations, fitness centers, and bicycle commuter facilities. Support occupant health by considering options such as providing convenient access to healthy dining options, potable water, daylight, plants, and exterior views. Indicate in the Integrated Design Process how these efforts were evaluated.
10 Refer to Service-specific policies: Army: http://www.army.mil/usapa/epubs/pdf/r600_63.pdf ; Navy:
https://doni.daps.dla.mil/Directives/05000%20General%20Management%20Security%20and%20Safety%20Service s/05-100%20Safety%20and%20Occupational%20Health%20Services/5100.13E.pdf Air Force: http://static.e-publishing.af.mil/production/1/af_sg/publication/afi40-102/afi40-102.pdf
DRAFT
http://www.army.mil/usapa/epubs/pdf/r600_63.pdf https://doni.daps.dla.mil/Directives/05000%20General%20Management%20Security%20and%20Safety%20Services/05-100%20Safety%20and%20Occupational%20Health%20Services/5100.13E.pdf https://doni.daps.dla.mil/Directives/05000%20General%20Management%20Security%20and%20Safety%20Services/05-100%20Safety%20and%20Occupational%20Health%20Services/5100.13E.pdf
2-6 REDUCE ENVIRONMENTAL IMPACT OF MATERIALS.
2-6.1 Environmentally Preferable Products.
The following requirements require procurement of construction materials and building supplies that have a lesser or reduced effect on human health and the environment over their lifecycle, when compared with competing products or services that serve the same purpose.
2-6.1.1 Recycled Content.
Use RCRA Section 6002 compliant products that meet or exceed EPA's recycled content recommendations, available on EPA’s Comprehensive Procurement Guideline web site at http://www.epa.gov/ .
2-6.1.2 Biologically-Based Products.
Per Section 9002 of the Farm Security and Rural Investment Act, specify products composed of the highest percentage of biobased content consistent with the USDA BioPreferred Program, if products meet performance requirements and are available at a reasonable cost. Exceptions taken to biobased product procurement must be documented. A preference for purchasing products with the highest biobased content per USDA recommendations for designated product categories must be included in all applicable solicitations. USDA’s biobased product designations and biobased content (which includes certified sustainably-harvested and rapidly renewable resources) recommendations are available on USDA’s BioPreferred web site at http://www.biopreferred.gov/.
2-6.1.3 Other Sustainable Products.
Purchase products that meet Federally Recommended Specifications; Standards and Ecolabels: https://www.epa.gov/greenerproducts/epas-recommendations-specifications-standards-and-ecolabels ; or are on the Federal Green Procurement Compilation:
sftool.gov/greenprocurement.
2-6.1.4 Ozone Depleting Substances.
Meet the requirements of ASHRAE 189.1 Section 9.3.3 (Refrigerants), if equipment or systems using ozone depleting substances are included in the project. Do not use ozone depleting substances (ODS) or high Global Warming Potential (GWP) chemicals where EPAs Significant New Alternative Policy (SNAP) has identified acceptable substitutes or where other environmentally preferable products are available for use in construction, repair or end-of-life replacements: www.epa.gov/snap.
Exceptions: Refer to UFC 3-600-01 for fire protection system requirements.
DRAFT
http://www.epa.gov/ http://www.biopreferred.gov/ https://www.epa.gov/greenerproducts/epas-recommendations-specifications-standards-and-ecolabels https://www.epa.gov/greenerproducts/epas-recommendations-specifications-standards-and-ecolabels
2-6.2 Waste and Materials Management.
2-6.2.1 Storage and Collection of Recyclables.
Meet the requirements of ASHRAE 189.1 Section 9.3.4.1 (Storage and Collection of Recyclables – Recyclables), where markets or onsite recycling exist.
2-6.2.2 Waste Diversion.
Divert minimum 60% of nonhazardous construction and demolition waste material from landfills.
2-7 ADDRESS CLIMATE CHANGE RISK.
Provide building design solutions responsive to any Government-provided projections of climate change projection and determination of acceptable risk.
For a building located in a floodplain of concern, provide design solutions which mitigate both impact on the floodplain, and impact of the design flood event on building function and occupants, consistent with mission criticality.
CHAPTER 3 ASSESSMENT OF EXISTING BUILDINGS FOR HIGH PERFORMANCE
AND SUSTAINABLE BUILDING (HPSB) COMPLIANCE
3-1 OVERVIEW.
Use this chapter to assess the HPSB Guiding Principles compliance status of an existing building, and to assist in identifying opportunities to increase performance of the building until it reaches full compliance. This assessment can also be used to inform future design and construction activities in the building. Refer to Table 1-1 for requirements for compliance. HPSB reporting procedures are covered in Chapter 4, paragraph entitled, “Compliance Reporting”.
Some HPSB Guiding Principles can be addressed at the Installation, Component, or DOD Agency level, versus the building level (e.g., no smoking policy). For guidance refer to Chapter 4 paragraph entitled “Compliance Strategies for Aligning Energy and Water Investments with Sustainability”.
3-2 EMPLOY INTEGRATED ASSESSMENT, OPERATION, AND
MANAGEMENT PRINCIPLES.
3-2.1 Integrated Assessment, Operation, and Management.
Through an integrated process and team, identify and implement operations and maintenance policies that improve building environmental performance, protect natural, historic, and cultural resources, support occupant health and wellness, and improve the climate resiliency of facilities and operations.
• Assess existing condition and operational procedures of the building and major building systems, consideration of electric vehicle charging infrastructure, and consideration of appropriate energy resiliency measures, in accordance with applicable laws and regulations, and identify areas for improvement.
• Establish operational performance goals for energy and water; product compliance goals for material use, recycling and indoor environmental quality; and ensure incorporation of these goals throughout the remaining life cycle of the building and establish verification process.
• Incorporate goals into building management to ensure that operating decisions and tenant education are carried out with regard to integrated building operations and maintenance.
• Engage building occupants with building environmental performance information. Augment building operations and maintenance as needed using occupant feedback on work space satisfaction.
3-2.2 Re-Commissioning and Retro-Commissioning.
In order to verify performance and ensure that the Government requirements are met, employ retro-commissioning and recommissioning, tailored to the size and complexity of the existing building and its system components. Recommissioning must be led by an experienced commissioning agent who should be independent of the facility operations team.
Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:
• For buildings and systems that are less complex11, commissioning may be tailored as determined by the DOD Component AHJ12.
• “Schematic design” is the design charrette or similar conceptual design activity.
• Documentation as described in ASHRAE 55 Section 6.2 is not required.
3-3 OPTIMIZE ENERGY PERFORMANCE.
3-3.1 Energy Efficiency.
3-3.1.1 Commercial and Multi-Family High-Rise Residential Buildings.
Meet the requirements of ASHRAE 90.1.
Use one of the following options to optimize and measure energy efficiency performance:
• Option 1: Reduce measured building energy use by at least 30% below the FY 2003 energy use baseline.
• Option 2: Reduce modeled building energy use (from all sources including renewable energy) by at least 20% below the FY 2015 energy use baseline.
• Option 3: Energy efficiency is 30% better than the current ASHRAE 90.1 standard.
If none of the reduction choices is LCCE, modify the design of the proposed system to achieve an energy consumption level at the highest level of energy efficiency that is
LCCE.
3-3.1.2 Low-Rise Residential Buildings.
Meet the requirements of IECC.
Design the building system to achieve at least 30% energy consumption reduction from the IECC baseline using the Simulated Performance Alternative found in Section 405 of the IECC.
11 For Army projects, refer to Army policy for determination of systems to commission.
12 For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.
If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
3-3.1.3 Energy Efficient Products.
Per EISA 2007 Section 525, acquire products that are ENERGY STAR®-qualified or meet FEMP-designated efficiency requirements in all covered product categories.
Select products based on life cycle cost, not initial cost. Link to EPA sites:
http://www.energystar.gov/ or http://www1.eere.energy.gov/femp/.
3-3.2 On-Site Renewable Energy.
Implement renewable energy generation projects on agency property for agency use, where lifecycle cost effective and when there are no adverse effects on base wide electrical system (grid) power quality or mission. Implementation must comply with the requirements in UFC 3-440-01.
Components may choose centralized renewable energy development in lieu of building by building application. Meet the requirements of UFC 3-540-08.
3-3.3 Metering.
Install a utility meter for each utility serving the building (e.g., district steam, district hot and chilled water, electricity, natural gas, fuel oil, etc.) in the normal units of the measure. Connect all meters to a base wide energy and utility monitoring and control system using the installation’s advanced metering protocols. The installation of meters is required per DODI 4170.11, and as amended by DOD Utilities Meter Policy, 16 April 2013.
3-3.4 Benchmarking (Verification).
Compare annual performance data with previous years’ performance data, by entering annual performance data in a measurement and tracking tool such as EPA’s ENERGY STAR®, Portfolio Manager.
3-4 PROTECT AND CONSERVE WATER.
3-4.1.1 Indoor Water.
Use one of the following options to reduce indoor potable water use reduction:
• Option 1: Reduce building potable water use to a level equal to or lower than a baseline that assumes 100% of the plumbing fixtures and fittings meet the Uniform Plumbing Code (UPC) 2006 or the International Plumbing Code (IPC) 2006 fixture and fitting performance requirements.
The baseline for plumbing fixtures and fittings installed before 1994 is allowed to be calculated at 140% of the UPC or IPC performance requirements, or
• Option 2: Reduce building measured potable water use by 20% compared to building water use in 2003 or a year thereafter with metered water data. If a building has a single water meter, reduce indoor and outdoor potable water use combined by at least 20% compared to building water use in 2003 or a year thereafter with metered water data.
3-4.1.2 Indoor Water Metering.
Install advanced water meters to monitor building indoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
3-4.2 Outdoor Water.
3-4.2.1 Water for landscaping.
• Limit potable irrigation water use by 50% compared to the conventional methods, and when LCCE, by using the methodologies in ASHRAE 189.1:
Section 6.3.1 (Mandatory Provisions: Site Water Use Reduction) and either Section 6.4.1 (Prescriptive Option: Site Water Use Reduction) or Section 6.5.1 (Performance Option: Site Water Use Reduction).
• For existing systems, if a building has a single water meter, reduce indoor and outdoor potable water use combined by at least 20% compared to building water use in 2007. Compare results to a baseline building, using the EPA WaterSense landscape water budget tool version 1.01 or later, or a Component approved tool.
• Show preference for irrigation contractors who are certified through a WaterSense labeled program, or other industry-recognized credentialing programs.
• Refer to UFC 3-201-02 for additional requirements.
3-4.2.2 Outdoor Water Metering.
Install advanced water meters to monitor outdoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.
When potable water is used, provide water meters for irrigation systems serving more than 25,000 square feet of landscape, when life-cycle cost-effective. For all other irrigation systems, separate water meters for locations with outdoor water use are encouraged.
3-4.3 Alternative Water.
Where life-cycle is cost-effective and permitted by local laws and regulations, use alternative water sources, such as harvested rainwater (UFC 3-210-10), treated wastewater, air handler condensate capture, grey water, and reclaimed water.
3-4.4 Stormwater Management.
Meet the requirements of UFC 3-210-10.
3-5 ENHANCE INDOOR ENVIRONMENTAL QUALITY.
3-5.1 Ventilation and Thermal Comfort.
At a minimum, meet ASHRAE 55 and ASHRAE 62.1 (62.2 for low-rise residential.)
Documentation as described in ASHRAE 55 Section 6.2 is not required.
Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for ventilation and thermal comfort criteria.
3-5.2 Daylighting and Lighting Controls.
Maximize opportunities for…
This is the start of the file's text. The full file is on GovTribe.