Floor plan of room which will have the system installed in.

View the file

Other files

File Type Posted
Responses_to_Questions.docx DOCX document
Attachment_1_-_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

PATRICK AIR FORCE BASE, FLORIDA

AIR FORCE TECHNICAL APPLICATIONS CENTER

AFTAC/XPC

AFTAC/SE

SCALE:

AFTAC/LSCAP

AFTAC/CE

AFTAC/LSCN

SCALE: 1/4" = 1'-0"

S.R.F. LAYOUT PLAN

NORTH

NOTES:

1.

2.

3.

NEW HVAC SYSTEM TO BE POSITIVE AIR PRESSURE WITH HEPA FILTERS.

NEW HVAC SYSTEM ALSO TO PROVIDE HUMIDITY CONTROL.

CEILING HEIGHT TO BE 10'-0" FROM FINISH FLOOR TO FINISH CEILING.

ELECT. UTILITY

ROOM

LAB BENCH

LIQUID

NITROGEN

GENERATOR

AND

DEWARS

FLOW

HOOD

100'-0" 0"

8' 6"

6' 4"

8'-6"8'-6" 83'-0"

1 16

2' 2"

2' 2"

41'-8" 58'-4"

ANTE ROOM

PROJECT NO: ##-####

SIMPLIFIED MODERN FLOOR PLAN

DATE:

06 JUN 2017 1/4" = 1'-0"

TABLE

TABLE

TABLE

FLOW

HOOD

FLOW

HOOD

FUME HOOD

MAGNEHELIC

GAUGE CLUSTER

(A) CLEANROOM PRESSURE

(B) ANTE ROOM PRESS.

(C) ELECTRICAL ROOM PRESS.

(D) A.H.U. PREFILTER PRESS.

(E) R.F. PREFILTER PRESS.

(F) EXHAUST FAN PRESS.

BAC

FUME HOOD

Model
Layout1