Attachment_2_-_Floor_Plan.pdf
PDF 53 KB Posted
- Attached to
- Clean Room Monitoring System
- Solicitation number
- FA2517-18-Q-5020
About this file
Floor plan of room which will have the system installed in.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses_to_Questions.docx | DOCX document | |
| Attachment_1_-_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
PATRICK AIR FORCE BASE, FLORIDA
AIR FORCE TECHNICAL APPLICATIONS CENTER
AFTAC/XPC
AFTAC/SE
SCALE:
AFTAC/LSCAP
AFTAC/CE
AFTAC/LSCN
SCALE: 1/4" = 1'-0"
S.R.F. LAYOUT PLAN
NORTH
NOTES:
1.
2.
3.
NEW HVAC SYSTEM TO BE POSITIVE AIR PRESSURE WITH HEPA FILTERS.
NEW HVAC SYSTEM ALSO TO PROVIDE HUMIDITY CONTROL.
CEILING HEIGHT TO BE 10'-0" FROM FINISH FLOOR TO FINISH CEILING.
ELECT. UTILITY
ROOM
LAB BENCH
LIQUID
NITROGEN
GENERATOR
AND
DEWARS
FLOW
HOOD
100'-0" 0"
8' 6"
6' 4"
8'-6"8'-6" 83'-0"
1 16
2' 2"
2' 2"
41'-8" 58'-4"
ANTE ROOM
PROJECT NO: ##-####
SIMPLIFIED MODERN FLOOR PLAN
DATE:
06 JUN 2017 1/4" = 1'-0"
TABLE
TABLE
TABLE
FLOW
HOOD
FLOW
HOOD
FUME HOOD
MAGNEHELIC
GAUGE CLUSTER
(A) CLEANROOM PRESSURE
(B) ANTE ROOM PRESS.
(C) ELECTRICAL ROOM PRESS.
(D) A.H.U. PREFILTER PRESS.
(E) R.F. PREFILTER PRESS.
(F) EXHAUST FAN PRESS.
BAC
FUME HOOD
| Model |
| Layout1 |
File details come from the government source that posted it.