Attach_2_Locker_Bench_Specification_and_drawings.pdf
PDF 896 KB Posted
- Attached to
- REMOVE/REPLACE LOCKERS AT BLDG 560 Federal contract opportunity
- Solicitation number
- FA2517-17-Q-5056
About this file
Attachment 1 Locker Bench Specifications and drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_1_SOW_Lockers_Fitness_Center_PAFB.pdf | ||
| Attach_3_Contractor_Submittal_Form.pdf | ||
| Combined_Synopsis_Lockers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
132 133
120A
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
68 1/2"
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
EXTERIOR
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO NORTH st C
IV
IL
E N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E
B A
SE
st S
P A C E W
IN
G
M ar k
Sheet of
BUILDING #560
1ST FLOOR
SHEET TITLE
X-000 1 1
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
PROJECT INFORMATION
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO st C
IV
IL
E N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E B A
SE
st S
P A C E W
IN
G
M ar k
Sheet of X-000
3 5
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
BUILDING #560
1ST FLOOR
SHEET TITLE
NORTH
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
EXTERIOR
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO
NORTH
st C
IV
IL
E N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E B A
SE
st S
P A C E W
IN
G
M ar k
Sheet of X-000
1 1
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
BUILDING #560
1ST FLOOR
SHEET TITLE
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
EXTERIOR
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO
NORTH
st C
IV
IL
E
N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E
C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E B A
SE
st S
P A C E
W
IN
G
M ar k
Sheet of X-000
1 1
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
BUILDING #560
1ST FLOOR
2) Updated room name and numbers per (WR#07-1744) Ben Beck, 21 SVS/SVMP, March 22, 2007, clp
3) Added room names, numbers and area for (No WR#) Building #570 which is shown on this drawing. May07, clp
4) Updated floor plan to include changes from (WR#09-1113) #07-2570 DO#3093 Basewide Utility Metering AsBuilts Feb09. (layer: e-comm). 9Feb09 ~clp
5) Updated floor plan to include (No WR#) Custodial layers. Apr09 ~clp
6) Updated floor plan to include Pre-Fire Plan Information and layout. Jun09 ~clp
1) Updated floor plan to include projects (WR#05-1048) #00-1010A Repair HAWC, #00-1010B Add Colorado Room & #02-2521 Fitness Center Mezzanine. 9Mar05, CECT, ~clp
REVISION DOCUMENTATION OF BUILDING #560, 1ST FLOOR:
7) Updated floor plan to include changes from (WR#10-2284) #10-2515 DO#3238 Sustain Hot Water AsBuilts Nov10. Layers: e-powr-anno-text, e-powr-eqpm, e-powr-jbox, e-powr-motr, m-cwtr-eqpm, m-hvac-eqpm, p-sanr-eqpm 10Nov10 ~clp
8) Updated floor plan to include changes from (WR#10-2319) #09-1039 DO#3003 Fitness Center Counter AsBuilts Dec10. Updated Custodial layers. Layers: a-clng-patt, a-flor-wdwk, a-flor-wdwk-details, a-wall-intr, e-lite-circ, e-lite-clng, e-powr-circ, e-powr-wall, qy-secr-camera, t-comm-circ, t-comm-data & t-comm-jbox. 10Dec10 ~clp9) Updated floor plan to include changes from (WR#10-2328) #09-1045 Addition to Fitness Center (Design drawings). Only Architectural layers updated. Updated Custodial layers. Layers: a-door-full, a-glaz-prht, a-flor-eqpm, a-flor-void, a-wall-intr, f-extg-cabt & s-colm. 17Dec10 ~clp
10) Updated floor plan to include changes to (WR#11-xxxx) Custodial contract legend per Elaine Barry. Layer: a-flr-legend. 21Jan10 ~clp
11) Updated floor plan to include changes from (WR#11-2434) #09-1045 DO#3210 Addition to Fitness Center AsBuilts Feb11. Layers: Many. 8Feb11 ~clp. Updated info in Documentation layout. 14Feb11 ~clp12) Updated floor plan to include changes from (WR#11-2456) updated Custodial areas and quantities (added main entrance area and offices) for Elaine Barry (Custodial Contract Manger). 17Feb11 ~clp13) Updated floor plan to include changes from (WR#11-2477) SSgt Welch, CEF for Pre-Fire Plan layers. 10Mar11 ~clp
14) Updated floor plan to include changes from (WR#11-2586) #10-2513 DO#3018 Replace Light Fixtures AsBuilts May11. Layers: e-lite-clng & e-lite-eqpm. 20May11, ~clp
15) Updated floor plan to include changes from (WR#11-2664) Custodial layers & layouts per Elaine Barry. Removed elevator room from contract & changed floor coverings in saunas & climbing wall room. 1August11, ~clp
16) Updated floor plan to include (WR#11-2746) Custodial layer & layout for contract dispute meeting with Mr. Clapp per Elaine Barry. Also corrected the square footage of the Colorado Room which previously included the window wells. 19October11, ~clp
17) Updated floor plan to include (WR#11-2747) #11-2541 DO#3029 Replace Various Floors AsBuilts Oct11. Layer: a-flor-notes. 19Oct11, ~clp
18) Updated floor plan to include changes from (WR#11-2335) Work Order #58530 Install water fountain behind Building #560. Layers: p-anno-text & p-sanr-fixt. 26Oct11, ~clp19) Updated floor plan to include changes from (WR#13-3348) Update a-flr-sections layer for Custodial plan per Elaine Barry. Updated Custodial layersl. 24Jan13, ~clp
S-HNGR IN ST DWGS. ADDED IN EVEN THOUGH THIS IS NOT A STANDARD. WHICH LAYER WOULD
THESE GO IN?
VERY LITTLE FUS DATA AVAILABLE AND THE DATA THAT WAS AVAILABLE THO ROOMS CHANGED THEREFORE IT WASN'T
ADDED.SHOULD THE ELEVATOR SHAFT BE ADDED IN RM 125 EVEN THOUGH THERE IS
CUSTODIAL?
WHAT ARE THESE OBJECTS WITHIN THE ST FRAMING DWGS. AND DO THEY NEED TO
BE DRAWN IN.
20) Updated floor plan to include changes from (WR#14-3751) Work Order #69987 Convert Racquetball Court #6 to accommodate a Functional Fitness (new requirement) room Oct13. Sketch provided by Ed Miller, 21 CES/CEOHS. Removed glass wall/door from former Racquetball Court #5 room #133 to create a cross-fit room. Layers:
a-door-full, a-flor-iden, a-flor-rprm, a-flr-carpet, a-flr-legend and a-wall-intr. Updated Custodial and Pre-Fire Plan layouts. Original update: 3Mar14, ~clp. Updated PFP layers. Added WO # and info to this description (Initially labeld a DSW project) = 18Jun14, ~clp21) Updated floor plan to include changes from (WR#14-3990) #11-1041 Repair HVAC Building #560 AsBuilts Dec14. Layers: m-hvac-eqpm-roof, m-hwtr-pipe & m-hwtr-pump. Updated layers to current standards. 23Dec14, ~clp
22) Updated floor plan to include changes from (WR#15-4370) #14-1153 Repair Fitness Center Flooring Building #560 AsBuilts Jan16. Layers: a-anno-dims, a-anno-text, a-door-full, a-eqpm-fixd, a-flor-otln, a-glaz-prht & a-full-wall-intr. Updated Custodial and Pre-Fire Plan layers and layouts. Corrected restroom partition walls in some rooms. Removed Custodial contract dispute information from Oct11. 6Jan16, ~cll
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
EXTERIOR
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO st C
IV
IL
E N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E
B A
SE
st S
P A C E W
IN
G
M ar k
BUILDING #560
1ST FLOOR
SHEET TITLE
X-000
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
108 107
Ladies Lockers RM
Mens Locker Rm.
132 133
104103102101
110C
108B
EXTERIOR
Building #560 1st Floor
Building #570
120A
(60) exist. lockers
176"
71"
71"
157 1/2"
127"
ADA
(49)Existing Lockers
Ladies Locker Rm.
ADA
93 1/2"
277"
228 1/2"
216 1/2"
134 1/2" 25"
156"
ADA
31'-712"
67"
67"
88 1/2"
200"
67"
67"
67"
81 1/2"
68 1/2"
68 1/2"
66 1/2"
67"
160" 13"
Mens Locker Rm.
59"
126"
114"
257 1/2" 43" Men DV Locker RmADA
127"
6'
5'
Remove existing wood shelf Unit Men's
Men's Small Locker room 13'-6"
Ladies DV Locker Rm.
Fitness Center Peterson AFB, CO st C
IV
IL
E N G
IN
EE
R S
Q U A D R O N
A
IR
F O R C E
SP
A C E C O M M A N D
In it ia ls
D es cr ip ti on
D at e
P
ET
ER
SO
N A
IR
F O R C E B A
SE
st S
P A C E W
IN
G
M ar k
Sheet of X-000
1 1
DATE:
PROJECT INFORMATION
PROJECT NO: TDKA XX-XXXX
## XXX 0#
R
EV
IS
IO
N S
BUILDING #560
1ST FLOOR
EXTERIOR
Building #560 1st Floor
Building #570
Fitness Center Peterson AFB, CO
Sprinkler Coverage Type of Fire Detection
Occupancy:
Alarm Panel Gas Shutoff Electrical Panel Fire Hydrant Flammable Locker
Knox Box F D C P I V
GFAP E FL K
S
NORTH
O:\4_Pre-Fire_plans\fire patch.png H
560: FULLY
SPRINKLERED
570: NOT
SPRINKLERED
BUILDING
560/570ASSEMBLY
OCCUPANCY
FLOOR 1 OF
SPECIFICATION
LOCKERS/BENCHES FITNESS CENTER
PETERSON AFB, CO
Lockers shall be solid Phenolic lockers commercial grade/heavy duty type. Lockers shall be fire-rated.
Locker finish shall be resistance to water, chemicals, scratches, stains, and graffiti. Lockers shall come in ADA compliant type. Sources: Titan Lockers, Jorgenson Lockers.
Style: “Z” Type 2- Tier, sizes 18”w x 12”dx 60”h and 18” w x 15” d x 72”h. See scope of work for specification locations.
Doors: Constructed from ½” thick solid phenolic.
Sides, tops, bottoms, dividers and shelves: Locker body is constructed from 3/8” thick solid phenolic.
Tops and bottoms and intermediate shelves for multi- tier lockers shall be ½” thick phenolic. Lockers shall be fixed together with theft resist and stainless steel fasteners, pre-drilled holes. No aluminum or metal profiles or reinforcements shall be permitted.
Hinge: Hinges shall be constructed of grade 304 stainless steel heavy duty – three for full height doors and two for multi-tiered units. Hinges shall be held in place with theft resistant stainless steel machine screws threaded into the prepared door that is drilled, tapped and reinforced with stainless steel heli-coil inserts. Stainless steel limit arm holds door open at 90 degrees.
Handle: Handle is ADS compliant ½” thick solid brushed finish stainless steel.
Coat Hook: (2) Single coat hooks, wall mounted, gray nylon construction and (1) triple coat hook, top or shelf mounted.
Base: Bases constructed from ½” thick solid phenolic. Stand base height is 4” for floor supported lockers.
Flat Top: Flat tops shall be constructed from ½” thick phenolic color matched to lockers.
End/fill Panels: End Panel shall be constructed from ½” thick solid phenolic color matched to lockers.
Number Plate: Each locker shall have a number plate.
Padlock Compatible: Lockers shall have standard padlock compatible.
Colors/Finishes: Lockers shall be available in full range of colors available from Wilsonart/Formica, Nevamar, including wood grain finishes.
Vents: Lockers shall be back vented for built-in ventilation system. See scope of work for venting requirements.
| 0560-1 |
| Model |
| A-SIZE |
| B-SIZE |
| C-SIZE |
| D-SIZE |
| DOCUMENTATION |
| Custodial-A |
| Custodial-C |
| Pre-Fire Plan |
Locker Bench Specification Peterson AFB
File details come from the government source that posted it. Updated .