Attachment_1_PWS_for_PAFB_Water_Treatment.pdf

PDF 125 KB Posted

Attached to
PAFP Water Treatment Federal contract opportunity
Solicitation number
FA2517-17-Q-5023
Issued by
Department of the Air Force Space Command

About this file

Attachment 1 - PWS for PAFB Water Treatment

View the file

Other files for this federal contract opportunity

Other files attached to PAFP Water Treatment, newest first.
File Type Posted
Responses_to_RFQ_Questions.pdf PDF
Amendment_1_RFQ_PAFP__Water_Treatment.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_2_-_Contractor_Submittal_Form.pdf PDF
RFQ_PAFP_Chemical_Water_Treatment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS ATTACHMENT 1

PERFORMANCE-BASED WORK STATEMENT (PWS)

FOR

WATER CHEMICAL TREATMENT FOR CLOSED & OPEN LOOP SYSTEMS

AT

PETERSON AIR FORCE BASE, CO

10 MAY 17

SECTION I

1. DESCRIPTION OF SERVICES: The contractor shall provide all labor, equipment, tools, material, supervision, and all other necessary items to provide water chemical treatment on designated Heating, Ventilation, & Air Conditioning (HVAC) cooling and heating closed loop and open loop systems on Peterson Air Force Base (AFB), Colorado. The Government will provide the necessary chemicals for water treatment and glycol.

1.1 MAINTENANCE SERVICES: The contractor shall provide water chemical treatment and maintenance on designated HVAC cooling and heating closed and open loop systems on PAFB. The goal of this treatment is to protect Peterson Air Force Base’s chilled water loops and heated loops from a shortened life span due to excess corrosion and to prevent scale (build up) deposition in the systems. This will aid in efficient operation to maximize energy and water cost. Systems to be treated are listed in Appendix A.

1.2 Twice per year each closed loop chilled water and heating water system will be inspected, tested and treated.

1.2.1 The contractor shall inspect the system for leaks and note deficiencies. The contractor shall flush sample point for approximately 10 seconds and then take a sample of system. The contractor shall check the glycol level, pH, alkalinity, calcium hardness, product level and general bacteriological level.

Based upon water quality testing levels, the water shall be bled off and chemical added to bring desired changes to water quality. If necessary, the contractor shall conduct and record follow up testing to get system within parameters. All measurements and adjustments shall be documented on a worksheet and submitted electronically to 21 CES HVAC shop and Contracting Officer within five working days.

1.2.2 Contractor shall clean and passivate the closed loop systems listed herein once for each of the below systems during the contract period. Contractor shall use government provided alkaline cleaner (formula 248-L) and inhibitor (formula 1012-L) for use with cleaning process.

Bldg 1013 heating water system Bldg 1143 heating water system Bldg 121 heating water system Bldg 910 heating water system

1.2.3 Most systems presently have by-pass feeders installed to facilitate the addition of chemicals. Where by-pass feeders are not installed, the contractor shall use their portable feeder or chemical pump to transfer the chemicals into the system. The contractor shall notify HVAC personnel if there is any need of a shutdown, of heating or cooling equipment, for the purpose of treatment with chemicals.

1.2.4 During testing if a system leakage is discovered, the contractor shall immediately contact the HVAC shop at 719-556-1822 so the shop can make the necessary repairs.

1.3 There are five (5) open loop condenser water systems on base including one (1) in Buildings 1, 1470 and 1844 and two (2) in Building 2025. These condenser water systems shall be shall be inspected, tested and their treatment shall be adjusted monthly.

1.3.1 The contractor shall inspect the system for leaks and note deficiencies. The contractor shall flush sample point for approximately 10 seconds and then take a sample of the system. The contractor shall check glycol level, pH, alkalinity, calcium hardness, oxidation reduction potential (ORP), chloride, product level and general bacteriological level. Based upon water quality testing levels, the chemical feed system shall be adjusted to bring desired changes to water quality. All measurements and changes will be documented on a worksheet and submitted electronically to 21 CES HVAC shop and Contracting Officer within five working days.

1.3.2 Most systems presently have by-pass feeders installed to facilitate the addition of chemicals. Where by-pass feeders are not installed, the contractor shall use their portable feeder or chemical pump to transfer the chemicals into the system. The contractor shall notify HVAC personnel if there is any need of a shutdown of the systems for the purpose of treatment with chemicals.

1.3.3 During testing if a system leakage is discovered, the contractor shall immediately contact the HVAC shop at 719-556-1822 so they can make the necessary repairs to prevent a continuous stream of hardness minerals and dirt from entering the system.

1.3.4 Bldg 1470 Cooling Tower - To eliminate micro-biological growth, contractor shall provide a one-time treatment for the period to the condensing water in tower with approximately 5 gallons of dispersion chemical. Contractor shall use their own dispersion chemical that complies with system specifications.

1.4 The contractor will comply with the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration standards (OSHA).

1.5 The contractor shall supply all necessary equipment, tools, material, supervision to perform job. The contractor shall also maintain all appropriate MSDS’s (Material Safety Data Sheets) with any chemicals that are being used.

1.6 The contract shall submit a schedule of the work that needs to be completed at the beginning of each quarter. Electronic copies shall be sent to 21 CES HVAC shop and the Contracting Officer.

1.7 The contractor shall submit quarterly an electronic summary worksheet documenting testing and other work accomplished for each facility system. The worksheet shall at a minimum include facility, system, analysis info and any recommendations. The worksheet shall be submitted electronically to the Contracting Officer and the 21 CES HVAC Shop within ten working days after completion of the quarter.

1.8 The contractor shall provide a four (4) hour knowledge based training sessions on water treatment in accordance with industry and federal standards to the 21st Civil Engineering Squadron HVAC Shop twice (2) per year. Training at a minimum shall include water treatment basics to include, corrosion control, chemical inhibitors, biocides and cleaners and any other training necessary for basic understanding of water treatment. Training will be conducted in the HVAC Shop to approximately 15 personnel. The contractor shall submit training date requests a minimum of one week in advance of the projected training.

1.9 The work area must be kept free and clear of all debris. Access to the facility or surrounding driving right-of-ways will not be closed off or substantially obstructed for long periods of time.

1.10 The contractor shall dispose of any debris off the installation and in accordance with all local, state and federal requirements as required by Paragraph 6.

1.11 The contractor shall be responsible for all damage to government property or personal property resulting from actions by contractor employees or equipment during the performance of this contract or while contractor employees are on Peterson AFB.

1.12 The contractor shall warranty all work for a period of 1 year from the date of acceptance by the government.

1.13 The Contractor shall provide these services for no less than 1 year.

1.14 Coordinate with the base fire department for hot work permits (for welding or open flame operations), as required. Welding or torching of any kind on Peterson AFB requires a hot work permit. Obtain a hot work permit from the Base Fire Department, Building 218,

(719) 556-6574 or (719) 556-7774. A permit shall be issued within three (3) working days with instructions for fire prevention.

2. HAZARDOUS CONDITIONS. During the course of performing work under this contract, should the contractor find conditions existing that prevent the performance of any specified tasks the Contracting Officer shall be notified immediately. A confined-space permit must be obtained through the proper authorities before entering any confined space.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties.

There are no covered or secure storage areas available. The contractor will provide all equipment and storage media necessary to perform tasks.

3.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted. Contractor personnel will ensure facility cleanliness is maintained at all times.

3.2 Security Police and Fire Protection. The government will provide general on-base security police and fire protection service.

3.3. Telephone. The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.

4. HOURS OF OPERATION. Working hours for the contractor will normally be between the hours of 7:30 AM and 4:30 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours/days.

The contractor is not required to provide service on the following days:

New Year’s Day (January) Labor Day (September) Martin Luther King Day (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Independence Day (July) Christmas Day (December)

5. SAFETY AND HEALTH.

5.1. OSHA Requirements. All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.

5.2. State Requirements. All companies who conduct business within the state of

Colorado must, in accordance with Colorado Workman Compensation laws, have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the state, shall be submitted For Information Only (FIO) within 10 (ten) days of contract award. The plan must also include the requirements of US Army Corp of Engineers (COE) Safety Manual EM 385-1-1.

6. DISPOSITION OF WASTE, EXCESS, SCRAP, AND SALVAGE MATERIALS. The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor, unless specifically excepted below. Further (unless listed below in exceptions), these materials shall be removed from PAFB and disposed of by the Contractor in accordance with all applicable Federal, State, and Local Regulations. The following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-into the Government at a location at Peterson AFB designated by the Contracting Officer:

Exceptions: None.

7. RADIATION PERMITS AND AUTHORIZATIONS. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from Peterson AFB. Without the proper authorization, contractors will not be allowed to bring these devices on base. Also, the contractor shall provide Bioenvironmental Engineering a copy of their radioactive materials permit and training certificates, if radioactive material will be brought onto Peterson AFB.

8. SECURITY REQUIREMENTS.

8.1. Requirements. Comply with all Peterson AFB security requirements imposed by the local installation commander at all times while on the premises to include not using cell phones while operating a vehicle on Base. Obtain necessary badges(s) required for access to Peterson AFB.

8.2. Badge Request. Send a letter to the Contracting Office on company stationery, which will include address, telephone number, and contract number, listing full names of employee(s), with their social security number, date of birth and place of birth, who require access to Peterson AFB. After approval by Security Forces, this letter will be on file for 30 days and then discarded. Thereafter, anytime a badge is requested for a new employee, an updated employee list will accompany a request letter by the Contractor to the contracting office.

8.3 Vehicle Requirement. Proper state vehicle registration, proof of insurance and a valid driver’s license are required to drive on base. After obtaining the proper badges/vehicle identification at the Visitor Control Center (Bldg. 1334), all commercial vehicles must enter through the East Gate (Marksheffel Road), the primary search area for all commercial delivery vehicles.

SECTION II

9. SERVICE SUMMARY (SS): The contract service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. An SS item shall be “Unacceptable” when the contractor exceeds the allowable number of defects during the period as identified in the Performance Threshold column (i.e., quarterly or annually). A defect is a service that does not meet the requirements of the PWS.

Even though the contractor is responsible for all of the requirements as listed in this PWS, the below listed services have been identified as critical to mission success.

Item # Performance Objective PWS

Para Acceptable Performance Threshold

Testing and adjustment of closed loop heating and chilled water hydronic systems including electronic documentation

1.2.1

3 defects per year

Testing and adjustment of open loop condenser waters systems including electronic documentation, controller inspection and chemical feed pump supply

1.3.1 3 defects per quarter

3 Quarterly Report 1.7 1 defect per year

10.0 WORKLOAD ESTIMATE

10.1 Routine Services Closed Loop: The Government shall require inspection, sampling, analysis and reporting of all heating and chilled water systems once per each six month period as per description included in the PWS.

10.2 Routine Services Open Loop: The Government shall require inspection, sampling, analysis and reporting of five condensing water systems monthly per description in PWS.

System Location No. of Systems

Monitoring Frequency Reporting Frequency

Heating Water Systems

Peterson AFB 82 Refer to section

1.2. Refer to section 1.2

Chilled Water Systems

Peterson AFB 39 Refer to section

1.2. Refer to section 1.2

Open Loop Condenser Water Systems

Peterson AFB 5 Refer to section

1.3. Refer to section 1.3

Clean & Passivate Closed Loop System

Peterson AFB 4 Refer to section

1.2.2 Refer to section 1.2

Bldg 1470 Cooling Tower

Peterson AFB 1 Refer to section

1.3.4 Refer to section 1.3

Water Treatment Training

Peterson

AFB 2

N/A

N/A

APPENDIX A

Fac # TYPE HW CHW Clg Twr Glycol Color HW Feeder CW Feeder

1 Admin Yes Yes - 2 Yes PINK GLYCOL Yes Yes 3 Admin Yes Yes No PINK GLYCOL Yes Yes

119 302 Yes No No PINK GLYCOL Feed Not connected N/A 121 Hangar Yes No No PINK GLYCOL No N/A 123 Hangar Yes Yes No PINK GLYCOL Yes Yes 130 302 Yes No No PINK GLYCOL No N/A 133 Hangar Yes No No PINK GLYCOL No N/A 140 302 Yes No No PINK GLYCOL No N/A 150 302 Yes No No PINK GLYCOL No N/A 203 302 Yes Yes No PINK GLYCOL Yes Yes 208 302 Yes No No PINK GLYCOL Yes N/A 210 302 Yes Yes No PINK GLYCOL No No 214 302 Yes - 2 No No PINK GLYCOL Yes N/A 216 302 Yes No No PINK GLYCOL No N/A 218 Fire/SFS Yes Yes No PINK GLYCOL Yes Yes 350 Admin Yes - 2 No No BLUE and Pink Glycol Yes N/A 361 Admin Yes Yes No PINK GLYCOL Yes Yes 365 Admin Yes No No PINK GLYCOL Yes N/A 391 Admin Yes Yes No PINK GLYCOL Yes Yes 404 Community Yes No No PINK GLYCOL No N/A 406 Community Yes No No PINK GLYCOL No N/A 418 Community Yes Yes No PINK GLYCOL No Yes 425 Medical Yes No No PINK GLYCOL No N/A 502 302 Yes No No PINK GLYCOL Yes N/A 560 Community Yes Yes No PINK GLYCOL No Yes 570 Community Yes No No PINK GLYCOL No N/A 590 Dorm/Lodging Yes Yes No PINK GLYCOL No Yes 605 Admin Yes Yes No PINK GLYCOL No Yes 615 Community Yes No No Unoccupied - Don't Include No N/A 625 302 Yes No No PINK GLYCOL No N/A 640 Community Yes No No PINK GLYCOL No N/A 650 Warehouse/Garage Yes No No PINK GLYCOL No N/A 670 Warehouse/Garage Yes No No PINK GLYCOL No N/A 672 Warehouse/Garage Yes No No PINK GLYCOL No N/A 678 302 Yes No No PINK GLYCOL Yes N/A 845 Admin Yes Yes No PINK GLYCOL Yes No 863 Admin Yes Yes No PINK GLYCOL No No 888 302 Yes Yes No PINK GLYCOL Yes No

APPENDIX A890 302 Yes Yes No PINK GLYCOL No No 890 302 Yes Yes No PINK GLYCOL No No 893 302 Yes No No PINK GLYCOL Yes N/A 895 302 Yes Yes No PINK GLYCOL Yes Yes 910 Community Yes No No PINK GLYCOL No N/A 920 Admin Yes - 2 Yes No PINK GLYCOL Yes Yes 981 Museum Yes No No PINK GLYCOL No N/A 982 Museum Yes No No PINK GLYCOL No N/A 1013 Food Service Yes Yes No PINK GLYCOL Yes Yes 1030 Dorm/Lodging Yes Yes No PINK GLYCOL No No 1038 Admin Yes Yes No PINK GLYCOL Yes Yes 1040 Admin Yes No No PINK GLYCOL Yes N/A 1141 Community Yes No No PINK GLYCOL No N/A 1143 Dorm/Lodging Yes Yes No PINK GLYCOL No No 1158 Dorm/Lodging Yes Yes No Under Contract - Don't Include No No 1160 Food Service Yes No No PINK GLYCOL No N/A 1164 Dorm/Lodging Yes Yes No BLUE GLYCOL Yes Yes 1171 Community Yes No No PINK GLYCOL No N/A 1229 Admin Yes No No PINK GLYCOL No N/A 1255 Warehouse/Garage Yes No No PINK GLYCOL No N/A 1256 Band Yes No No PINK GLYCOL No N/A 1270 Dorm/Lodging Yes Yes No PINK GLYCOL No No 1285 302 Yes No No PINK GLYCOL No N/A 1324 Admin Yes No No PINK GLYCOL No N/A 1328 Warehouse/Garage Yes No No PINK GLYCOL No N/A 1350 Child care Yes No No PINK GLYCOL Yes N/A 1361 Washrack Yes No No PINK GLYCOL No N/A 1376 Fire/SFS Yes Yes No PINK GLYCOL Yes Yes 1410 Community Yes Yes No PINK GLYCOL No No 1440 Community Yes No No PINK GLYCOL No N/A 1465 Community Yes No No PINK GLYCOL (Fed from 1465) No N/A 1466 Community Yes No No PINK GLYCOL (Feeds 1465) Yes N/A 1470 Admin Yes Yes Yes PINK GLYCOL No No 1471 Admin Yes Yes No HW-PINK from B1470, CW -BLUE No No 1525 Community Yes No No PINK GLYCOL No N/A 1555 Child care Yes Yes No PINK GLYCOL Yes Yes 1840 Admin Yes Yes No PINK GLYCOL No Yes 1844 Admin Yes Yes - 2 Yes PINK GLYCOL Yes Yes 1876 Admin Yes Yes No PINK GLYCOL Yes Yes 2004 Child care Yes Yes No PINK GLYCOL Yes Yes

APPENDIX A2025 Admin Yes Yes Yes - 2 PINK GLYCOL Yes Yes 2027 Admin Yes Yes No PINK GLYCOL Yes Yes 2028 Admin Yes Yes No PINK GLYCOL Yes Yes

# of HW Systems 82 # of CHW Systems 39

# of Cond Water Sys 5