N2ITSM_Sources_Sought_Attachment.docx

DOCX document 25 KB Posted

Attached to
NORAD and USNORTHCOM Information Technology Service Management (N2ITSM)
Solicitation number
FA2517-15-R-7001
Issued by

View the file

Other files

File Type Posted
N2ITSM_Industry_Site_Visit_Consolidated_Questions_20_May_16.xlsx XLSX spreadsheet
N-NC_EIS_Sources_Sought_Attachment.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH AMERICAN AEROSPACE DEFENSE COMMAND (NORAD) AND US NORTHERN COMMAND (USNORTHCOM) INFORMATION TECHNOLOGY

SERVICE MANAGEMENT (N2ITSM)

DRAFT TECHNICAL SPECIFICATIONS

The current number of active users ranges between 6,500 and 6,800 depending on status of Battle Staff operations. Users are designated priority levels to ensure service requests and incidents are responded to and resolved in a prioritized manner. Definitions and response requirements for all four categories for NORAD and USNORTHCOM Information Technology Service Management (N2ITSM) Prioritization Levels noted below NORAD and USNORTHCOM has experienced an average 2-3% growth per year over the past three years in IT service assets and anticipates the same growth line over the life of this contract, the Contractor shall consider this growth as part of the contract life.

ITSM Prioritization Levels:

Priority 1A Users. Approximately 250-300, Users that support the Battlestaff and Operational Centers.

Priority 1 Users. Approximately 100-125. General/Flag Offices and/or Directorate Chiefs.

Priority 2 Users. Approximately 200-250. Direct supporting staff for Priority 1 Users.

Priority 3 Users. All other users in the commands.

Services: The Contractor is responsible for the service in the N-NC Service Catalog and those services that depend on these services for infrastructure, transport, and access.

Data Centers: N-NC operates a primary data center within Building 2 with the ability to fail over core services to a data center within the Cheyenne Mountain Air Force Station facility. The Contractor is responsible for access, asset accountability, and operations of the primary data center. The Contractor is responsible for asset accountability, and operations of the N-NC assets in the alternate data center (N-NC is a tenant in the alternate data center, not the primary owner).

Average number of tickets received for this environment (for incident, request and project support) is 3,500 per month (for all geographic locations and all networks).

The NORAD and USNORTHCOM ITSM environment currently consists of support for the Nonsecure Internet Protocol Router Network (NIPRNet), Secret Internet Protocol Router Network (SIPRNet), SIPRNet Releasable (SIPR-REL), and the classified US and Canadian NORAD Enterprise Network (NEN), CENTRIXS, and commercially provisioned unclassified networks. Support occurs mainly at Peterson AFB in Colorado Springs, CO, but is also required at various locations in the NORAD Area of Operations (AOO) and NORTHCOM Area of Responsibility (AOR).

NORAD operates through three subordinate regional headquarters:

a. Alaskan NORAD region

b. Canadian NORAD region

c. Continental NORAD region

USNORTHCOM Subordinate Commands and Service Components include:

a. Joint Forces Headquarters National Capital Region

b. Joint Task Force Alaska

c. Joint Task Force Civil Support

d. Joint Task Force North

e. Army North

f. Air Force North

g. Navy Fleet Forces Command

h. Offices of Defense Coordination, Mexico and Bahamas

Support and maintain N2ITSM Application Services on NIPRNet, SIPRNet and NEN including: SharePoint 2010 and SharePoint 2013, Office 2010, Task Management Tool (TMT), and Windows 2010 and 2012 (PC and Server). Support and Maintain network configuration management and monitoring tools such as, but not limited to, Symantec Security Info Manager (SSIM), What’s Up Gold (WUG) and Host Based Security System (HBSS). All systems operate from a local data center that hosts both the production and a test environment.

Contractor will provide training to users on all enclaves for services delivered. Contractor will decommission SharePoint enclave service delivery at the direction of N-NC (dependent upon successful transition to Joint Information Enterprise services)

Security: The contractor shall possess and maintain a SECRET facility clearance from the Defense Security Service. The contractor’s employees, performing work in support of this contract shall have been granted at a minimum SECRET security clearance from the Defense Industrial Security Clearance Office. Certain employees would require a Top Secret Clearance.

The Major subtasks of this requirement are:

CORE REQUIREMENTS
REQUIREMENT DETAILS
USNORTHCOM HQ & Subordinates
CONUS, OCONUS (Onsite Support Required in Washington Field Office (Pentagon), ODC Mexico, Bahamas (US Embassy))
NORAD HQ & Regions/Sectors
CONUS, CONUS (Canada)
Lifecycle IT Service Management Scope
Utilize Information Technology Infrastructure Library (ITIL) best practice framework for PWS tasks

PERFORMANCE

Metrics (Process (KPIs) and Services (KPPs))
125 Key Performance Indicators to Measure N2ITSM Tasks (May be reduced due to task realignment); KPPs for Availability, Capacity, Continuity
Deliverables (Output Specifications)
80 Specified Deliverables to meet N2ITSM Tasks (May be reduced due to task realignment)

SERVICE OPERATIONS

Network Operations Center/IT Ops
Operate 24/7/365, On-site, Network Operations Center (NOC) & Network Operations Security Center (NOSC) Activities, Network Monitoring & Reporting

Event Management

Service Desk
Operate 24/7/365 coverage, On-Site (Building 2), Operate dispatch support to other buildings on Peterson Air Force Base (PAFB), Cheyenne Mountain Air Force Station (CMAFS) and other local locations (within the Colorado Springs local area). Provide remote support to N-NC subordinate locations and NORAD Regions and Sectors.

Provide Tier 1 support to the PAFB complex, other local locations.

Provide Tier 2 support to the PAFB Complex, other local locations and CMAFS. Provide Tier 3 support to the PAFB Complex, CMAFS, other local locations, and N-NC subordinate locations, Regions and Sectors.

PAFB Complex: HQs N-NC (Bldg. 2) and other buildings on PAFB (e.g.: Bldg. 920, Bldg. 104, Hangar 140, Bldg. 1470/1471, etc.).

CMAFS: Data Center Tier 2/Tier 3 support.

Other local locations: J7 off-base facility; Western CONUS Regional Office (WCRO): Tier 1, 2 and 3 Subordinate locations and Regions and Sectors: See above locations listed for NORAD AOO and NORTHCOM AOR.

IT Knowledge Management
Known Error Database, User Training, Tactics Techniques and Procedures, Service Notifications
Incident Management
Response and restoration of Users & Services

Priority 1A (30 min Response, 2hr Resolution)

Priority 1 (2hr to 4hr Resolution)

Priority 2 (8hr to 12hr Resolution)

Priority 3 (12hr to 36hr Resolution)

*All Priorities may require procurement (Break/Fix)

Request Fulfillment
Response and IT delivery of IT services and assets

N2C2

Priority 1A (30 min Response, 6 hour Fulfillment (Workstation & Peripherals)

Priority 1A (30 min Response, 5 Bus Day Fulfillment (New S/W Applications)

Priority 1A (30 min Response, 3 Bus Day Fulfillment (Move)

GO/FOs, Directors (e.t. al) & Direct Supports

Priority 1 (4 hour Response, 2 Bus Day Fulfillment (Workstation & Peripherals)

Priority 1 (4 hour Response, 10 Bus Day Fulfillment (New S/W Applications)

Priority 1 (4 hour Response, 3 Bus Day Fulfillment (Move - 10/month)

All Others

Priority 2 (2 Bus Day Response, 5 Bus Day Fulfillment (Workstation & Peripherals)

Priority 2 (2 Bus Day Response, 20 Bus Day Fulfillment (New S/W Applications)

Priority 2 (2 Bus Day Response, 5 Bus Day Fulfillment (Move -20/month)

*All Priorities may require procurement (Break/Fix)

Access Management
System Privileges, Access (NAR), 8570 Compliance
Technical Management - Problem Management
System Administration of IT infrastructure, servers, network, storage, disaster recovery, backup devices, audio visual equipment/hub (VTC for ~17 Conference Rooms include JWICS), COMSEC/Crypto (COMSEC Responsible Office), and cable plant
Applications Management
System Administration of COTS and GOTS software

SERVICE STRATEGY

Service Portfolio Management
Support Service Package development (Rough Order of Magnitude) for new initiatives

- Service Catalog

IT Enterprise Architecture
Develop and Maintain Architectural Drawings, Support Design/Engineering Efforts

SERVICE DESIGN

IT Security Management
IA Compliance, STIGS, Patch, Vulnerability Management, ACAS Support, Risk Management (DIACAP)
System Engineering
Service Improvement Plans, Service Design Packages
- Availability Management
Measure, Report, Meet Service Catalog KPPs
- Capacity Management
Measure, Report, Meet Service Catalog KPPs
- Continuity Management
Measure, Report, Meet Service Catalog KPPs, O&M COOP/DR site (CMAFS)

SERVICE TRANSITION

Change Management
Provide, analyze, submit RFCs; Change Advisory Board participation
Release & Deployment
Projects, O&M
Service Validation & Test
Projects, O&M
Service Asset Management
Equipment Control Office (ECO) and Information Technology Equipment (ITE) (previously Automated Data Processing Equipment (ADPE)) duties for the command. IT Warehouse Management,
Configuration Management
Develop and Maintain Configuration Database Management

PROCUREMENT

Supplier Management
IT Procurement for Break/Fix, Bench stock, & Technical Refresh

Break/Fix: 20-30 Priority requests/year, (To meet Incident)

Bench stock: manage to appropriate levels to meet incident and request fulfillment requirements

Technical Refresh: plan and deploy to approved plan; dependent upon annual funding availability

PROJECTS

Project Management
10-12 Projects/Year

PWS-to-Award; Obj: 60 Days, Threshold: 90 Days

Avg of 10-12 Projects per Year; Avg Project $700K (20% Labor, 80% Material)

Definitive Projects
Technical Refresh: Workstations/Laptops #/Year and Time Period

Technical Refresh: Infrastructure & Networking

Moves and Events: J7, COS, LOE per Year

Small System Installs and Upgrades

Data Center Transition