RFP_Questions_ _Answers 4th post.doc

DOC document 28 KB Posted

Attached to
Air Force Space Surveillance System Federal contract opportunity
Solicitation number
FA2517-06-R-8002
Issued by
Department of the Air Force Space Command

About this file

RFP Answers to Questions 4th Post

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Space Surveillance System, newest first.
File Type Posted
Amend 0005 Cover Page.pdf PDF
Fence PWS 14 Nov 08_V1_RH —
RFP_Questions_ _Answers 3rd post.doc DOC document
Amendment 0002.pdf PDF
RFP 20 Aug 08_v1 Conformed.docx.docx DOCX document
Attch 16 L-6_StaffingMatrix_FENCE.doc DOC document
Attch 19 WD 05-2058 Rev8 San Diego.txt TXT text file
Attch 15 L-5 PP Transmittal Letter(GovtKt).doc DOC document
Lake Kickapoo CBA 2008-2011.pdf PDF
Jordan Lake 2008-2011 CBA.pdf PDF
Attch 13 L-3 ConsentLetter.doc DOC document
Attch 12 L-2 PP Questionnaire.doc DOC document
Fence PWS 9 Sept 08_RH.docx DOCX document
Silver Lake CBA 2008-2011.pdf PDF
Attch 14 L-4 PP Client Authorization Letter(Commercial).doc DOC document
Tattnall CBA 2008-2011.pdf PDF
Red River CBA 2008-2011.pdf PDF
Elephant Butte CBA 2008-2011.pdf PDF
Arkansas Signed CBA.pdf PDF
Signed Texas CBA.pdf PDF
Alabama Signed CBA.pdf PDF
Hawkinsville CBA 10 01 05 to 09 30 08.pdf PDF
MFR FBO site visit information May 2008.doc DOC document
IndustryDayattendeedparties.doc DOC document
Oneononescheduling.doc DOC document
ListofInterestedParties2.doc DOC document
Answerstotheindustry.doc DOC document
FencePWSDraft10Mar08RH.doc DOC document
NAICSchange.doc DOC document
AtchL-3ConsentLetter.doc DOC document
AtchL-1PPRelevancyMatrix.xls XLS spreadsheet
AtchL-2PPQuestionnaire.doc DOC document
SectionLM18Mar08_LCMreview.doc DOC document
P00041Redacted.PDF PDF
P00038Redacted.PDF PDF
DraftPWSletter.pdf PDF
Reductedmod15-20.pdf PDF
ContractsectionJ.pdf PDF
Reductedmod21-27.pdf PDF
ContractsectionI.pdf PDF
Reductedmod28-31.pdf PDF
ContractAtoC.pdf PDF
ContractDtoH.pdf PDF
QuestionandResponses 1UnionInformation.doc DOC document
MFRFBOsitevisitinformation.PDF PDF
LakeKickapooandElephantButteMaps.pdf PDF
JordanLakeData.zip ZIP file
RedRivermaintenanceRoutines.zip ZIP file
LakeKickapooData.zip ZIP file
SilverLakeMaintenanceRoutines.zip ZIP file
Show all 50

Air Force Space Surveillance System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FENCE RFP FA2517-06-R-8002

Questions & Answers

4th Post Answers to the following question:

1. Question: The latest negotiated CBA rates provided are through FY11 (effective October 1, 2010) and are provided in solicitation attachments 3 through 10 and amendment 2. Should the contractor, for the positions covered by the CBA, use the FY09 rates (effective October 1, 2008) for the base year, use the FY10 rates (effective October 1, 2009) for Option Year 1 and use the FY11 rates (effective October 1, 2010) in pricing all remaining option years?

Reference: Reference: RFP, Section D, 3 Volume III, a. Price Information, 4), Page 81

Answer: Section l-5.D.3.a.4) states: "The Government will incorporate all current and applicable Collective Bargaining Agreements (CBA) and Department of Labor Wage Determinations (WDs) into Section J of the RFP. For positions subject to the CBA and/or Service Contract Act Wage Determinations, the minimum rates must be used. If a position is not covered under a CBA use the applicable area wide wage determination(s) listed in Section J. For those positions covered by CBA, the contractor must meet the minimum requirements of the CBA and should also propose the most appropriate rate(s) for the base year of the contract. For those positions covered by the CBA in which FY10 rates (effective October 2009) are the latest negotiated, use the FY10 rates in pricing all years, and do not escalate proposed out year labor rates. There is no legal authority for a wage increase adjustment for the base year of the awarded contract. Option year rates and associated costs shall not be escalated if not supported by the current CBA. Wage increase adjustments for option years will be made as authorized and in accordance with FAR 52.222-43 Fair Labor Standards Act and Service Contract

Act-Price Adjustment (Multiple Year and Option Contracts) if and when terms of the applicable CBA change. At that time the contractor will be authorized to submit requests for equitable adjustments for option year increases if all applicable FAR clause requirements have been met."

FY 09 CBA/SCA rates should be utilized for the base year and FY10 rates should be utilized for option years.

File details come from the government source that posted it. Updated .