AFSSS Pre-Poproposal Conf Minutes

143 KB Posted

Attached to
Air Force Space Surveillance System
Solicitation number
FA2517-06-R-8002
Issued by

About this file

FENCE Pre-proposal Conference Minutes

Text of this file

08 Oct 2008

MEMORANDUM FOR ALL OFFERORS

FROM: 21 CONS/LGCZB

SUBJECT: Pre-Proposal Conference Meeting Minutes – RFP FA2517-06-R-8002 – Air Force Space Surveillance System (FENCE).

1. The FENCE Pre-proposal was scheduled and conducted to discuss the FENCE RFP and to answer questions submitted. Questions and answers are attached to the Pre-proposal conference briefing slides.

The meeting was conducted via telecom on 06 Oct 2008 at 1000 MDT.

2. The following members attended:

Rusty Hatfield

21 SW/PMDS

Carlo Mosca

21 CONS/LGCZ

Ann Peternal-Boyle

21 CONS/LGCZ

Brett Duryee 21 SW/PMDQ Laura McDonough 20 SW/PMDS

Chris Breeden Rome Research Corp.

Hank Merithew Rome Research Corp.

Collin Schmeisser Five Rivers Services LLC

Lori Thomas Five Rivers Services LLC

Steve Dehaver Five Rivers Services LLC

3.

The following was discussed.

Carlo Mosca, Contracting Officer welcomed everyone and introductions were made by all attendees. Mr. Mosca went through the Pre-proposal briefing slides, briefing the following areas:

· Agenda

· Acquisition Information – Mr. Mosca emphasized that he is the sole point of contact for this acquisition.

· RFP Section L due dates.

· RFP Section M

· PWS – Mr. Mosca asked if anyone had any questions/comments concerning the PWS. All offeror attendees responded negative.

· Questions and Answers – Mr. Mosca went over the questions and answers that were submitted prior to the Pre-Proposal Conference. The question that warranted further discussion was:

Question - How are offerors to propose attendance at an annual 3-day conference for the CPM, site supervisors, and senior technical personnel? (i.e., will the Government select a representative location so offerors can accurately price airfare, lodging, etc.) (reference PWS paragraph 1.1.8.2.1) Answer – During the pre-performance conference the answer was provided that the government anticipates the annual 3-day conference for the CPM, site supervisors, and senior technical personnel to be held at SENSOR Support Activity, Fredericksburg VA. The government further stated that information will be obtained to further clarify paragraph 1.1.8.2.1 and an amendment will be issued to the PWS once this information is obtained.

Updated answer – After further research it was found that the annual 3-day conference can be held at one of three sites: SENSOR Support Activity, Fredericksburg VA; Peterson AFB, Colorado Springs, CO; or Eglin AFB, Valparaiso Fl. No change will be made to the PWS paragraph 1.1.8.2.1. Historically the conferences have been held at the following:

2005 – Not held 2006 - Fredericksburg VA

2007 – Fredericksburg VA

2008 – Not held

· Acquisition Schedule.

Mr. Mosca asked if there were any other questions/comments which both attendees replied negatively.

4.

The meeting concluded at approximately 1020 hours MDT.

CARLO MOSCA

CONTRACTING OFFICER

Other files

File Type Posted
Amend 0005 Cover Page.pdf PDF
Amend. 0004.pdf PDF
Fence PWS 14 Nov 08_V1_RH —
Amend 0003.pdf PDF
RFP_Questions_ _Answers 5th post.doc DOC document
RFP_Questions_ _Answers 4th post.doc DOC document
RFP_Questions_ _Answers 3rd post.doc DOC document
RFP_Questions_ _Answers 2nd post.doc DOC document
RFP_Questions_ _Answers 1st post.doc DOC document
Jordan Lake 2008-2011 —
Red River CBA 2008-2011.pdf PDF
Amendment 0002.pdf PDF
FA2517-06-R-8002 Amend 1.pdf PDF
RFP 20 Aug 08_v1 Conformed.docx.docx DOCX document
PreProposal Briefing Slides.ppt PPT presentation
Current SCA information.doc DOC document
Attch 21 WD 05-2142 Rev7 Tattnall GA.txt TXT text file
Jordan Lake 2008-2011 CBA.pdf PDF
RFP 20 Aug 08_v1.doc DOC document
Attch 18 WD 05-2024 Rev9 Gila River AZ.txt TXT text file
Attch 13 L-3 ConsentLetter.doc DOC document
Attch 12 L-2 PP Questionnaire.doc DOC document
Elephant Butte CBA 2008-2011.pdf PDF
Silver Lake CBA 2008-2011.pdf PDF
Fence PWS 9 Sept 08_RH.docx DOCX document
Attch 16 L-6_StaffingMatrix_FENCE.doc DOC document
Attch 19 WD 05-2058 Rev8 San Diego.txt TXT text file
Attch 14 L-4 PP Client Authorization Letter(Commercial).doc DOC document
Attch 15 L-5 PP Transmittal Letter(GovtKt).doc DOC document
Lake Kickapoo CBA 2008-2011.pdf PDF
Attch 23 WD 05-2296 Rev6 Silver Lake MS.txt TXT text file
Hawkinsville CBA 2008-2011.pdf PDF
Attch 22 WD 05-2236 Rev9 Red River AR.txt TXT text file
Attch 20 WD 05-2140 Rev6 Hawkinsville GA.txt TXT text file
Tattnall CBA 2008-2011.pdf PDF
Attch 25 WD 05-2526 Rev6 Lake Kickapoo TX.txt TXT text file
Red River AR Signed CBA.pdf PDF
Gila River CBA 2008-2011.pdf PDF
Attch 11 L-1 PP Relevancy Matrix_.xlsx XLSX spreadsheet
Attch 24 WD 05-2512 Rev7 Elephant Butte NM.txt TXT text file
Attch 17 WD 05-2012 Rev8 Jordan Lake AL..txt TXT text file
FENCE Pre-Solicitation Notice.doc DOC document
Tattnall CBA 2008-2011.pdf PDF
Red River CBA 2008-2011.pdf PDF
Lake Kickapoo CBA 2008-2011.pdf PDF
Hawkinsville CBA 2008-2011.pdf PDF
Silver Lake CBA 2008-2011.pdf PDF
Jordan Lake 2008-2011 CBA.pdf PDF
Gila River CBA 2008-2011.pdf PDF
Elephant Butte CBA 2008-2011.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .