RFP_Questions_ _Answers 2nd post.doc

DOC document 28 KB Posted

Attached to
Air Force Space Surveillance System
Solicitation number
FA2517-06-R-8002
Issued by

View the file

Other files

File Type Posted
Amend 0005 Cover Page.pdf PDF
Amend. 0004.pdf PDF
Fence PWS 14 Nov 08_V1_RH —
Amend 0003.pdf PDF
RFP_Questions_ _Answers 5th post.doc DOC document
RFP_Questions_ _Answers 4th post.doc DOC document
RFP_Questions_ _Answers 3rd post.doc DOC document
RFP_Questions_ _Answers 1st post.doc DOC document
Jordan Lake 2008-2011 —
Red River CBA 2008-2011.pdf PDF
Amendment 0002.pdf PDF
FA2517-06-R-8002 Amend 1.pdf PDF
RFP 20 Aug 08_v1 Conformed.docx.docx DOCX document
AFSSS Pre-Poproposal Conf Minutes —
PreProposal Briefing Slides.ppt PPT presentation
Current SCA information.doc DOC document
Attch 21 WD 05-2142 Rev7 Tattnall GA.txt TXT text file
Jordan Lake 2008-2011 CBA.pdf PDF
RFP 20 Aug 08_v1.doc DOC document
Attch 18 WD 05-2024 Rev9 Gila River AZ.txt TXT text file
Attch 13 L-3 ConsentLetter.doc DOC document
Attch 12 L-2 PP Questionnaire.doc DOC document
Elephant Butte CBA 2008-2011.pdf PDF
Silver Lake CBA 2008-2011.pdf PDF
Fence PWS 9 Sept 08_RH.docx DOCX document
Attch 16 L-6_StaffingMatrix_FENCE.doc DOC document
Attch 19 WD 05-2058 Rev8 San Diego.txt TXT text file
Attch 14 L-4 PP Client Authorization Letter(Commercial).doc DOC document
Attch 15 L-5 PP Transmittal Letter(GovtKt).doc DOC document
Lake Kickapoo CBA 2008-2011.pdf PDF
Attch 23 WD 05-2296 Rev6 Silver Lake MS.txt TXT text file
Hawkinsville CBA 2008-2011.pdf PDF
Attch 22 WD 05-2236 Rev9 Red River AR.txt TXT text file
Attch 20 WD 05-2140 Rev6 Hawkinsville GA.txt TXT text file
Tattnall CBA 2008-2011.pdf PDF
Attch 25 WD 05-2526 Rev6 Lake Kickapoo TX.txt TXT text file
Red River AR Signed CBA.pdf PDF
Gila River CBA 2008-2011.pdf PDF
Attch 11 L-1 PP Relevancy Matrix_.xlsx XLSX spreadsheet
Attch 24 WD 05-2512 Rev7 Elephant Butte NM.txt TXT text file
Attch 17 WD 05-2012 Rev8 Jordan Lake AL..txt TXT text file
FENCE Pre-Solicitation Notice.doc DOC document
Tattnall CBA 2008-2011.pdf PDF
Red River CBA 2008-2011.pdf PDF
Lake Kickapoo CBA 2008-2011.pdf PDF
Hawkinsville CBA 2008-2011.pdf PDF
Silver Lake CBA 2008-2011.pdf PDF
Jordan Lake 2008-2011 CBA.pdf PDF
Gila River CBA 2008-2011.pdf PDF
Elephant Butte CBA 2008-2011.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FENCE RFP FA2517-06-R-8002

Questions & Answers

2nd Post Answers to the following questions:

1. Question: We believe that Environmental, Safety and Occupational Health functions (PWS 1.5) and Security functions (PWS 1.4) are significant to the AFSSS mission. However, the Government has not included specific requirements to address these PWS functions in Section L. Is it the Government’s intention to have potential contractor’s address the requirements of PWS 1.4 and 1.5 in Volume II-Technical?

Reference: PWS 1.4 and 1.5.

Answer: Yes

2. Question: Will the Government consider the costs of the required fire prevention, first-aid, and fire fighting procedures training as reimbursable under the CR CLIN defined in PWS Part 1, Chapter 6, 1.6?

Reference: PWS Part 1, Chapter 5, 1.5.3, Page 11.

Answer: No, these costs should be captured under the O&M CLINS.

3. Question: Will the Government consider the costs of the required fire extinguisher inspections IAW NFPA Fire Code 10 as reimbursable under the CR CLIN defined in PWS Part 1, Chapter 6, 1.6

Reference: Part 1, Chapter 5, 1.5.3.1, Page 11 Answer: Yes, this cost is reimbursable under the CR CLIN.

4. Question: Due to the distance from the Elephant Butte, NM site to any local refueling infrastructure, it would not be cost efficient to drive the 80 miles round trip to gas up the company vehicles. Would the Government consider allowing us to fill the on-station petroleum storage tank at our expense, and then carefully meter and document any fuel used in support of grounds maintenance activities. The cost of the grounds maintenance fuel would then be billed against the CR CLIN defined in PWS Part 1, Chapter 6, 1.6.

Reference: Part 1, Chapter 6, 1.6.6, Page 13, Transportation

Answer: Yes, that would be permissiable.

File details come from the government source that posted it. Updated .