Q and A Part 2.pdf

PDF 278 KB Posted

Attached to
Advanced Flight Simulator
Solicitation number
F6Q1100212AW01
Issued by

View the file

Other files

File Type Posted
Q and A Part 3.pdf PDF
Q and A.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

1. Has an aircraft manufacturer been selected? I ask because the Cessna Models have different controls then Piper. And I am currently working with the FAA on an AATD renewal, per AC61-136B, the throttle controls must be appropriate to the aircraft model represented.

Answer: (single engine) Beechcraft Bonanza 6 Pack Analog Configuration with GNS430/530 (retractable gear) (multi-engine) Baron BE58 G1000 w/GFC 700AP (retractable gear)

2. Enclosed Cockpit or Open-- Answer: Closed

3. Are the Visuals required to be mounted to the motion platform to move with the device?—

Answer: Mounted to the platform.

4. Verify if this will be a 6DOF Full Motion Device not a 3DOF. Answer 6D0F

5. NAV updates come from Jeppesen or Garmin, we normally provide the most current data but as you may know it changes every 28 days . Customers usually provide their own source but if you like we can provide that service where we log in and update you NAV data.

Answer: Must provide 4 years of data

6. Our controls are Electronically Linked. The advantage all control forces can be modified if required.

Answer: Must be mechanically linked.

7. Not sure what Analyze Flight Button means.

Answer: Capable of debrief

File details come from the government source that posted it. Updated .