SITE_VISIT_QUESTIONS_AND_ANSWERS.docx

DOCX document 17 KB Posted

Attached to
Repair Outdoor Base Signage
Solicitation number
F5D3126012A0001
Issued by

View the file

Other files

File Type Posted
BID_OPENING.pdf PDF
FA4654-16-B-0001_Amendment_0001.docx DOCX document
DOL_WD_IN_160002_04152016_IN2.docx DOCX document
WD_IN160002_030416.docx DOCX document
162019-spec.pdf PDF
162019-drawing.pdf PDF
IFB_FA4654-16-B0001_-_Signs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet C102 has a M symbol for a couple signs on Hoosier Blvd. We can't find any detail on the legend for those signs. Please clarify.

ANS: M sign on Hoosier Blvd is Not in contract

For the building signs, please clarify if the contractor is responsible to remove and cover up the old sign anchors in the exterior walls. Please clarify if the contractor is responsible for the appearance issues of the exterior walls due to the sun and weathering changes to brick and painted surfaces.

ANS: Contractor is responsible for filling in holes. Weathering of existing brick is not in contract.

What is the “G” in Key Category of the Sign Schedule?

ANS: key G are areas that get the single Q2 sign. Listed as Q2 on sheet C102

What is a sign “M” – listed on drawing C102 but not in Legend?

ANS: Not in contract

Where is sign 56 relocated to (C602 – cut 26) ANS: Answer is forthcoming in a solication ammendment.

C602 cut 33 is a duplicate of cut 32 – where is sign 22 to be located?

ANS: intersection of Boom place and tanker. 6’ off of curb 11’ off of light pole.

Bldg 572 not on plans but on Sign Schedule – what takes precedence?

ANS: Sign schedule indicates to provide sign provide sign on building 572. Issues are case by case

There are two sheets marked as drawing 4 of 9 (CD500 and C501) and no drawing is marked 7 of 9. Is there a drawing missing?

ANS: ignore sheet # of 9. There are 9 sheets in the project. See sheet G001

Also regarding the monument sign – what exactly needs to be done to the face of the sign? I did see the note to save the logo and letters but was unsure what was being done for a new sign?

ANS: See sheet A /C501

As far as the Annex sign – are we just removing it?

ANS Remove annex sign replace with sign A2. See Sheet A2 C501 and Detail 42/ C602

NIC signs (is this Not in Contract) – can you clarify?

ANS: yes NIC is not in contract

Also there is a note to remove the Planter – is this part of the scope?

ANS: Yes

After reading through this it seems most of the signage is missing the quantity needed. Do you happen to have any documents or lists that just describe each sign, size and quantity? Example – Remove Multiple Signs on Columns and Walls and Relocate Q1 and Install new Q2 Signs on Column.

ANS: No documents are missing. Bid as appropriate. Not sure of any other issue than the example. For bid purposes assume unless told otherwise remove sign means remove one sign. Remove multiple signs means 2-4. Additional info is forthcoming in a solication ammendment.

Glass and BX Sign – Not sure what these are?

ANS: NIC