- Solicitation number
- F4F1AV1252AC01
About this file
CDRL A005
View the file
Other versions and copies of DI-QCIC-80512
| File | Revision | Posted | Attached to |
|---|---|---|---|
| Attachment 11 DI-QCIC-80512 (Installation Test Report).pdf | Revision not stated | BASE WIDE WI-FI AVIANO AIR BASE ITALY | |
| DIQCIC80512 Installation Test Report.pdf | Revision not stated | BASE WIDE WI-FI, AVIANO AIR BASE, ITALY | |
| DI-QCIC-80512.pdf | Revision not stated | Radio and Equipment Upgrade | |
| Appendix_M_-_DI-QCIC-80512.pdf | Revision not stated | Upgrade and Repair of the General Electric (GE) Fuel Accessories Test Stand (FATS) 04-02 and the GE Main Engine Control (MEC) Test Stand 05-03 | |
| DI-QCIC-80512.pdf Same revision and size as this file | Revision not stated | Upgrade of the WPAFB E911 System for 88 SFS |
Who attaches DI-QCIC-80512
Other files
| File | Type | Posted |
|---|---|---|
| DI-ADMN-81505.pdf | ||
| DI-ILSS-81070.pdf | ||
| DI-DRPR-80151A.pdf | ||
| DI-MISC-81382.pdf | ||
| DI-NDTI-80566A.pdf | ||
| DI-MGMT-80368A.pdf | ||
| 911 Fire J A Signed RED.pdf | ||
| 110920 -- SOW WPAFB E911 Tech Refresh Rev 4.docx | DOCX document |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: Installation Test Report
Number: DI-QCIC-80512 Approval Date: 880121 AMSC Number: F4299 Limitation:
DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility:
Applicable Forms:
Use/relationship:
This DID contains the format and content preparation instructions for the data generated by the specific and discrete task requirement as delineated in the contract.
The Installation Test Report is applicable to the inspection, testing, and acceptance of the installation of communications-electronic (C-E) equipment and facilities. It is frequently invoked in conjunction with DID DI-QCIC-80511
This DID supersedes DI-T-3720B.
Requirements:
Content. The Installation Test Report shall contain the following:
a. Data sheets showing the actual measurements made on each facility/equipment during the preshakedown, shakedown, and operational tests, and the acceptance limits or criteria for each measurement.
b. A list of all test equipment, by manufacturer and model number, used for the date, and the name of the activity performing the calibration of each test
c. A list of items or parts used during installation testing.
d. A list of major equipment/facilities installed and tested at each location.
Format. The contractor's format is acceptable.
END OF DI-QCIC-80512