Safety_Appx_C_72SEG-14-001.docx
DOCX document 30 KB Posted
- Attached to
- Washers & Dryers Rental and Maintenance
- Solicitation number
- F3Y0AA4294AL02
About this file
Appendix C - Safety
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| Quote_Sheet.doc | DOC document | |
| Quote_Sheet.doc | DOC document | |
| Quote_Sheet.doc | DOC document | |
| WD_2005-2431.txt | TXT text file | |
| RFQ.docx | DOCX document | |
| PWS_revised_on_Nov_2014.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 December 2013
SAFETY SPECIFICATION
WASHER AND DRYER SERVICES
PREFILE NO: 72SEG-14-01
PREPARED BY: 72 ABW/SEG
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1. Mishap notification/reporting as defined in paragraph I.B. below.
2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.
B. Mishap Notification.
1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.
2. Mishap notifications shall contain, as a minimum, the following information:
| a. | Contract, Contract Number, Name and Title of Person(s) Reporting |
| b. | Date, Time and exact location of accident/incident |
| c. | Brief Narrative of accident/incident (Events leading to accident/incident) |
| d. | Cause of accident/incident, if known |
| e. | Estimated cost of accident/incident (material and labor to repair/replace) |
| f. | Nomenclature of equipment and personnel involved in accident/incident |
| g. | Corrective actions (taken or proposed) |
| h. | Other pertinent information |
3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.
D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.
SECTION II - SAFETY PROGRAM ELEMENTS
The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements Element/Requirement Referenced Benchmark
OSHA General Industry Standards 29 CFR 1910
| Mishap Notification/Reporting | AFI 91-204 | |
| The Air Force Traffic Safety Program | AFI 91-207 |
Air Force Motor Vehicle Traffic Supervision AFI31-218TAFBSUP
SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES
These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.
AFI 91-204 Feb 06 Safety Investigations and Reports
AFI 91-203 Jun 12 Air Force Consolidated Occupational Safety Instruction
AFI 91-207 Sep 13 The Air Force Traffic Safety Program
AFI31-218 Sep 11 Air Force Motor Vehicle Traffic Supervision
TAFBSUP
File details come from the government source that posted it. Updated .