Safety_Appx_C_72SEG-14-001.docx

DOCX document 30 KB Posted

Attached to
Washers & Dryers Rental and Maintenance
Solicitation number
F3Y0AA4294AL02
Issued by

About this file

Appendix C - Safety

View the file

Other files

File Type Posted
Questions_and_Answers.docx DOCX document
Quote_Sheet.doc DOC document
Quote_Sheet.doc DOC document
Quote_Sheet.doc DOC document
WD_2005-2431.txt TXT text file
RFQ.docx DOCX document
PWS_revised_on_Nov_2014.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12 December 2013

SAFETY SPECIFICATION

WASHER AND DRYER SERVICES

PREFILE NO: 72SEG-14-01

PREPARED BY: 72 ABW/SEG

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap notification/reporting as defined in paragraph I.B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.

B. Mishap Notification.

1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.

2. Mishap notifications shall contain, as a minimum, the following information:

a.Contract, Contract Number, Name and Title of Person(s) Reporting
b.Date, Time and exact location of accident/incident
c.Brief Narrative of accident/incident (Events leading to accident/incident)
d.Cause of accident/incident, if known
e.Estimated cost of accident/incident (material and labor to repair/replace)
f.Nomenclature of equipment and personnel involved in accident/incident
g.Corrective actions (taken or proposed)
h.Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements Element/Requirement Referenced Benchmark

OSHA General Industry Standards 29 CFR 1910

Mishap Notification/ReportingAFI 91-204
The Air Force Traffic Safety ProgramAFI 91-207

Air Force Motor Vehicle Traffic Supervision AFI31-218TAFBSUP

SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES

These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.

AFI 91-204 Feb 06 Safety Investigations and Reports

AFI 91-203 Jun 12 Air Force Consolidated Occupational Safety Instruction

AFI 91-207 Sep 13 The Air Force Traffic Safety Program

AFI31-218 Sep 11 Air Force Motor Vehicle Traffic Supervision

TAFBSUP

File details come from the government source that posted it. Updated .