This document is a Statement of Objectives (SOO) and technical specification for a Mobile Asphalt Batch Plant required by the U.S. Air Force. The equipment is an asphalt mixing plant used to produce Hot Mix Asphalt (HMA) for road paving, specified as brand DMI Asphalt Equipment or equivalent.

The plant must be a portable type with modular structure design and transport frame chassis, capable of installation and self-erection within four hours. Output capacity must range from 140-160 metric tons per hour at 3% aggregate moisture, with Reclaimed Asphalt Pavement (RAP) mixing capability of 30%-50%. The system comprises two chassis: Chassis One contains four independent feed hoppers, dryer, and automatic burner; Chassis Two carries the vertical elevator, screening, weighing and mixing tower, control cabin, primary cyclones, and secondary bag filter. Key specifications include a 25,000-gallon asphalt cement storage tank, 180 ton/hour elevator capacity, 160 ton/hour dryer capacity with counter-flow design, four aggregate bins plus three RAP bins, 50-ton hot storage capacity, and comprehensive control systems with HVAC-equipped operator stations. Safety requirements include minimum 12 quartz halogen flood lights (2000 lumens each) with red-light night operation capability, eight tie-down locations per side per ATTLA certification, and slip-resistant access platforms. The equipment must feature military-grade rustproofing compliant with MIL-PRF-16173 Grade 4 and MIL-C-83933, with minimum five-year corrosion protection life expectancy, welding per AWS standards, and complete surface preparation and cleaning. Contractor deliverables include a five-year warranty plan, initial 40-hour operator and maintenance training on-site, two complete sets of operators/parts/service manuals with diagnostic troubleshooting software compatible with Windows 10 (64-bit), consumable parts for 100,000-ton production, 24-month warranty service with all software updates, 24/7 technical support, and military data plates with specified nomenclature and vehicle information.

View the file

Other files

File Type Posted
Attachment 2 - Items List.pdf PDF
Combo Synopsis Solicitation.pdf PDF
Attachment 3 - Brand Name Justification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASPHALT BATCH PLANT

Brand Name or Equal to: DMI Asphalt Equipment

The ASPHALT BATCH PLANT is an asphalt mixing plant used for producing Hot Mix Asphalt (HMA), which is used to pave the road. Asphalt is made of bitumen, aggregate and filler, sometimes collectively known as blacktop or asphalt concrete.

Note: Pictures are visual reference only; not intended request specific brand

MAIN COMPONENTS

• Cold aggregate supply system

• Drying drum

• Burner

• Hot aggregate elevator

• Dust collector

• Vibrating screen

• Hot aggregate storage hopper

• Weighing and mixing system

• Filler supplying system

• Finished asphalts storage silo

• Bitumen supplying system

• All electrical, hydraulic, water, and oil transfer lines shall be supplied to ensure system can fully operate

• All connection points shall be clearly labelled identifying their purpose

MOBILE ASPHALT PLANT

• Mobile/Portable Asphalt Plant with transport frame chassis which can which is portable type asphalt concrete plant, features modular structure design and transport frame chassis, fast and easy installation o Output capacity range 140-160 Metric Tons ton per hour (3% aggregate moisture) o RAP mixing Capable 30% - 50%

• Chassis o Chassis One (1): Four independent feed hoppers, dryer and automatic burner mounted on one chassis;

o Chassis Two (2): Carries the vertical elevator, screening, weighing and mixing tower, control cabin, primary cyclones and secondary bag filter

• Installation and Self erection of the main components achievable within four (4) hours and operational with the addition of a bitumen tank and reclaimed filler silo

MAIN COMPONENTS (minimums)

• Main hopper capacity (heaped): minimum 5.0 yd3

• Hopper loading width: 3.0 yd

• Belt feeder centers: 4 feet

• Belt width: 1.5 feet

• Belt feeder drive: 2.2 kW

• Vibrator fitted to sand hopper

• Collecting conveyor width: 1.5 feet

• Collecting Conveyor drive: 2.2 kW

• Drum

• Bins (minimum: 4)

• Asphalt Cement tank 25,000 gallon

• Scales

• Fuel pump

• Control station/house / Operation controls

• Dust recycling capacity: 15 ton/hr

HOT STONE ELEVATOR, SCREEN & MIXING SECTION

• Elevator capacity: 180 ton/hr

• Elevator drive: 15 kW

• Screen decks: 4 and top vibratory head

• Screen length: 3.0 yd

• Screen width: 1.5 yd

• Screen drive: 7.5 kW

• Hot storage capacity: 50 tons (minimum)

• Hot storage bins: 4

• Aggregate weigh hopper capacity: 2200 lbs

• Bitumen weigh hopper capacity: 450 lbs

• Filler weigh hopper capacity: 450 lbs

• Paddle mixer capacity: 2200 lbs

• Paddle mixer drive: 2 x 11.0 kW

AGGREGATE DRYER/MIXER DRUM (counter flow)

• Dryer drum diameter: 1.5 yd

• Dryer drum length: 7 yd

• Dryer drive: 30 kW

• Dryer capacity: 160 ton/hr

BINS

• Aggregate (4 each): virgin aggregate, crushed stone, sand, and gravel

• RAP Reclaimed Asphalt Pavement (3 each)

• Scalping screen between cold feed bins and mixing drum

AIR VOLUME

• Dryer: 23,500 – 27,500 yd3/h

• Mixing section: 6300 - 6700 yd3/h

• TOTAL: 29,800 – 34,200

BITUMEN/ASPHALT CEMENT STORAGE TANK(S)

• Capacity: 25,000 Gallon (minimum)

• Two/three axle chassis depending on capacity

• High density insulation and robust external finish

• Thermostatically controlled system

• Self-contained heating system to maintain product temperature

• Integral pump permitting loading and discharge of product

• Easy to operate and requires minimal maintenance

HEATING SYSTEM

• Fully automatic (24-hr), high efficiency burners

• Minimum 500-gallon burner fuel tank

• Stainless steel flame liners

• Thermal fuse protected fuel line

WEIGHT SCALE FOR DISPENSED MATERIAL

• Truck Scale and Silo/chute scale

• Air actuated

PUMPING SYSTEM

• Integral pump

• Metering system on AC pump

• Auxiliary hydraulically driven

• Minimum 7400 – 8200 gallon per hour capacity

• Feed Pump: 7.5 kW

AIR SUPPLY

• Receiver Tank: 125 gallon (minimum)

• Air Supply: 15 kW

CONTROL STATION

• Operator’s control station equipped to operate and monitor all functions of Mobile Asphalt

Plant and Bitumen tank

• Station equipped with Heating, Ventilation, Air Conditioning (HVAC)

• Equipped with 125 VAC power [Identifying standard wall plugs are included (rated at

120V)]

• Control panels for all functions of mobile asphalt plant

• All controls clearly labeled, illuminated

• High quality interior and exterior lights

• Operating temperature: 32°F - 130°F

SAFETY

• Optimum night lighting o A minimum of (12 each) – 2000 lumen each quartz halogen flood lights with switch to Red light night operations with integrated wiring harnesses mounted to mixer o Withstand up to 15.3 Grms vibration at 24-2000Hz / 4.65Grms at 12-2000Hz o Stop, Turn, Tail, Warning lights (rear) o Clearance and side marker lights

• Minimum of 8 integrated tie down locations on each side as determined by ATTLA certification

• Equipped with sufficient lifting points by use of crane; clearly labeled Lift Point

• All steps and ladders made of slip resistant material o Handrails for accessing work platforms made of slip resistant material

PAINT/CORROSION PROTECTION

• Manufacturer standard commercial color

• Maximum manufacturer’s factory rustproof/corrosion protection package throughout o Minimum 5 year life expectant on rustproof/corrosion protection o Automotive grade primer/paint o Military grade rustproofing throughout machine Shall comply with Military Specifications: MIL-PRF-16173, Grade 4 and MIL-C-83933 Electrical/hydraulic lines covered/protected from damage during machine operation

• Machine, including all parts and accessories, shall be constructed and finished thoroughly without blemish, flaws, defects and/or sharp edges/corners.

• Welding and post heat treatment procedures shall be performed in accordance with American Welding Society (AWS) Welding Code. The surface parts to be welded shall be free from rust, scale, paint, grease, and other foreign matter. Welds shall be of sufficient size and shape to develop the full strength of the welded parts. Welds shall transmit stress without cracking or permanent distortion when the parts connected by the welds are subjected to test, proof, and service loadings

• Machine shall be thoroughly cleaned. Loose, spattered, or excess welding slag; stray bolts, nuts, and washers; rust; metal particles; pipe compound; and other foreign matter shall be removed during and after final assembly

WARRANTY

• 5 Year Warranty Plan

TRAINING

• Conduct initial set-up, tear-down, and operating training.

• Conduct yearly refresher training for a minimum of 3 personnel.

PARTS and SERVICE MANUALS

• Complete set of manuals available at time of delivery to the Air Force, No Exceptions

• Includes parts breakdown, service manual and scheduled lubrication chart, repair processes for any and all parts/components of machine, No Exceptions

• Two (2) complete sets of Operators, Parts and Service manuals to include drive engine, auxiliary engine (if equipped), transmission, and any/all mounted and/or attachments shipped with machine

• Consumable parts necessary for up to 100,000 Ton production

• Provide diagnostic troubleshooting software/devices to end users o Air Force vehicle maintenance personnel shall have capability to diagnose, troubleshoot, and service machine locally o Diagnostics capable for all components of machine, No Exceptions All software and firmware shall function as intended, and shall be free of vulnerabilities (i.e. defects, bugs, malware, etc.), either intentionally or unintentionally inserted as part of the software/firmware throughout the lifecycle.

Any Windows-based software shall be compatible with Windows 10 (64-bit) operating system.

CALIBRATION AND MAINTENANCE

• Within calendar year / Contractor can coordinate with user upon award

• Contractor must confirm the maintenance schedule and dates with the Government prior to equipment delivery

• Vendor provides 24-month warranty service for any/all components of machine regardless of manufacturer of prime mover, accessory, and/or attachments as delivered to the Air Force o 24-month warranty includes ALL software updates

• Standard Wear-Part replacement plan

• 24/7 technical support option

• Spare parts list with part numbers

MANUFACTURER/DEALERSHIP will include

• Initial operator’s familiarization set-up (minimum 40 hours – on site)

• Initial maintenance familiarization set-up (minimum 40 hours – on site)

• Military Marking / Data Plate(s)

• Data plates will include the following information, at a minimum

NOMENCLATURE: __________________________

MAKE AND MODEL: ________________________

MFR’S SERIAL #: (VIN_______________________)

REGISTRATION #:___________________________

NSN: ________________________________

VEHICLE CURB WEIGHT: __________LBS

PAYLOAD, MAXIMUM: ____________LBS

GROSS WEIGHT, MAX: ____________LBS

GROSS WEIGHT COMB MAX: ______LBS

DATE OF DELIVERY: _________________

WARRANTY: __________MO___________MILES

CONTRACT #: ______________________

SHIP TO: _____________________

MARK FOR: __________________

US PROPERTY

MAIN COMPONENTS
MOBILE ASPHALT PLANT
o Output capacity range 140-160 Metric Tons ton per hour (3% aggregate moisture)
o RAP mixing Capable 30% - 50%
MAIN COMPONENTS (minimums)
Main hopper capacity (heaped): minimum 5.0 yd3
Hopper loading width: 3.0 yd
Belt feeder centers: 4 feet
Belt width: 1.5 feet
Belt feeder drive: 2.2 kW
Vibrator fitted to sand hopper
Collecting conveyor width: 1.5 feet
Collecting Conveyor drive: 2.2 kW
Drum
Bins (minimum: 4)
Asphalt Cement tank 25,000 gallon
Scales
Fuel pump
Control station/house / Operation controls
Dust recycling capacity: 15 ton/hr
HOT STONE ELEVATOR, SCREEN & MIXING SECTION
Elevator capacity: 180 ton/hr
Elevator drive: 15 kW
Screen decks: 4 and top vibratory head
Screen length: 3.0 yd
Screen width: 1.5 yd
Screen drive: 7.5 kW
Hot storage capacity: 50 tons (minimum)
Hot storage bins: 4
Aggregate weigh hopper capacity: 2200 lbs
Bitumen weigh hopper capacity: 450 lbs
Filler weigh hopper capacity: 450 lbs
Paddle mixer capacity: 2200 lbs
Paddle mixer drive: 2 x 11.0 kW
AGGREGATE DRYER/MIXER DRUM (counter flow)
Dryer drum diameter: 1.5 yd
Dryer drum length: 7 yd
Dryer drive: 30 kW
Dryer capacity: 160 ton/hr
BINS
Aggregate (4 each): virgin aggregate, crushed stone, sand, and gravel
RAP Reclaimed Asphalt Pavement (3 each)
Scalping screen between cold feed bins and mixing drum
AIR VOLUME
Dryer: 23,500 – 27,500 yd3/h
Mixing section: 6300 - 6700 yd3/h
TOTAL: 29,800 – 34,200
Metering system on AC pump