Questions and Answers for Solicitation
F3QCCM0050A001
Question 1: Statement: humidity control system is extremely expensive.
Answer 1: The humidity control system will not require to be programmable, but it should stay within the range listed that is a technical requirement for painting.
Question 2: Assumption: Contractor shall be supplying the Ductwork / duct connection
Answer 2: The contractor will supply duct work.
Question 3: Please clarify that no holes are to be made through the roof for the stacks and fresh air makeup unit?
Answer 3: There will be a requirement to cut the holes for the exhaust and air makeup unit. The pressure differential needs to be the drop across all three stages not each individual stage.
Question 4: Are there any progress payments on this project?
Answer 4: No.
Question 5: Please confirm that a natural-gas fired oven is acceptable for this project.
Answer 5: Natural gas can be used for the cure oven.