SOW 17 Aug 2012.doc.pdf

PDF 56 KB Posted

Attached to
Spindle Repair
Solicitation number
F3QCCL2222A003
Issued by

About this file

Statement of Work (SOW)

View the file

Other files

File Type Posted
Reamer Bushing Kit Product Description 6 Sept 12 —
Solicitation Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SPINDLE REBUILD

WR003291

17 AUGUST 2012

1. SCOPE:

Currently the spare spindle assembly for the FTV5-2500 High Speed Machining Center

(WR003291) is inoperative and needs to be refurbished. This machine is used to produce parts for all aircraft divisions. Timely repair of this equipment will ensure that we will have a spare spindle in house and potentionally decrease the amount of down time the machine will experience.

2. TASKS:

The contractor will be required to repair the spindle to original OEM specifications. The contractor shall perform all required test and checkout procedures as necessary to ensure the spindle is operational and up to manufacturer’s specifications.

3. SHIPPING:

The contractor shall return rebuilt FTV5-2500 High Speed Machining Center:

402 MXSS – ATTN: Jeremy Johnson

235 Robins Parkway, Suite 15

Building 321

Robins AFB, GA 31098

4. ACCEPTANCE OF INSTALLATION.

The inspection/acceptance of repair shall be by Government POC and acceptance shall be upon satisfactory demonstration of the FTV5-2500 High Speed Machining Center (WR003291) performance upon return delivery to Government POC.

File details come from the government source that posted it. Updated .