SOW 17 Aug 2012.doc.pdf
PDF 56 KB Posted
- Attached to
- Spindle Repair
- Solicitation number
- F3QCCL2222A003
About this file
Statement of Work (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Reamer Bushing Kit Product Description 6 Sept 12 | — | |
| Solicitation Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SPINDLE REBUILD
WR003291
17 AUGUST 2012
1. SCOPE:
Currently the spare spindle assembly for the FTV5-2500 High Speed Machining Center
(WR003291) is inoperative and needs to be refurbished. This machine is used to produce parts for all aircraft divisions. Timely repair of this equipment will ensure that we will have a spare spindle in house and potentionally decrease the amount of down time the machine will experience.
2. TASKS:
The contractor will be required to repair the spindle to original OEM specifications. The contractor shall perform all required test and checkout procedures as necessary to ensure the spindle is operational and up to manufacturer’s specifications.
3. SHIPPING:
The contractor shall return rebuilt FTV5-2500 High Speed Machining Center:
402 MXSS – ATTN: Jeremy Johnson
235 Robins Parkway, Suite 15
Building 321
Robins AFB, GA 31098
4. ACCEPTANCE OF INSTALLATION.
The inspection/acceptance of repair shall be by Government POC and acceptance shall be upon satisfactory demonstration of the FTV5-2500 High Speed Machining Center (WR003291) performance upon return delivery to Government POC.
File details come from the government source that posted it. Updated .