Recycling Center Revised Answers

15 KB Posted

Attached to
Renovation of Recycling Center (B/987)
Solicitation number
F3Q2AD1088A002
Issued by

Text of this file

Recycling Center B/987 Questions and Answers 29 Jul 11

REVISED ANSWERS TO PREVIOUS QUESTIONS:

Q5: Under Specifications Part 1 General-1.01 Statement of Work-_New Work 9 (Base Bid) #14 - request automatic roll up door – Division 8 – 08330 -2.2-#8 (Operation-Manual Push Up) REVISED ANSWER A5: #14 – Operator shall be manual push up automatic roll-up door with key remote.

Q30: Item # 14 in the scope of work says the roll up door is to have an electric keypad operator and two remote controls, with interior safety edge sensors. The drawings – sheet A-5.0 – calls for a manual door and page 4 of 5 in spec section 08330 section 2.2-A.8 calls for manual.

REVISED ANSWER A30: Operator shall be manual push up automatic roll-up door with key remote.

CE ADDED ITEMS TO BASE BID PACKAGE:

1. See attached specification Section 01569, Lead-Based Paint In-Place Management and Abatement for RAFB.

Other files

File Type Posted
01569 - Lead Based Paint.pdf PDF
Combined Specs —
Bldg 987 water line and gas line.jpg JPG image
FA8501-11-R-0041-01.pdf PDF
Recycling Center Questions and Answers _25 July 2011 rev 1_ _2_.pdf PDF
Site Visit Attendee List.pdf PDF
QRP-FLR PLAN 27APR2011.pdf PDF
FA8501-11-R-0041.pdf PDF
QRP-FLR PLAN 24MAR2011.pdf PDF
Combined Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .