QRP-FLR PLAN 24MAR2011.pdf
PDF 2 MB Posted
- Attached to
- Renovation of Recycling Center (B/987)
- Solicitation number
- F3Q2AD1088A002
About this file
Project Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
C. COOK
07 FEB 2011
A-0.0
HENRY
COVER PAGE
RECYCLING COLLECTION FACILITY
SRA COLUMBUS COOK
OCT 2010
78 AIR BASE WING
ROBINS AFB, GA
DRAWING INDEX
COVER SHEET
SITE PLAN
EXISTING FLOOR PLAN
EXISTING ELEVATIONS
EXISTING ELECTRICAL & HVAC PLAN
DEMOLITION PLAN
NEW FLOOR PLAN
NEW ELEVATIONS
SECTIONS
NEW LIGHTING & ELECTRICAL PLAN
RECYCLE WINDOW DETAILS
A-0.0
C-1.0
A-1.0
A-2.0
E-1.0
A-3.0
A-4.0
A-5.0
E-2.0
A-6.0
S-1.0
A-7.0RECYCLE WINDOW DETAILS
INTERIOR ELEVATIONS I-1.0
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
C. COOK
07 FEB 2011
C-1.0
HENRY
SITE PLANSITE PLAN SCALE: 1/32"=1'-0"
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
N O
R T
H
10'-4"16'-1"19'-10"16'-1"18'-2"16'12'
4'-9"3'-6"18'-1"3'-6"8'-5"3'-6"8'-7"3'-6"8'-8"3'-6"20'-7"3'-6"8'-6"3'-6"4'-5"
12'
14'-7"6'8'-1"6'17'6'16'-3"6'8'-10"6'13'-10"
13'-11"2'-1"
0'-5"
5'-7"7'-2"5'-10"3'-6"7'-4" 1'-1"
0'-5"
0'-3"
3'-6"
0'-5"
5'-8"
0'-5"
0'-8"
5'-10"5'-11"3'-6"3'-9"
8'-1"
17'-6"
14'-10"8'-1"21'-5"19'-5"23'-9"21'-1"
108'-6"
A B C D E F
"7'-5" 13'-6"
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
C. COOK
16 MAR 2011
EXISTING
A-1.0
HENRY
FLOOR PLAN
EXISTING FLOOR PLAN SCALE: 1/4"=1'-0"
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
EXISTING RAFTER BRACING
EXISTING WINDOW FRAMING
WITHIN WALL. PLEASE VERIFY
ONSITE.
NOTE:
AN ONSITE ASBESTOS SURVEY HAS
BEEN PERFORMED. NO ASBESTOS IS
ANTICIPATED IN PROJECT.
EXISTING CONCRETE
PAD
STORAGE
ROOM
ROOM # 5ROOM # 4ROOM # 3ROOM # 2ROOM # 1
ROOF OVERHANG
6'-1"
108'-7"
4'-5" 3'-6" 8'-6" 3'-6" 20'-7" 3'-6" 8'-8" 3'-6" 8'-7" 3'-6" 8'-5" 3'-6" 20'-3" 3'-6" 4'-8"
0'-8"
17'-8" 14' 8'-8" 3'-6" 10'-10" 9'-11" 3'-6" 8'-10" 14'-10" 8'-11" 3'-6" 4'-6"
0'-6"
0'-6"
24'-1"29'-8"28'-1"26'-1"
7'-5" 13'-6"
4'1'-5"
10'-1"
25'-4"
4'-11" 3'-6" 8'-8" 3'-6" 4'-9"
1'-4"
C
E
IL
IN
G
H E
IG
H T
10'-1"
2'-6"
4'-9" 3'-6" 8'-8" 3'-6" 4'-11"
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
16 MAR 2011
EXISTING
HENRY
EXISTING NORTH ELEVATION
EXISTING WEST ELEVATION
EXISTING EAST ELEVATION SCALE: 3/16" =1'-0"
EXISTING SOUTH ELEVATION SCALE: 3/16" =1'-0"
SCALE: 3/16" =1'-0"
SCALE: 3/16" =1'-0"
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
A-2.0
ELEVATIONS
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
EXISTING MTL
ELECTRICAL BOX
EXISTING 3" MTL
ELECTRICAL
SERVICE POLE.
EXISTING EXTERIOR
PARTICLE BOARD
EXISTING 4'X8' PLYWOOD
AT DOOR OPENINGS, TYPICAL
EXISTING ROOF VENTS
TO REMAIN
EXISTING RIDGE VENT
SYSTEM
WINDOW OPENING
BEHIND EXISTING SIDING
LINE OF EXISTING
CEILING
1"X6"
WOOD TRIM
LINE OF
EXISTING CEILING
EXISTING MTL
EDGE
1"X8" RAKE
10' CEILING HEIGHT
1"X4"
WOOD TRIM
EXISTING BRICK
COURSE. VARIES
EXISTING MTL GUTTERS
& DOWNSPOUTS. TYPICAL
EXTERIOR VENT
GAS BUCKET/METER
W/ SUPPLY LINE
EXISTING ASPHALT SHINGLES
EXISTING ASPHALT SHINGLES
FINISHED FLOOR
CMCM
CM
CM
CM
CMCM
CM
CM
CM
CM
CMCM
CM
CM
37'-2"37'16'-10"
ELECTRICAL LEGEND
S
NEW ELECTRICAL PANEL
CONCEALED & UNCONCEALED WIRING
SINGLE POLE SWITCH
NEW 110 RECEPTACLE
NEW EXTERIOR LIGHT FIXTURE
S
WP NEW 110 WEATHERPROOF RECEPTACLE
DOUBLE POLE SWITCH
C. COOK
07 FEB 2011
EXISTING
E-1.0
EXISTING ELECTRICAL & HVAC PLAN SCALE: 1/4"=1'-0"
ELECTRICAL &
HVAC PLAN
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
ELECTRICAL BREAKER
PANEL W/ FLEX WIRES
RUNNING THROUGH CEILING
TO EXTERIOR ELECTRICAL BOX
CMCM
CM
CM
CM
CMCM
CM
CM
CM
CM
CMCM
CM
CM
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
16 MAR 2011
DEMOLITION
A-3.0
HENRY
PLAN
DEMOLITION NOTES:
SCALE: 3/16"=1'-0"
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
1. Remove all existing interior electrical panels.
2. Remove all existing electrical wiring, outlets and light switches @ceiling and walls.
3. Remove all existing interior wall partitions including drywall and wood framing.
4. Remove all existing drywall @ceiling.
5. Remove all existing drywall and boards @walls.
6. Remove all existing interior and exterior light fixture (Please contact Mr. Paul Barker 78CEG/CEANP 478-327-8305 before removal).
7. Remove all existing HVAC system (to be recycled by Robins Recycling Center. Please call Mr. Art Ramsay 478-256-0627 for hauling).
8. Remove portion of existing wall and existing window framing, door framing and plywood in their entirety for installation of product deposit windows.
9. Remove all existing exterior wall board.
10. Remove portion of existing wall and existing window framing in their entirety for installation of new overhead door.
11. Remove portion of existing wall and existing window framing in their entirety for installation of new single hollow metal door and frame.
DEMOLITION PLAN
(Please contact Mr. Paul Barker 78CEG/CEANP 478-327-8305 before beginning demo process).
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
3 7
NOTE:
AN ONSITE ASBESTOS SURVEY HAS
BEEN PERFORMED. NO ASBESTOS IS
ANTICIPATED IN PROJECT.
12. Remove portion of existing wall and existing window framing in their entirety for installation of new double hollow metal doors, frame and exterior concrete pad.
9 13
13. Remove all of existing concrete pad @ south wall in its entirety. Remove all concrete pad debris and cleanup area after demo.
10'-4"16'-1"19'-10"16'-1"18'-2"16'12'
A B C D E F
4'-3"3'-7"8'-6"3'-7"8'-6"3'-7"8'-6"3'-7"8'-6"3'-7"8'-6"3'-7"8'-6"3'-7"10'-3"10'-3"3'-7"4'-3"
54'-3"
DOOR SCHEDULE
SYM SIZE TYPE QTY
1 3'-0"X7'-0" HOLLOW MTL SNGL DR & FRAME 1
2 (2) 3'-0"X6'-8" HOLLOW MTL DBL DR & FRAME 1
3 10'-0"X10'-0" ROLLING SERVICE DR, STL, MANUAL, 20 GAUGE 1
WINDOW SCHEDULE
SYM SIZE TYPE QTY
1 SEE A5.0 (OPTION-1) CUSTOM BUILT, WELDED, SEE SHEET A6.0 9
2 3'-0"X2'-0" (OPTION-2) ALUMINUM, COMMERCIAL GRADE, STOCK UNITS, SLIDING 18
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
C. COOK
07 FEB 2011
NEW
A-4.0
HENRY
FLOOR PLAN
NEW FLOOR PLAN SCALE: 3/16"=1'-0"
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
A A A
AAAAAA
S1.0
NEW 1 1/2" PVC DIRECT BURIED WATERLINE
TIE NEW WATERLINE
TO EXISTING
OPTION-1 10'X10'
CONCRETE PAD
S1.0
S1.0
OPTION-1
108'-6"
54'-3"
DOWN SPOUT SPACING. TYPICAL
10'
10'-1"
25'-4"
1'-4"
0'-4"
0'-6"
11'
1'-1"
11'
1'-1"
11'
1'-1"
11'
1'-1"
11'
0'-7"
11'
0'-7"
11' 4'-3" 4'-7"
4'-3" 11'
0'-6"
CARDBOARD
RECYCLING ASSISTANCE
CANSCANS GLASSGLASS PLASTIC-1PLASTIC-1 PLASTIC-2PLASTIC-2 NEWSPAPER NEWSPAPER MIXED PAPER MIXED PAPER WHITE PAPER WHITE PAPER
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
15 MAR 2011
PROPOSED
A-5.0
HENRY
EXTERIOR
ELEVATIONS
NEW NORTH ELEVATIONS SCALE: 3/16"=1'-0"EAST ELEVATION
WEST ELEVATIONS SCALE:3/16"-1'0" NEW SOUTH ELEVATIONS SCALE: 3/16"=1'-0"
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
SCALE:3/16"-1'0"
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
OPTION-1
METAL ROOF
NEW CONTINUOUS
ROOF VENT
EXISTING METAL ROOF VENTS TO
REMAIN. INSPECT AND REPAIR AREA
OF ROOF AT BASE OF ROOF VENTS AS
NEEDED TO PREVENT LEAKAGE.
INSTALL NEW
SECURITY FIXTURE
NEW GUTTER & DOWNSPOUT
D.S.-MAINTAIN POSITIVE SLOPE TO
EXTERIOR FOR PROPER DRAINAGE.
INSTALL NEW
SECURITY FIXTURE
INSTALL SPLASH BLOCK @ DOWNSPOUTS. ALL GUTTERS, D.S. &
SPLASH BLOCKS TO BE INSTALL SO AS TO DISPENSE RAINWATER
ON EAST, WEST AND SOUTH SIDE OF BUILDING ONLY TO REDUCE
TRIPPING HAZARD AT RECYCLE WINDOW WALL (NORTH WALL).
"RECYCLING ASSISTANCE"
WINDOW MUST BE INSTALLED IN
ACCORDANCE WITH ADA CODE.
LINE OF CEILING
LINE OF CEILING
LINE OF CEILING LINE OF CEILING
CEILING SUPPORT
BRACES BEYOND
CEILING SUPPORT
RAFTERS BEYOND
TYPICAL SPACING TO BE BASED ON
MANUFACTURER DIRECTIONS AND SHOULD
ACCOMMODATE LOCAL RAINFALL STATS.
ALL SIGNAGE TO BE
COMPLETED INHOUSE
10' WIDE MANUAL ROLLING
SERVICE DOOR.
METAL WALL PANEL (TYPICAL)
METAL WALL
PANEL (TYPICAL)
INSTALL METAL WALL PANELS
AND GUTTER SYSTEM IN A
MANNER THAT DOES NOT
PRODUCE SHARP EDGES AND/OR
CORNERS (TYPICAL)
OPTION-1
PROVIDE NEW STANDING SEAM
METAL ROOFING, FLASHING AND
FASTENERS ON PRESSURE TREATED
WOOD SHIMS OVER EXISTING
ASPHALT SHINGLE ROOFING AS
SPECIFIED BY THE MANUFACTURER.
OPTION-1
METAL ROOF
METAL WALL PANEL (TYPICAL)
CONCRETE PAD
HOLLOW METAL
DOORS
SS
WP
ELECTRICAL LEGEND
S
NEW ELECTRICAL PANEL
CONCEALED & UNCONCEALED WIRING
SINGLE POLE SWITCH
NEW 110 RECEPTACLE
NEW EXTERIOR LIGHT FIXTURE
S
WP NEW 110 WEATHERPROOF RECEPTACLE
DOUBLE POLE SWITCH
A
B W
R O
B
IN
S A
F B
G
A A
L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
C. COOK
22 MAR 2011
NEW
E-2.0
HENRY
ELECTRICAL &
NEW ELECTRICAL & LIGHTING PLAN SCALE: 3/16"=1'-0"
LIGHTING PLAN
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
NEW ELECTRICAL
PANEL
EXTERIOR LIGHTING
SECURITY LIGHT
ON TIMER
0'-312"
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
22 MAR 2011
SECTIONS
S-1.0
HENRY
TYPICAL WALL SECTION
SCALE:3/4"-1'0"
WALL SECTION AT WINDOW
SCALE: 3/4"=1'-0"
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
1/2" ANCHOR BOLT
EXISTING 2 BRICK COURSE
30"X30" RECYCLE DEPOSIT DOOR
GUTTERS & DOWNSPOUTS
EXISTING FOUNDATION SYSTEM
(PLEASE VERIFY ON SITE.)
STUD WALL (TYPICAL)
METAL
WALL PANEL
7\8" FURRING
CHANNELS
@ 24" O.C.
HORIZONTALLY
AIR INFILTRATION
BARRIER
(TYVEK BUILDING
PAPER OR EQUAL)
2" X 4"
EXISTING BASE PLATE & BRICK
COURSE (PLEASE VERIFY ON SITE.)
PROVIDE METAL CLOSURE
PANEL AND FLASHING AT
BOTTOM OF METAL WALL
PANELS TO ENSURE 6" MIN.
CLEARANCE FROM GRADE.
BUILDING SECTION
SCALE: 3/8"=1'-0"
CEILING SUPPORT
BRACES BEYOND.
SEE ELEVATIONS
FOR SPACING.
EXISTING WOOD
TRUSS SYSTEM. PLEASE
VERIFY ONSITE
(TYPICAL THROUGHOUT)
FINISHED FLOOR
(CONCRETE)
CEILING SUPPORT
BRACE, BEYOND.
SEE ELEVATIONS
FOR SPACING.
OSB
SHEATHING
NEW BUILDING
INSULATIONNEW BUILDING
INSULATION
ALUMINUM
FLASHING
PVC BASE
BOARD
PVC BASE
BOARD
FRP
(FIBERGLASS
REINFORCED
PLASTIC PANEL)
EXISTING 2"X4"
WOOD STUD
MOUNTING
SCREW
FLUSH MOULDING
FLUSH BEAD
AIR FILTRATION
BARRIER
OSB
SHEATHING
7/8" FURRING
CHANNELS
CORRUGATED
METAL WALL
PANEL (TYPICAL)
FRP & METAL PANEL SECTION
SCALE: 1"=1'-0"
11'-2" 0'-1"
4'-11"
11'
0'-2"
1'
0'-2"
4'-11"
2'-8" 2'-3" 1'-4" 2'-3"
0'-2" 0'-1"
0'-1"
0'-6"
0'-218"
0'-1"
0'-012"
0'-1"
0'-07 8"
0'-018"
Ø 0' -0
1 8
/8
7/8"
5 1/2"
/4
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
07 FEB 2011
PROPOSED
A-6.0
HENRY
EXTERIOR
ELEVATIONS
WINDOW SECTION
SCALE:1"-1'-0"
DEPOSIT WINDOW ELEVATION
SCALE: 1 1/2"=1'-0"
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
MTL END CAP DETAIL
SCALE: 1/2"=1'-0"
DETAIL
RECYCLE WINDOW ASSEMBLY
NOT TO SCALE
MOUNTING SCREW
DOUBLE
HEADER
2 - 2" X 6"
EXTERIOR
SIDING
BUILDING
PAPER
TRIM
1" X 2"
1" X 6"
30" X 30"
POLYURETHANE
DOOR
(PROVIDED BY
CLIENT)
MTL
WINDOW
ASSEMBLY
(SECTION)
7/8" FURRING
CHANNELS
@ 24" O.C.
HORIZONTALLY
AIR INFILTRATION
BARRIER. (TYVEK
BUILDING PAPER OR
EQUAL)
OSB SHEATHING
METAL WALL
PANEL
EXISTING STUDS
@24" O.C. (PLEASE
VERIFY ONSITE)
FRP PANEL
(FIBERGLASS
REINFORCED
PLASTIC PANEL)
FOR WINDOW
ASSEMBLY
ALUM.
SILL
ALUM.
FLASHING
(BULLNOSE)
1'-6"
" 0'-5"
0'-11"
3'-4"
" 11'
0'-1"
4'-10" 1' 4'-11"
2'-5"
4'-7"
0'-4"4'
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
07 FEB 2011
SECTIONS
A-7.0
HENRY
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
GUTTER & DOWNSPOUT DETAIL
SCALE: 6"=1'-0"
WINDOW DETAIL (DOORS)
SCALE:1"-1'0"1
SLOT DETAIL
SCALE:3/4"-1'0"2
MAINTAIN
POSITIVE SLOPE
TO EXTERIOR
FOR PROPER
DRAINAGE.
INSTALL SPLASH BLOCK @ DOWNSPOUTS. ALL
GUTTERS, D.S. & SPLASH BLOCKS TO BE
INSTALLED SO AS TO DISPENSE RAINWATER
ON EAST, WEST AND SOUTH SIDE OF
BUILDING ONLY, TO REDUCE TRIPPING
HAZARD AT RECYCLE WINDOW WALL
(NORTH WALL).
NOTE:
NEW GUTTER & DOWNSPOUT SYSTEM
SHOULD BE ADEQUATE ENOUGH TO
ACCOMMODATE AND MAINTAIN RAINFALL
BASED ON LOCAL RAINFALL DATA. GUTTER &
DOWNSPOUT SYSTEM TO BE INSTALLED IN
ACCORDANCE TO MANUFACTURER'S
INSTRUCTIONS IN ORDER TO ASSURE PROPER
WARRANTY AND PERFORMANCE.
2'-3"
0'-2"
" 7
A
B W
R O
B
IN
S A
F B
G
A
C. COOK
24 MAR 2011
SECTIONS
I-1.0
HENRY
A L T
E R
B L D
G
R E C
Y C
L
IN
G C
O L L E C
T
IO
N F
A C
IL
IT
Y
78 CEG/CEANP
BLDG 359
ROBINS AFB, GA
478-472-8409
INTERIOR ELEVATION @ RECYCLE DEPOSIT WALL
SCALE: 1/2"=1'-0"
FRP
(FIBERGLASS
REINFORCED
PLASTIC PANEL)
FLUSH MOULDING
TILT TRUCK
@ RECYCLE
DEPOSIT WALL
FLUSH MOULDING
DEPOSIT WINDOW
FINISHED SILL
DEPOSIT WINDOW
HEAD
2" TRIM
File details come from the government source that posted it. Updated .