Amendment 3 - Salient Characteristics Memo_Generator monitoring system 46_Redacted.pdf

PDF 294 KB Posted

Attached to
Generator Monitoring System
Solicitation number
F3N0525133A007
Issued by

About this file

This is a Department of the Air Force memorandum from the 86th Airlift Wing (USAFE) dated 15 September 2025, detailing salient characteristics for a generator monitoring system. The technical specifications include requirements for 46 generator output systems with 1 shop receiver, featuring a 1 sensor system per generator with SMS-enabled device communication over LTE or higher network.

Key system requirements include: SMS capability to simultaneously monitor 5 sensor inputs per generator, a central monitoring system that can receive all generator site system inputs, comprehensive software and licenses for system notifications, and plug-and-play hardware/software integration. The document also specifies installation of all sensors with functional checks and requires a minimum of two personnel trained on system operation upon completion. The memorandum is addressed to 700 CONS (likely a contracting squadron) and appears to be outlining technical specifications for a monitoring system procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .