Site_Visit_Q A.pdf
PDF 6 KB Posted
- Attached to
- 693 ISS Fiber Optic Install
- Solicitation number
- F3N0435029AC01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52.252-2.pdf | ||
| 252.229-7001_Alt_I.pdf | ||
| 252.203-7999.pdf | ||
| Performance_Work_Statement_(Jan_2015).pdf | ||
| 5352.223-9001.pdf | ||
| 52.212-5.pdf | ||
| 252.203-7998.pdf | ||
| 252.209-7992.pdf | ||
| 252_232-7006_WAWF_Payment_Instructions_(May2013).pdf | ||
| Evaluation_Criteria.pdf | ||
| 5352.223-9000.pdf | ||
| 52.252-1.pdf | ||
| Combined_Synopsis_ _Solicitation.pdf | ||
| 252.225-7043.pdf | ||
| 52.212-3_Alt_I.pdf | ||
| 5352.201-9101.pdf | ||
| Addendum_52.212-1.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Q&A
The following questions were brought up during the site visit on February 19, 2015:
1) Is there enough rack space in Building 530 to terminate the fiber connection?
Answer: Yes, there is enough rack space in Building 530 to terminate the fiber connection.
2) Where will the fiber connection terminate in Building 500?
Answer: In building 500, the 48-port patch panel will be placed in Room 104, rack 7709.
3) Is another equipment rack needed in Building 500?
Answer: No, the new fiber connection will terminate in rack 7709, Room 104.