Site_Visit_Q A.pdf

PDF 6 KB Posted

Attached to
693 ISS Fiber Optic Install
Solicitation number
F3N0435029AC01
Issued by

View the file

Other files

File Type Posted
52.252-2.pdf PDF
252.229-7001_Alt_I.pdf PDF
252.203-7999.pdf PDF
Performance_Work_Statement_(Jan_2015).pdf PDF
5352.223-9001.pdf PDF
52.212-5.pdf PDF
252.203-7998.pdf PDF
252.209-7992.pdf PDF
252_232-7006_WAWF_Payment_Instructions_(May2013).pdf PDF
Evaluation_Criteria.pdf PDF
5352.223-9000.pdf PDF
52.252-1.pdf PDF
Combined_Synopsis_ _Solicitation.pdf PDF
252.225-7043.pdf PDF
52.212-3_Alt_I.pdf PDF
5352.201-9101.pdf PDF
Addendum_52.212-1.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Q&A

The following questions were brought up during the site visit on February 19, 2015:

1) Is there enough rack space in Building 530 to terminate the fiber connection?

Answer: Yes, there is enough rack space in Building 530 to terminate the fiber connection.

2) Where will the fiber connection terminate in Building 500?

Answer: In building 500, the 48-port patch panel will be placed in Room 104, rack 7709.

3) Is another equipment rack needed in Building 500?

Answer: No, the new fiber connection will terminate in rack 7709, Room 104.