APFIT-FYXX-X-Quad-Chart_Project-Name_YYYYMMDD.pptx

PPTX presentation 79 KB Posted

Attached to
Project Iron Sentry: KTO Joint Point Defense Modernization Federal contract opportunity
Solicitation number
F3J6AF-27-SS001
Issued by
Department of the Air Force

About this file

This file is a Quad Chart template for the Accelerate the Procurement and Fielding of Innovative Technologies (APFIT) program. The template provides a standardized format for documenting proposed projects seeking APFIT funding and is not itself a solicitation requiring products or services.

The template instructs submitters to complete sections including: Project Description and Warfighter Benefit; Schedule with key milestones; Key Participants identifying the Project Owner, Industry Partner, Category designation, and Sustainment Partner; and Key Deliverables aligned to procurement objectives. Submitters must also provide a Transition and Sustainment Strategy, funding table broken down by fiscal year with color of money designations (RDT&E, PROC, O&M, etc.), and points of contact for the Project Lead and R&E representative. Critical submission requirements specify that responses must be submitted in original Microsoft PowerPoint format only—not as PDF or non-editable images. The template is designed to support market research and evaluation of innovative technology solutions within the APFIT program framework, with all information required to be current as of a specified submission date.

View the file

Other files for this federal contract opportunity

Other files attached to Project Iron Sentry: KTO Joint Point Defense Modernization, newest first.
File Type Posted
APFIT-FYXX-X-Submission-Briefing_YYYMMDD.pptx PPTX presentation
APFIT-FYXX-X-LoA-Template_Project-Name_YYYYMMDD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Description:

Describe what is being procured and how the project meets the need described above.

Benefit to Warfighter:

Describe the user group and how this capability improves warfighter CONOPS.

Schedule:

E.g. Production ramp-upQX FYXX
E.g. Initial delivery of X systemsQX FYXX
E.g. Achieve full rate productionQX FYXX
E.g. Initial Service purchase of X systemsQX FYXX

Key Participants:

Project Owner: (Gov’t org leading project execution) Industry Partner: (Name of company) Category: (Small business, Non-Traditional, Under $400M) Sustainment Partner: (DoW Program, can be the same as project owner)

Key Deliverables (Match to Procurement Overview slide in briefing):

E.g. 10 aircraft kits (XX% of total need) Each kit includes 2 aircraft, 1 ground station, and 1 maintenance kit E.g. Level 3 Technical Data Package

Transition & Sustainment Strategy: (Transition plan and future purchase plan) E.g. Transition to Program of Record XYZ; Component purchase via NSN, etc.

Insert brief project tagline As of: MM/DD/YYYY Project Title Insert Project Image Name, e-mail, phone Name of APFIT PM, e-mail, phone

Funding ($M)FYXXFYXXFYXXFYXXFYXX
APFIT (PROC)-X.XXX---
Other Partner (Color)X.XXXX.XXXX.XXXX.XXXX.XXX
Other Partner (Color)X.XXXX.XXXX.XXXX.XXXX.XXX
Number of Units ProcuredXXXX

(Add classification/distribution statement) (Add classification)

PL POC:

R&E POC:

Template:27-1 Quad Chart Instructions and Notes:

Fill out the template as formatted. DO NOT submit a non-editable picture as the Quad Chart.

Turn in the Quad Chart in its original MS PowerPoint format. DO NOT turn in a PDF version.

For the funding table, please provide the APFIT funding ask in the second fiscal year column; provide any and all past funding in the fiscal year column to the left of it, as well as any and all POM’d, planned, and/or proposed funding in the columns to the right. Add columns for additional fiscal years and rows for additional funding partners as needed. Lastly, provide the color of money (i.e. RDT&E, PROC, O&M, etc.) for each line of funding in the table.

Please provide the Project Lead POC info at the bottom of the slide (name, e-mail, phone). An APFIT representative will communicate with this POC throughout the selection process for fact-finding.

image1.png image2.png

File details come from the government source that posted it. Updated .