Questions_and_Answers_820_RHS_input_2.docx
DOCX document 18 KB Posted
- Attached to
- Install of OSP and ISP
- Solicitation number
- F3GHBA8340AW01
About this file
Responses to Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Determination.docx | DOCX document | |
| RFQ.docx | DOCX document | |
| Questions_and_Answers_820_RHS_input_2.docx | DOCX document | |
| Pages_from_90__COAT_Classroom.pdf | ||
| NC_2710_approved_9_Feb_2017.pdf | ||
| Questions_and_Answers_820_RHS_input.docx | DOCX document | |
| SOW_for_OSP-ISP_B10571_(updated).pdf | ||
| Site_Visit.docx | DOCX document | |
| RFQ.docx | DOCX document | |
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
| Q1. | In attached SOW, page 5 drawing – is conduit already in place for all cabling marked in yellow or new conduit/trenching/boring will be required to run new cabling?? |
| A1. | All conduits are in place for the contractor to install the new copper and fiber from the classroom comm room to the HH 10150-A. So, there is no need for new conduit/trenching/boring to run new cabling. |
| Q2. | Does the communication room require UPS? |
| A2. | No |
| Q3. | 1.2.4 Splice into 36 Strand SMFO Labeled 48 Strand SMFO, Count 73-120:B10301 to HH10150-A in MH 601 into 144 Strand SMFO in MH 601. Question: This MH and this splice where not a part of the site visit on 24 January 2019. Has this been removed for the SOW? |
A3. Should read Splice new 12 strand fiber into orange buffer tube of 48 Strand SMFO located in HH10150-A.
HH was visited on 24 January 2019 during job walk. HH 10150-A is the double hinged door across the road from classroom that has the fiber and copper splice cases.
Q4. 1.4.1 Install Comm rack in the room identified in drawings. Question: What are the required dimensions for the wall mounted dual locking cabinet?
A4. A4. Install a dual locking wall mounted cabinet 48”H X 24”W X 26”D.
Depth needs to be minimum 26” do to new network switches being longer.
| Q5. | Will the Govt. provide a too scale drawing of B10571? |
| A5. | Yes, see attached floor plan. |
| Q6. | Copper splice case required to be encapsulant? Is the current case encapsulant? |
A6. The copper splice case needs to be encapsulated. No current case is not encapsulated.
| Q7. | Statement of Work Item 4: References design pertaining to As-builts and Post Construction design only. Is Pre-Construction Design by BICSI Engineer part of contractor scope? |
| A7. | All “pre-construction” design has been provided. |
| Q8. | Statement of Work Item 3: Calls for all work to be performed by BICSI Certified Contractor. Does GC require BICSI Certification or can Key Personnel maintain the BICSI certifications? |
| A8. | As long as there is partnership with a BICSI certified company and the work conforms to BICSI standards. |
| Q9. | Section 1.2.5, is the contractor to provide the 25 pair copper cable? Is it a CAT 3, 5 or 6 cable? |
A9. Contractor is to provide/install a CAT 3 25 pair OSP cable from the facility communications room to HH10150-A.
Q10. Section 1.2.6, is the contractor to provide a 110 punch-down block panel to terminate the 25 pair?
A10. Yes contractor must provide/install a 110 building entrance terminal with protection modules for 25 pair OSP cable. Ref to NC2710 Q11. Section 1.2.7, please clarify from which location to cross connect?
A11. Contractor to terminate 25 pair ISP/house cable from BET to 24 patch panel inside cabinet. Have contractor ref to NC2710 page 27 Q12. Section 1.2.8, is splicing 25 pair a requirement or any alternatives can be used?
A12. Yes splicing 25 pair is required and there is no alternative.
Contractor to splice 25 pair copper in HH10150-A to in existing feeder/trunk cable.
Contractor needs to splice into orange binder group of existing 100 pair copper cable.
| Q13. | What is the part number for the 3 cell max? |
| A13. | MX-C3456 |