This document is a Performance Work Statement (PWS) for a temporary portable chiller rental to provide cooling to the Nellis Air Force Base's fitness center while the existing 325-ton chiller is being repaired. The PWS outlines the scope of work, salient characteristics of the required chiller unit, location details, environmental requirements, contractor personnel specifications, quality assurance, and performance period.
The related federal contract opportunity is a combined synopsis/solicitation for the chiller rental service, with a solicitation number of F3G3CE4089AW01. The opportunity is for a minimum 200-ton air or water-cooled portable chiller to be installed and operated for 6 months. Questions are due on April 19, 2024, and offers are due on April 26, 2024. The award will be made to the responsible offeror who submits a technically acceptable quote with the lowest total evaluated price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK
STATEMENT
FOR
Building 1705
NELLIS AIR FORCE BASE, NEVADA
02 Apr 2024
OFFICE OF THE BASE CIVIL ENGINEER
NELLIS AIR FORCE BASE, NEVADA
1. OVERVIEW: The existing nominal 325-ton Carrier chiller (M/N 30X WB3256--FRXB, serial number 1913Q21036) that provides cooling to the Nellis Air Force Base’s fitness center (Building 1705) is inoperable due to condenser tube bundle failure. Condenser tube repair is a challenging and expensive process. The 99 CES has a delayed project to retube the condenser in order to bring the chiller back to 100% operation. The demand for cooling increases significantly during the months of April through late November. In order to continue normal operations while the system is being repaired, a temporary portable chiller is required to meet the cooling needs of the facility during the repairs.
2. SCOPE: The purpose of the contract is to provide a temporary, minimum 200-ton air or water cooled portable low temperature chiller with all the necessary Camlock hoses, associated fittings, and electrical power cables that is compatible to connect the portable chiller to the existing building’s chilled water supply and return piping as well as power. The Contractor shall install all water fittings, hoses and electrical connections from the portable chiller to the building. The work to be accomplished under this delivery order requires the contractor to furnish all equipment, materials, transportation, administration, supervision, and everything else necessary to provide the temporary chiller for a period of six months. Any damages caused by the rental equipment during installation and operation will require a complete repair by the Contractor.
3. SALIENT CHARACTERISTICS:
Louvered condenser coil guards Suitable for high ambient operation up to 125°F with high ambient option UL/cUL listed to US and Canadian safety standard ASHRAE 90.1 compliance ANSI/NFPA Standard 70 Compatible with existing 500 AMP building service connection Main power on indicator light (green) Master on/off switch Common trouble alarm terminal Integrated main power wiring with Cam-Lock electrical connections and associated wiring Single point 460V/3PH/60HZ power application power connection for chiller/pump package Connections: three (3) at series 16 male per conductor Minimum Circuit Ampacity: 425 Maximum Overcurrent Protection: 500 Evaporator Flow: Maximum water side pressure 150 PSIG, Maximum Refrigerant Side Pressure
235 PSIG, Minimum Chilled Water Flow Rate 400 GPM, Maximum Chilled Water Flow Rate 1250
GPM
Pump: Motor 40 HP, End suction configuration, variable speed (VFD installed), 1200 gpm, total discharge head 100 ft
4. LOCATION: The project site is located at Nellis Air Force Base, Nevada. The Main Base is located approximately 9 miles north of downtown Las Vegas on Highway US 93 (Las Vegas Blvd.). NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project location is on the Main Base in Building 1705, the Base Gymnasium, located at the intersection of Free and Chambers, NAFB, NV, 89084.
5. ENVIRONMENTAL PROTECTION: All work and contractor’s operations shall comply with the requirements imposed by all applicable Federal, State, local and NAFB laws, regulations, codes, and permits (including NAFB Management Plan12) concerning environmental protection.
6. CONTRACTOR PERSONNEL: The Contractor’s personnel shall conduct themselves in a professional manner. All Contractor personnel requiring access to the base to perform the work shall have a minimum of two (2) forms of non-expired identification and/or documentation to get a base pass from the Visitors’ Center. Documents include: a Real ID driver’s license, passport, social security card, vehicle registration, vehicle insurance, and a clean police record. Acquiring a base pass can take 1-2 weeks, therefore, all base pass requests must be submitted ahead of time to allow pass approval for all Contractors requiring entry. All Contractor’s personnel shall not have any substances or paraphernalia that are considered to be illegal on a federal property on their persons or their vehicles prior to entering the base.
7. QUALITY ASSURANCE: The government, through the 99 CES representative, will periodically evaluate the contractor’s performance in accordance with the specific contract performance requirements.
8. WORKING HOURS: Standard working hours are from 6:30 A.M. to 3:30 P.M. Monday through Friday excluding all Federal Holidays and the day after Thanksgiving.
9. DELIVERABLES: The Contractor shall perform preoperational checks as week as monthly operational checks on all equipment installed and shall ensure that if it is a requirement for the purpose of warranty. Any defects or malfunction which may arise with the equipment throughout the duration of the operational period shall be promptly repaired by the Contractor, including any damages done to the NAFB property due to such defects and malfunction. The first day of the contract shall include a fully functioning system that is in place at the requested location and is turned on and connected to building 1705.
10. GENERAL CONDITIONS: All work must be in compliance with and conform to industry standards and applicable manufacturer’s recommendations. All electrical wiring, connections, and structural designs shall be installed IAW latest version of the NFPA 70 National Electric Code (NEC), Uniform Mechanical Code, and NFPA 54, ASME CSD-1 (Controls & Safety Devices). All work must be in compliance with the International Building Code (IBC). 2009 Edition, DoD Unified Facilities Criteria Standards (UFC) Unified Plumbing Code (UPC) and all accepted industry practices. At the completion of the project, the system should be 100% operational.
11. PERFORMANCE PERIOD: The total proposed performance period for this contract is 180 calendar days.