5-20250807 Bid Tabulation.pdf
PDF 47 KB Posted
- Attached to
- Mt. Rock and S.R. 997 Water Main Replacement
- Solicitation number
- US.194237
- Issued by
- Fulton County, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Bidding Documents.pdf | ||
| 4-00 91 13.1 - Addendum No. 1.pdf | ||
| 3-Project Manual.pdf | ||
| 1-Bid Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Items Unit of Measure Quantity Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost
#1-1
12" Ductile Iron Water Main, complete in place, including testing.
Linear Feet 11265 $ 193 $ 2,174,145.0 $ 181 $ 2,038,965.0 $ 171 $ 1,926,315.0 $ 187 $ 2,106,555.0 $ 180 $ 2,027,700.0 $ 190 $ 2,140,350.0 $ 230 $ 2,590,950.0 $ 195 $ 2,196,675.0 $ 228 $ 2,568,420.0 $ 250 $ 2,816,250.0 $ 260 $ 2,928,900.0
#1-2
Installation of 12" Ductile Iron
Water Main provided by Owner, complete in place, including testing and transportation of pipe to the job site.
Linear Feet 1300 $ 118 $ 153,400.0 $ 106 $ 137,800.0 $ 71 $ 92,300.0 $ 275 $ 357,500.0 $ 130 $ 169,000.0 $ 97 $ 126,100.0 $ 160 $ 208,000.0 $ 100 $ 130,000.0 $ 136 $ 176,800.0 $ 180 $ 234,000.0 $ 165 $ 214,500.0
#1-3
Installation of 8" Ductile Iron
Water Main provided by Owner, complete in place, including testing and transportation of pipe to the job site.
Linear Feet 901 $ 80 $ 72,080.0 $ 145 $ 130,645.0 $ 108 $ 97,308.0 $ 85 $ 76,585.0 $ 180 $ 162,180.0 $ 151 $ 136,051.0 $ 200 $ 180,200.0 $ 125 $ 112,625.0 $ 64 $ 57,664.0 $ 140 $ 126,140.0 $ 165 $ 148,665.0
#1-4
6" Ductile Iron Water Main, complete in place, including testing.
Linear Feet 110 $ 100 $ 11,000.0 $ 120 $ 13,200.0 $ 202 $ 22,220.0 $ 98 $ 10,780.0 $ 180 $ 19,800.0 $ 598 $ 65,780.0 $ 190 $ 20,900.0 $ 200 $ 22,000.0 $ 177 $ 19,470.0 $ 160 $ 17,600.0 $ 175 $ 19,250.0
#1-5 12" 90-Degree Bend, complete in place.
Each 1 $ 1,300.0 $ 1,300.0 $ 1,598.0 $ 1,598.0 $ 1,205.0 $ 1,205.0 $ 1,100.0 $ 1,100.0 $ 1,300.0 $ 1,300.0 $ 2,294.0 $ 2,294.0 $ 1,000.0 $ 1,000.0 $ 1,580.0 $ 1,580.0 $ 1,700.0 $ 1,700.0 $ 2,950.0 $ 2,950.0 $ 1,200.0 $ 1,200.0
#1-6 12" 45-Degree Bend, complete in place.
Each 4 $ 1,100.0 $ 4,400.0 $ 1,453.0 $ 5,812.0 $ 1,047.0 $ 4,188.0 $ 900 $ 3,600.0 $ 1,200.0 $ 4,800.0 $ 2,002.0 $ 8,008.0 $ 1,000.0 $ 4,000.0 $ 1,410.0 $ 5,640.0 $ 1,528.0 $ 6,112.0 $ 2,250.0 $ 9,000.0 $ 1,000.0 $ 4,000.0
#1-7 12" 22.5-Degree MJ Bend, complete in place.
Each 1 $ 1,000.0 $ 1,000.0 $ 1,368.75 $ 1,368.75 $ 955 $ 955 $ 895 $ 895 $ 1,000.0 $ 1,000.0 $ 1,946.0 $ 1,946.0 $ 1,000.0 $ 1,000.0 $ 1,310.0 $ 1,310.0 $ 1,434.0 $ 1,434.0 $ 2,250.0 $ 2,250.0 $ 1,000.0 $ 1,000.0
#1-8 8" 22.5-Degree MJ Bend, complete in place.
Each 1 $ 500 $ 500 $ 760.75 $ 760.75 $ 471 $ 471 $ 850 $ 850 $ 610 $ 610 $ 1,084.0 $ 1,084.0 $ 600 $ 600 $ 800 $ 800 $ 920 $ 920 $ 1,750.0 $ 1,750.0 $ 900 $ 900
#1-9 6" 90-Degree Bend, complete in place.
Each 6 $ 10 $ 60 $ 601.25 $ 3,607.5 $ 384 $ 2,304.0 $ 350 $ 2,100.0 $ 700 $ 4,200.0 $ 766 $ 4,596.0 $ 600 $ 3,600.0 $ 705 $ 4,230.0 $ 925 $ 5,550.0 $ 1,500.0 $ 9,000.0 $ 600 $ 3,600.0
#1-10 12" x 12" MJ Tee, complete in place.
Each 1 $ 1,800.0 $ 1,800.0 $ 2,163.5 $ 2,163.5 $ 1,642.0 $ 1,642.0 $ 1,450.0 $ 1,450.0 $ 1,800.0 $ 1,800.0 $ 3,662.0 $ 3,662.0 $ 1,400.0 $ 1,400.0 $ 2,040.0 $ 2,040.0 $ 2,161.0 $ 2,161.0 $ 6,000.0 $ 6,000.0 $ 2,000.0 $ 2,000.0
#1-11 12" x 8" MJ Tee, complete in place.
Each 6 $ 1,400.0 $ 8,400.0 $ 1,851.25 $ 11,107.5 $ 1,301.0 $ 7,806.0 $ 1,100.0 $ 6,600.0 $ 1,400.0 $ 8,400.0 $ 2,835.0 $ 17,010.0 $ 1,200.0 $ 7,200.0 $ 1,680.0 $ 10,080.0 $ 1,795.0 $ 10,770.0 $ 5,300.0 $ 31,800.0 $ 1,800.0 $ 10,800.0
#1-12 12" x 6" MJ Tee, complete in place.
Each 7 $ 1,300.0 $ 9,100.0 $ 1,787.75 $ 12,514.25 $ 1,232.0 $ 8,624.0 $ 1,000.0 $ 7,000.0 $ 1,400.0 $ 9,800.0 $ 2,740.0 $ 19,180.0 $ 1,200.0 $ 8,400.0 $ 1,610.0 $ 11,270.0 $ 1,722.0 $ 12,054.0 $ 4,950.0 $ 34,650.0 $ 1,700.0 $ 11,900.0
#1-13 8" x 8" Tee, complete in place.
Each 1 $ 850 $ 850 $ 1,222.0 $ 1,222.0 $ 795 $ 795 $ 850 $ 850 $ 700 $ 700 $ 1,800.0 $ 1,800.0 $ 1,000.0 $ 1,000.0 $ 1,150.0 $ 1,150.0 $ 1,143.0 $ 1,143.0 $ 4,750.0 $ 4,750.0 $ 1,500.0 $ 1,500.0
#1-14 8" x 6" MJ Tee, complete in place.
Each 1 $ 750 $ 750 $ 1,131.0 $ 1,131.0 $ 695 $ 695 $ 700 $ 700 $ 700 $ 700 $ 1,800.0 $ 1,800.0 $ 800 $ 800 $ 1,040.0 $ 1,040.0 $ 1,155.0 $ 1,155.0 $ 4,450.0 $ 4,450.0 $ 1,400.0 $ 1,400.0
#1-15 12" x 8" MJ Reducer, complete in place.
Each 1 $ 800 $ 800 $ 1,197.25 $ 1,197.25 $ 768 $ 768 $ 710 $ 710 $ 790 $ 790 $ 1,700.0 $ 1,700.0 $ 800 $ 800 $ 1,115.0 $ 1,115.0 $ 1,462.0 $ 1,462.0 $ 4,750.0 $ 4,750.0 $ 950 $ 950
#1-16 12" x 6" MJ Reducer, complete in place.
Each 1 $ 750 $ 750 $ 1,155.75 $ 1,155.75 $ 722 $ 722 $ 665 $ 665 $ 780 $ 780 $ 1,500.0 $ 1,500.0 $ 600 $ 600 $ 1,065.0 $ 1,065.0 $ 1,414.0 $ 1,414.0 $ 2,500.0 $ 2,500.0 $ 950 $ 950
#1-17 8" x 6" MJ Reducer, complete in place.
Each 4 $ 400 $ 1,600.0 $ 698 $ 2,792.0 $ 403 $ 1,612.0 $ 450 $ 1,800.0 $ 370 $ 1,480.0 $ 950 $ 3,800.0 $ 600 $ 2,400.0 $ 730 $ 2,920.0 $ 961 $ 3,844.0 $ 2,000.0 $ 8,000.0 $ 800 $ 3,200.0
#1-18 8" x 4" MJ Reducer, complete in place.
Each 2 $ 400 $ 800 $ 670 $ 1,340.0 $ 372 $ 744 $ 450 $ 900 $ 360 $ 720 $ 950 $ 1,900.0 $ 400 $ 800 $ 700 $ 1,400.0 $ 931 $ 1,862.0 $ 1,750.0 $ 3,500.0 $ 700 $ 1,400.0
#1-19 6" x 2" MJ Reducer, complete in place.
Each 1 $ 250 $ 250 $ 676.25 $ 676.25 $ 244 $ 244 $ 500 $ 500 $ 351.6 $ 351.6 $ 550 $ 550 $ 400 $ 400 $ 560 $ 560 $ 428 $ 428 $ 1,200.0 $ 1,200.0 $ 650 $ 650
#1-20 12" MJ Coupling, complete in place.
Each 1 $ 1,000.0 $ 1,000.0 $ 1,434.75 $ 1,434.75 $ 919 $ 919 $ 650 $ 650 $ 2,400.0 $ 2,400.0 $ 1,564.0 $ 1,564.0 $ 600 $ 600 $ 7,025.0 $ 7,025.0 $ 1,396.0 $ 1,396.0 $ 2,000.0 $ 2,000.0 $ 900 $ 900
#1-21 6" MJ Coupling, complete in place.
Each 5 $ 300 $ 1,500.0 $ 919.5 $ 4,597.5 $ 357 $ 1,785.0 $ 450 $ 2,250.0 $ 1,020.0 $ 5,100.0 $ 620 $ 3,100.0 $ 400 $ 2,000.0 $ 3,405.0 $ 17,025.0 $ 592 $ 2,960.0 $ 1,200.0 $ 6,000.0 $ 500 $ 2,500.0
#1-22 4" MJ Coupling, complete in place.
Each 2 $ 250 $ 500 $ 831.25 $ 1,662.5 $ 261 $ 522 $ 450 $ 900 $ 1,600.0 $ 3,200.0 $ 553 $ 1,106.0 $ 400 $ 800 $ 2,710.0 $ 5,420.0 $ 1,065.0 $ 2,130.0 $ 800 $ 1,600.0 $ 400 $ 800
#1-23 2" MJ Coupling, complete in place.
Each 1 $ 200 $ 200 $ 1,130.25 $ 1,130.25 $ 140 $ 140 $ 300 $ 300 $ 1,400.0 $ 1,400.0 $ 245 $ 245 $ 300 $ 300 $ 600 $ 600 $ 428 $ 428 $ 400 $ 400 $ 500 $ 500
#1-24 8" MJ Cap, complete in place.
Each 1 $ 300 $ 300 $ 588.25 $ 588.25 $ 283 $ 283 $ 350 $ 350 $ 350 $ 350 $ 490 $ 490 $ 500 $ 500 $ 3,515.0 $ 3,515.0 $ 974 $ 974 $ 500 $ 500 $ 350 $ 350
#1-25 Thrust Block, complete in place.
Each 21 $ 50 $ 1,050.0 $ 509 $ 10,689.0 $ 1,194.0 $ 25,074.0 $ 200 $ 4,200.0 $ 130 $ 2,730.0 $ 220 $ 4,620.0 $ 1,000.0 $ 21,000.0 $ 245 $ 5,145.0 $ 437 $ 9,177.0 $ 600 $ 12,600.0 $ 400 $ 8,400.0
#1-26 12" Gate Valve with Valve Box, complete in place.
Each 18 $ 4,700.0 $ 84,600.0 $ 5,561.0 $ 100,098.0 $ 5,196.0 $ 93,528.0 $ 4,300.0 $ 77,400.0 $ 5,040.0 $ 90,720.0 $ 5,151.0 $ 92,718.0 $ 4,500.0 $ 81,000.0 $ 5,060.0 $ 91,080.0 $ 6,239.0 $ 112,302.0 $ 6,250.0 $ 112,500.0 $ 5,500.0 $ 99,000.0
#1-27 8" Gate Valve with Valve Box, complete in place.
Each 9 $ 3,000.0 $ 27,000.0 $ 3,059.75 $ 27,537.75 $ 2,677.0 $ 24,093.0 $ 3,800.0 $ 34,200.0 $ 3,000.0 $ 27,000.0 $ 2,810.0 $ 25,290.0 $ 2,200.0 $ 19,800.0 $ 2,865.0 $ 25,785.0 $ 3,287.0 $ 29,583.0 $ 4,000.0 $ 36,000.0 $ 4,000.0 $ 36,000.0
#1-28 6" Gate Valve with Valve Box, complete in place.
Each 8 $ 1,800.0 $ 14,400.0 $ 2,141.75 $ 17,134.0 $ 1,900.0 $ 15,200.0 $ 3,200.0 $ 25,600.0 $ 1,674.0 $ 13,392.0 $ 1,940.0 $ 15,520.0 $ 1,600.0 $ 12,800.0 $ 2,030.0 $ 16,240.0 $ 2,285.0 $ 18,280.0 $ 3,750.0 $ 30,000.0 $ 3,000.0 $ 24,000.0
#1-29 12" Tapping Sleeve with Valve, complete in place.
Each 1 $ 12,836.0 $ 12,836.0 $ 21,262.25 $ 21,262.25 $ 14,460.0 $ 14,460.0 $ 17,392.0 $ 17,392.0 $ 21,290.5 $ 21,290.5 $ 17,050.0 $ 17,050.0 $ 13,000.0 $ 13,000.0 $ 16,415.0 $ 16,415.0 $ 10,844.0 $ 10,844.0 $ 15,000.0 $ 15,000.0 $ 25,000.0 $ 25,000.0
#1-30 8" Tapping Sleeve with Valve, complete in place.
Each 2 $ 8,000.0 $ 16,000.0 $ 14,126.0 $ 28,252.0 $ 8,130.0 $ 16,260.0 $ 9,442.0 $ 18,884.0 $ 11,400.0 $ 22,800.0 $ 10,250.0 $ 20,500.0 $ 9,500.0 $ 19,000.0 $ 9,790.0 $ 19,580.0 $ 10,152.0 $ 20,304.0 $ 14,900.0 $ 29,800.0 $ 20,000.0 $ 40,000.0
#1-31 3/4" Service Line, complete in place.
Linear Feet 635 $ 110 $ 69,850.0 $ 60 $ 38,100.0 $ 77 $ 48,895.0 $ 65 $ 41,275.0 $ 102 $ 64,770.0 $ 190 $ 120,650.0 $ 60 $ 38,100.0 $ 125 $ 79,375.0 $ 139 $ 88,265.0 $ 160 $ 101,600.0 $ 195 $ 123,825.0
#1-32 Directional Bore 3/4" Service
Line, complete in place.
Linear Feet 264 $ 10 $ 2,640.0 $ 100.25 $ 26,466.0 $ 123 $ 32,472.0 $ 80 $ 21,120.0 $ 140 $ 36,960.0 $ 97 $ 25,608.0 $ 60 $ 15,840.0 $ 118 $ 31,152.0 $ 334 $ 88,176.0 $ 175 $ 46,200.0 $ 115 $ 30,360.0
#1-33 2" Directional Bore 3/4" Service
Line, complete in place.
Linear Feet 1100 $ 10 $ 11,000.0 $ 51.75 $ 56,925.0 $ 134 $ 147,400.0 $ 115 $ 126,500.0 $ 150 $ 165,000.0 $ 53 $ 58,300.0 $ 80 $ 88,000.0 $ 120 $ 132,000.0 $ 181 $ 199,100.0 $ 180 $ 198,000.0 $ 95 $ 104,500.0
#1-34 3/4" Service Connection, complete in place.
Each 73 $ 3,000.0 $ 219,000.0 $ 1,578.0 $ 115,194.0 $ 667 $ 48,691.0 $ 810 $ 59,130.0 $ 1,730.0 $ 126,290.0 $ 790 $ 57,670.0 $ 1,000.0 $ 73,000.0 $ 2,460.0 $ 179,580.0 $ 715 $ 52,195.0 $ 2,200.0 $ 160,600.0 $ 2,500.0 $ 182,500.0
Joao & Bradley Construction
Co., Inc.
GUYER BROTHERS, INC. Pact One LLC Wexcon, Inc.
Snyder Environmental
Services, inc.
Terra Works, Inc.
DOLI Construction
Corporation E.K. Services, Inc. HRI, Inc. RIII Construction Inc
Kinsley Construction Site
York
#1-35 Disconnect Existing Service Line, complete in place.
Each 1 $ 500 $ 500 $ 2,149.75 $ 2,149.75 $ 1,020.0 $ 1,020.0 $ 400 $ 400 $ 800 $ 800 $ 609 $ 609 $ 1,000.0 $ 1,000.0 $ 3,625.0 $ 3,625.0 $ 1,836.0 $ 1,836.0 $ 50 $ 50 $ 1,500.0 $ 1,500.0
#1-36 Trench Plug, complete in place.
Each 2 $ 250 $ 500 $ 887.75 $ 1,775.5 $ 1,340.0 $ 2,680.0 $ 500 $ 1,000.0 $ 1,710.0 $ 3,420.0 $ 1,790.0 $ 3,580.0 $ 500 $ 1,000.0 $ 925 $ 1,850.0 $ 623 $ 1,246.0 $ 100 $ 200 $ 2,000.0 $ 4,000.0
#1-37 12" Blow Off Valve Assembly, complete in place.
Each 1 $ 2,500.5 $ 2,500.5 $ 2,070.5 $ 2,070.5 $ 4,300.0 $ 4,300.0 $ 2,800.0 $ 2,800.0 $ 1,780.0 $ 1,780.0 $ 5,090.0 $ 5,090.0 $ 3,500.0 $ 3,500.0 $ 3,210.0 $ 3,210.0 $ 6,923.0 $ 6,923.0 $ 5,500.0 $ 5,500.0 $ 2,700.0 $ 2,700.0
#1-38
Remove Existing Fire Hydrants and Return to Owner, complete in place.
Each 6 $ 1,000.0 $ 6,000.0 $ 1,870.75 $ 11,224.5 $ 855 $ 5,130.0 $ 800 $ 4,800.0 $ 1,800.0 $ 10,800.0 $ 603 $ 3,618.0 $ 500 $ 3,000.0 $ 1,235.0 $ 7,410.0 $ 3,012.0 $ 18,072.0 $ 100 $ 600 $ 1,500.0 $ 9,000.0
#1-39 Fire Hydrants, complete in place.
Each 6 $ 7,200.0 $ 43,200.0 $ 9,563.0 $ 57,378.0 $ 8,840.0 $ 53,040.0 $ 6,800.0 $ 40,800.0 $ 11,300.0 $ 67,800.0 $ 5,864.0 $ 35,184.0 $ 7,000.0 $ 42,000.0 $ 11,145.0 $ 66,870.0 $ 11,488.0 $ 68,928.0 $ 8,900.0 $ 53,400.0 $ 10,000.0 $ 60,000.0
#1-40 6" Concrete Curb, complete in place.
Linear Feet 53 $ 135 $ 7,155.0 $ 161.5 $ 8,559.5 $ 208 $ 11,024.0 $ 65 $ 3,445.0 $ 190 $ 10,070.0 $ 249 $ 13,197.0 $ 100 $ 5,300.0 $ 74 $ 3,922.0 $ 136 $ 7,208.0 $ 75 $ 3,975.0 $ 150 $ 7,950.0
#1-41 Driveway Restoration, complete in place.
Linear Feet 220 $ 40 $ 8,800.0 $ 80 $ 17,600.0 $ 138 $ 30,360.0 $ 100 $ 22,000.0 $ 108 $ 23,760.0 $ 125 $ 27,500.0 $ 40 $ 8,800.0 $ 64 $ 14,080.0 $ 228 $ 50,160.0 $ 75 $ 16,500.0 $ 75 $ 16,500.0
#1-42
Township Road Permanent
Pavement Restoration, complete in place.
Linear Feet 140 $ 35 $ 4,900.0 $ 81.5 $ 11,410.0 $ 217 $ 30,380.0 $ 37 $ 5,180.0 $ 148 $ 20,720.0 $ 138 $ 19,320.0 $ 50 $ 7,000.0 $ 54 $ 7,560.0 $ 265 $ 37,100.0 $ 75 $ 10,500.0 $ 85 $ 11,900.0
#1-43 State Highway Base Course, 5"
Thickness, complete in place.
Square Yards 3310 $ 6.25 $ 20,687.5 $ 52.5 $ 173,775.0 $ 74 $ 244,940.0 $ 55 $ 182,050.0 $ 40 $ 132,400.0 $ 57 $ 188,670.0 $ 44 $ 145,640.0 $ 62 $ 205,220.0 $ 9 $ 29,790.0 $ 60 $ 198,600.0 $ 60 $ 198,600.0
#1-44
State Highway Binder Course, 2.5" Thickness, complete in place.
Square Yards 3310 $ 10 $ 33,100.0 $ 20.25 $ 67,027.5 $ 23 $ 76,130.0 $ 26 $ 86,060.0 $ 18.5 $ 61,235.0 $ 56.25 $ 186,187.5 $ 22 $ 72,820.0 $ 32 $ 105,920.0 $ 144 $ 476,640.0 $ 25 $ 82,750.0 $ 50 $ 165,500.0
#1-45 State Highway Mill & Overlay, complete in place.
Square Yards 3905 $ 27 $ 105,435.0 $ 24 $ 93,720.0 $ 35 $ 136,675.0 $ 26.5 $ 103,482.5 $ 30.5 $ 119,102.5 $ 46.5 $ 181,582.5 $ 20 $ 78,100.0 $ 29 $ 113,245.0 $ 38 $ 148,390.0 $ 25 $ 97,625.0 $ 30 $ 117,150.0
#1-46
Verify Connections Along
Existing 12" Watermain, complete in place.
Each 10 $ 500 $ 5,000.0 $ 295.25 $ 2,952.5 $ 380 $ 3,800.0 $ 800 $ 8,000.0 $ 700 $ 7,000.0 $ 1,059.0 $ 10,590.0 $ 900 $ 9,000.0 $ 1,170.0 $ 11,700.0 $ 897 $ 8,970.0 $ 200 $ 2,000.0 $ 1,000.0 $ 10,000.0
#1-47 Test Pit Existing Service
Connections, complete in place.
Each 73 $ 20 $ 1,460.0 $ 147.5 $ 10,767.5 $ 414 $ 30,222.0 $ 350 $ 25,550.0 $ 170 $ 12,410.0 $ 315 $ 22,995.0 $ 500 $ 36,500.0 $ 740 $ 54,020.0 $ 897 $ 65,481.0 $ 200 $ 14,600.0 $ 400 $ 29,200.0
#1-48
Install Water Meter and Water
Meter Pit as Furnished by
Owner, when Directed by Owner or Engineer, complete in place.
Each 73 $ 300 $ 21,900.0 $ 270.75 $ 19,764.75 $ 510 $ 37,230.0 $ 1,500.0 $ 109,500.0 $ 800 $ 58,400.0 $ 412 $ 30,076.0 $ 1,200.0 $ 87,600.0 $ 905 $ 66,065.0 $ 190 $ 13,870.0 $ 1,950.0 $ 142,350.0 $ 2,500.0 $ 182,500.0
#1-49 PennDOT Inspection Allowance, complete in place. Enter bid amount of $3,000.
Lump Sum 1 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,660.0 $ 3,660.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0 $ 3,000.0
#1-50 Installation of 3/4" Service Line by Opencut after Failed Attempt to Bore, complete in place.
Linear Feet 1364 $ 10 $ 13,640.0 $ 1.25 $ 1,705.0 $ 108 $ 147,312.0 $ 55 $ 75,020.0 $ 160 $ 218,240.0 $ 91 $ 124,124.0 $ 80 $ 109,120.0 $ 179 $ 244,156.0 $ 1 $ 1,364.0 $ 160 $ 218,240.0 $ 120 $ 163,680.0
#1-51 Removal of Concrete Pavement, including Hauling and Disposal, 8” Depth, complete in place.
Square Yards 3310 $ 2 $ 6,620.0 $ 5.75 $ 19,032.5 $ 16 $ 52,960.0 $ 10 $ 33,100.0 $ 25.64 $84,868.40 $ 12 $ 39,720.0 $ 15 $ 49,650.0 $ 16 $ 52,960.0 $ 8 $ 26,480.0 $ 12 $ 39,720.0 $ 5 $ 16,550.0
#1-52
State Highway Base Course, 8”
Thickness, complete in place.
(This would be paid in lieu of the
5” thickness item in areas where the concrete pavement is encountered.)
Square Yards 3310 $ 10 $ 33,100.0 $ 75.5 $ 249,905.0 $ 85 $ 281,350.0 $ 75 $ 248,250.0 $ 68 $ 225,080.0 $ 90 $ 297,900.0 $ 70 $ 231,700.0 $ 92 $ 304,520.0 $ 1 $ 3,310.0 $ 78 $ 258,180.0 $ 80 $ 264,800.0
Total Cost $ 3,222,359.0 $ 3,573,945.25 $ 4,177,145.0$ 3,792,193.0 $ 5,299,930.0$ 4,060,400.0 $ 4,314,520.0$ 3,965,728.5 $ 4,479,245.0 $ 5,221,130.0$ 4,406,770.0