4-00 91 13.1 - Addendum No. 1.pdf

PDF 778 KB Posted

Attached to
Mt. Rock and S.R. 997 Water Main Replacement
Solicitation number
US.194237
Issued by
Fulton County, Pennsylvania

View the file

Other files

File Type Posted
2-Bidding Documents.pdf PDF
3-Project Manual.pdf PDF
5-20250807 Bid Tabulation.pdf PDF
1-Bid Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/30/2025 00 91 13.1 - 1 Guilford Water Authority Mt. Rock and S.R. 997 Water Main Replacement

ADDENDUM NO. 1

ADDENDUM NO. 1

Date: July 30, 2025

To: ALL BIDDERS

From: Buchart Horn, Inc.

Consulting Engineers and Planners 445 West Philadelphia Street York, PA 17401

Subject: Guilford Water Authority

Project: 90022-25

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated July 2025. Acknowledgement of receipt of this Addendum shall be completed by answering Bidder Acknowledgement

1.0.6 when submitting bids on the PennBid website. Failure to do so may subject the Bidder to disqualification.

PRE-BID CONFERENCE

A copy of the meeting minutes and attendees list from the July 22, 2025 Pre-Bid Conference is attached to this Addendum. The minutes are for information purposes only and do not reflect formal interpretations or revisions to the Contract Documents.

ITEM A – REVISIONS TO THE PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP IN THE PROJECT

MANUAL

Section 00 41 13.20, Bid Form – The electronic bid form via PennBid has been updated.

ITEM B - REVISIONS TO THE SPECIFICATIONS GROUP IN THE PROJECT MANUAL

Page 00 73 00-2, Supplementary Conditions – CHANGE Paragraph 5.2.1. to read as follows:

“5.2.1 ADD the following 5.2, Commercial General Liability (CGL) Insurance:

Minimum combined single limit for both personal injury and property damage:

$1,000,000 Each Occurrence $2,000,000 General Aggregate per Project $2,000,000 Products/Completed Operations Aggregate $1,000,000 Personal and Advertising Injury Limits

5.2.1.1 The Owner and Engineer shall be named as additional insured on the CGL insurance.

5.2.1.2 The Owner shall be named as additional insured with Waiver of Subrogation on a primary and non-contributory basis and included on-going and completed operations.”

Page 00 73 00-3, Supplementary Conditions – CHANGE Paragraph 5.4 to read as follows:

“5.4 ADD the following to 5.4, Worker Compensation Insurance:

5.4.1 Minimum amounts of Employer’s Liability Insurance shall be as follows:

$1,000,000 Each Person $1,000,000 Each Accident $1,000,000 Disease - Each Employee”

7/30/2025 00 91 13.1 - 2 Guilford Water Authority

ADDENDUM NO. 1

Page 00 73 00-3, Supplementary Conditions – ADD Paragraph 5.11 to read as follows:

“5.11 ADD the following:

Additional insureds shall be provided on a Primary basis.”

Page 01 22 02-2, Measurement and Payment – DELETE Paragraph 1.4.B.

Page 01 22 02-5, Measurement and Payment

ADD Paragraph 1.4.V to read as follows:

“V. STATE HIGHWAY BASE COURSE, 5” THICKNESS

1. Measurement for base course over pipe trenches shall be made in square yards as specified for the various types of pipelines. Paving will be measured to the limits of pavement specified for each type of pipeline or to the limit of paving actually placed, whichever is less.

2. Payment for base course will be made at the unit price bid per square yard, complete in place.”

ADD Paragraph 1.4.W to read as follows:

“W. STATE HIGHWAY BINDER COURSE, 2.5” THICKNESS

1. Measurement for binder course over pipe trenches shall be made in square yards as specified for the various types of pipelines. Paving will be measured to the limits of pavement specified for each type of pipeline or to the limit of paving actually placed, whichever is less.

2. Payment for binder course will be made at the unit price bid per square yard, complete in place.”

ADD Paragraph 1.4.X to read as follows:

“X. INSTALLATION OF 3/4" SERVICE LINE BY OPENCUT AFTER FAILED ATTEMPT TO BORE

1. Measurement of 3/4" service line by opencut after failed attempt to bore when directed by the Engineer will be made along the ground surface over the centerline of the service line to the limits shown on the Contract Drawings.

2. Payment for 3/4" service line by opencut after failed attempt to bore will be paid for at the unit price bid per linear foot, complete in place. Payment will include excavation and backfill, installation, and testing and disinfection.”

ADD Paragraph 1.4.Y to read as follows:

“Y. REMOVAL OF CONCRETE PAVEMENT, INCLUDING HAULING AND DISPOSAL, 8” DEPTH

1. Measurement of concrete pavement removal when directed by the Engineer will be based on the square yards that have been removed.

2. Payment for the concrete pavement removal will be made at the unit price bid per square yard. Payment will include removal, hauling, and disposal of the concrete pavement to make the job complete.”

ADD Paragraph 1.4.Z to read as follows:

“Z. STATE HIGHWAY BASE COURSE, 8” THICKNESS

1. Measurement for base course over pipe trenches when directed by the Engineer shall be made in square yards as specified for the various types of pipelines. Paving will be

7/30/2025 00 91 13.1 - 3 Guilford Water Authority

ADDENDUM NO. 1

measured to the limits of pavement specified for each type of pipeline or to the limit of paving actually placed, whichever is less.

2. Payment for this base course will be made at the unit price bid per square yard, complete in place, in lieu of the 5” thickness item in areas where the concrete pavement is encountered.”

ADD Paragraph 1.4.AA to read as follows:

“AA. INSTALLATION OF DUCTILE IRON WATER MAIN PIPELINES PROVIDED BY OWNER

1. Measurement for payment of installation of ductile iron water main pipelines provided by Owner will be determined by the Owner. The Owner is providing 1,300 linear feet of 12” ductile iron pipe and 901 linear feet of 8” ductile iron pipe.

2. Payment for installation of ductile iron water main pipelines provided by Owner will be made at the unit price bid per linear foot for the installation of the pipe, complete in place, including excavation, backfill, pipe bedding material, pipe restrained joints, testing and disinfection. Payment will not be made until testing has been completed and accepted by the Engineer.”

ITEM C - REVISIONS TO THE APPENDICES

Appendix C, PennDOT Highway Occupancy Permit – ADD PennDOT Highway Occupancy Permit No. 08116356, attached to this Addendum No. 1.

ITEM D - REVISIONS TO THE DRAWINGS

Sheet No. C-502, Restoration Details – DELETE Sheet No. C-502, Restoration Details and REPLACE with revised Sheet No. C-502, Restoration Details, attached to this Addendum No. 1.

END OF ADDENDUM NO. 1

MEETING REPORT

Buchart Horn will proceed in reliance on this report. Any discrepancy should be brought to our attention in writing within seven (7) days to the above address. Page 1 of 2

J:\PROJ\90022-25\14-BIDDING\Prebid Meeting Minutes.docx Meeting Report rev. 2/2021

The Russell E. Horn Building 445 West Philadelphia Street

York, PA 17401-3383 T: (717) 852-1400 F: (717) 852-1401

Meeting Date: July 22, 2025

Project Name: Guilford Water Authority Mt. Rock and S.R. 997 Water Main Replacement Pre-Bid Conference

Project Number: 90022-25

Report Prepared By: Buchart Horn Inc.

Meeting Location: Guilford Township Building 115 Spring Valley Rd., Chambersburg, PA

Participants: See attached Sign-In Sheet

Meeting Report

The meeting was held to review the project and bidding requirements.

• Bids are due August 7th 2:00 pm via PennBid.

• Pennsylvania Prevailing Wage Rates are required as dictated in the Project Manual.

• The duration of the contract is 270 days from Notice to Proceed.

• Work hours shall be dictated by the approved HOP permits as well as Paragraph 3.4 in Section 01 00 00 of the Project Manual.

Questions/comments from attendees:

• What is the material of the existing service lines?

o Existing service lines are copper, to the best of our knowledge.

• What is the material of the existing water main?

o The existing water main is cast iron.

• Will there be a contingency put in place in the event that there is too much rock to directional drill the service lines?

o PennDOT will not permit contingency plans, however it is something that can be discussed with the inspector if the rock cannot be bored.

• What will be the testing requirements for service lines?

o Service lines will be only be tested/inspected visually. Pressure testing will only take place on the main water main.

• Will an allowance be given for state inspection fees?

o No state inspection fees are anticipated for this project, however an allowance will be considered and will be addressed by addendum if added.

• Will there be a rock removal allowance/bid item added to the bid form?

o Consideration will be given to a rock removal item. Any changes will be made by addendum.

• Are as-builts available for the existing water main?

o No as-builts are available for the existing water main

• Will blasting be allowed on this project?

o Due to the proximity of homes and the existing water main, blasting will not be allowed on this project.

• Is there a possibility that the contract duration will be extended due to lots of rock being encountered?

o If the Owner and Engineer agree that an extension is warranted it will be considered at the time.

J:\PROJ\90022-25\14-BIDDING\Prebid Meeting Minutes.docx

• Will it be acceptable to test the new main against new valves?

o Yes, main testing against the new or existing valves is acceptable.

• What is the limit of pay for Connection Detail bid items?

o The Connection Details were intended to provide a clear depiction of the work at each intersection. The bid items will be removed and all items will be incorporated into the quantities listed for each item. A new Bid Form will be issued by addendum.

• Will there be base and binder bid items?

o These will be added by addendum.

• Does the Owner have a waste site?

o No

• Should the bedding go to the spring line of the pipe? If not, the pipe warranty may be voided.

o Any change to the bedding detail will be made by addendum.

• Are there any environmental restrictions on the timing of the work?

o Not that we are aware of. The one timing restriction in the contract is to limit construction on farms to the time period beginning October 15 to April 15. No spring/summer work will be permitted on farm land.

• Will the Owner consider payment for stored materials?

o No, but the Owner currently has 1300 LF of 12” DI pipe on hand that can be used to get the project started.

• Is a field office required?

o No. The contractor is welcome to provide his own field office if that is desired.

• Is GWA supplying meters and meter pits?

o Yes

• What is the working pressure of the pipe in the area?

o Estimated to be in the 80 – 100 psi range.

• Is PennDOT requiring a maintenance bond?

o Not that we are aware of. Any change will be made by addendum.

• What is the estimate for the project?

o $3.2 million.

The Engineer recommended that all contractors take the opportunity to visit the site if they had not already done so.

Name and Address of Permittee:

Guilford Water Authority 115 Spring Valley Road Chambersburg, PA 17202

County: Franklin

County Contact No.: (717) 264-4171

Issuing District Office: 8-0

District Contact No.: (717) 705-0925

Municipalities: Greene Township

Issue Date: 3/26/2025

Expiration Date: 3/26/2026

Application No.: 358030

Account No.:

Permit Fee: $ 0.00

Immediately upon completion of the work Permittee shall notify the permit office where application was made. Subject to all the conditions, agreements, restrictions, and regulations prescribed by the Pennsylvania Department of Transportation, (see in particular 67 Pa. Code, Chapter 212, 441 and 459 and State Highway Law, 36 P.S. Section 670 - 411, 420 and 421 ) and subject to the plans, special conditions, or restrictions herein set forth or attached hereto. This permit shall be located at the work site and shall be available for inspection by any police officer or Department representative.

Location and Description of Work Permit No.: 08116356

1 of 1 State Route #: 0997 Segment(s): From 0420 To 0430 Offset(s): From 1119 To 0591

611: Install Sub-surface Water Facility

Permit Conditions Permit No.: 08116356

1 of 21 PRIOR TO START OF NON-EMERGENCY WORK AT 717-264-4171 Opt. 4 or scottmccra@pa.gov.

CONTACT COUNTY PERMIT INSPECTOR AT LEAST 3 WORKDAYS.

2 of 21 FACILITY MAY BE PLACED IN PAVEMENT OR SHOULDER, AS PER PLANS, PROVIDED

BASE AND WEARING COURSES ARE OPENED BY SAW CUT METHOD.

3 of 21 THIS PERMIT AUTHORIZES WORK ONLY IN DEPARTMENT HIGHWAY RIGHT OF WAY.

4 of 21 DEPARTMENT MUST BE NOTIFIED IN WRITING UPON COMPLETION OF WORK.

5 of 21 TEMPORARY PAVEMENT RESTORATION AUTHORIZED CONSISTENT WITH SECTION 459.8

(K), FOR NO MORE THAN 30 DAYS.

6 of 21 COMPLETE PERMANENT PAVEMENT RESTORATION IN ACCORDANCE WITH SECTION

459.8, PRIOR TO EXPIRATION DATE. EACH PATCH MUST BE PAINTED IN ACCORDANCE

WITH SECTION 459.8 (L).

7 of 21 THE PERMITTEE IS REQUIRED TO USE HOT MIX OR WARM MIX MATERIAL FOR

TEMPORARY RESTORATION. COLD MIX WILL BE PERMITTED AT THE DISCRETION OF

THE DEPARTMENT. PERMITTEE MUST MAINTAIN A SMOOTH PAVEMENT SURFACE

SUITABLE FOR DRIVING FOR THE DURATION OF THE TEMPORARY PAVEMENT.

8 of 21 TRENCH BACKFILL COMPACTION TESTING IS REQUIRED A MINIMUM ONE TEST PER LIFT

DAILY. FOR OPENINGS LESS THAN OR EQUAL TO 500 TOTAL FEET IN PAVEMENT,

SHOULDER OR SIDEWALK, THE PERMITTEE MAY CHOOSE THE COMPACTION TEST

METHOD, PROVIDED THE TEST METHOD IS PERFORMED CONSISTENT WITH

DEPARTMENT PUBLICATIONS, AND ON THE CONDITION THAT THE PERMITTEE PROVIDE

THE COMPLETED CS-6 (PIPE INSTALLATION INSPECTION FORM) AND ACCOMPANYING

TR-478A AND/OR TR-4276 FORMS WITHIN TWO WEEKS OF THE COMPLETION OF THE

WORK REPRESENTED ON THE FORM. PENNDOT WILL NOT CLOSE-OUT THE PERMIT

PRIOR TO RECEIVING THE COMPLETED FORMS.

M-945P (6/12)

Highway Occupancy Permit Permit No.: 08116356

Page 1 of Permit # 08116356

Permit Conditions Permit No.: 08116356

9 of 21 CURB MUST BE INSTALLED IN ACCORDANCE WITH PENNDOT ROADWAY STANDARDS

RC-64M AND RC-67M.

10 of 21 SHOULDERS MUST BE RESTORED IN ACCORDANCE WITH APPROPRIATE SECTION OF

PUB. 408 AND ROADWAY CONSTRUCTION STANDARDS RC-25M.

11 of 21 PERMITTEE MUST MAINTAIN EXISTING SHOULDER DURING CONSTRUCTION.

12 of 21 IT IS THE PERMITTEE'S RESPONSIBILITY TO IDENTIFY ALL PENNDOT OWNED/OPERATED

FACILITIES WITHIN THE LIMITS OF PERMITTED WORK. IF DAMAGED BY THE PERMITTED

WORK, IT IS PERMITTEES RESPONSIBILITY TO CONTACT THE DEPARTMENT

IMMEDIATELY AND RESTORE THE FACILITY TO ITS ORIGINAL CONDITION OR AS

DIRECTED BY THE DEPARTMENT.

13 of 21 ALL DISTURBED AREAS OUTSIDE THE PAVEMENT OR SHOULDER SHALL BE RESTORED

TO A CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED BEFORE THE START OF

WORK.

14 of 21 MINIMUM WORK ZONE TRAFFIC CONTROL TO BE IN ACCORDANCE WITH PUB. 213. SEE

PUB 212 FOR ADDITIONAL DETAILS.

15 of 21 LANE CLOSURES WILL NOT BE PERMITTED DURING NON-EMERGENCY WORK FOR THE

FOLLOWING PERIODS: EASTER WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM;

MEMORIAL DAY WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM; FOURTH OF JULY

HOLIDAY - REQUEST INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE;

LABOR DAY WEEKEND - FRIDAY 6:00AM TO TUESDAY 9:00AM; THANKSGIVING

WEEKEND -WEDNESDAY 6:00AM TO MONDAY 9:00AM; CHRISTMAS HOLIDAY-DECEMBER

REQUEST INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE; NEW YEAR'S

HOLIDAY - REQUEST INFORMATION FROM DISTRICT OR COUNTY PERMIT OFFICE;

PRIMARY AND GENERAL ELECTION DAYS- TUESDAY 6:00AM TO 9:00PM; THERE MAY BE

ADDITIONAL TRAFFIC RESTRICTIONS FOR SPECIAL EVENTS THAT ATTRACT LARGE

VOLUMES OF TRAFFIC IN THE AREA OF THE HOP.

16 of 21 PERMITTEE IS RESPONSIBLE FOR ENSURING THAT MUD, SILT AND OTHER DEBRIS IS

REMOVED FROM VEHICLES AND TIRES (BY POWER WASH, ETC.) BEFORE ENTERING

ONTO THE HIGHWAY.

17 of 21 PERMITEE MUST INFORM GREENE TWP. FIVE WORKING DAYS PRIOR TO THE START OF

NON-EMERGENCY PERMITTED WORK.

18 of 21 All WORK WITHIN THE STATE RIGHT OF WAY MUST FOLLOW SPECIFICATIONS AND

PUBLICATIONS 408 AND 72M.

19 of 21 SUBMIT FORM M-937R (ROUTE/BRIDGE RESTRICTION), TO THE COUNTY PERMIT

INSPECTOR AT LEAST 15 DAYS IN ADVANCE FOR ANY LANE RESTRICTIONS, LANE

CLOSURES OR APPROVED DETOURS. THE INSPECTOR WILL REVIEW AND FORWARD THE

REQUEST TO THE DISTRICT HAULING UNIT FOR APPROVAL.

20 of 21 IT IS THE PERMITTEES RESPONSIBILITY TO PROVIDE NECESSARY EQUIPMENT FOR

TESTING OF MATERIALS DELIVERED ON SITE INCLUDING CERTIFIED TECHNICIANS.

21 of 21 PERMITTEE WILL BE RESPONSIBLE FOR COORDINATING RELOCATION OF ANY UTILITY

FACILITY CONFLICTS WHICH ARE A RESULT OF ACTIVITIES CONDUCTED UNDER THIS

PERMIT. ALL UTILITY FACILITY COORDINATION AND RELOCATION MUST BE IN

ACCORDANCE WITH 67 PA. CODE CHAPTER 459, OCCUPANCY OF HIGHWAYS BY

UTILITIES.

M-945P (6/12)

Highway Occupancy Permit Permit No.: 08116356

Page 2 of

Acknowledgement of Completion

Permit work has been completed:

Date:

By:

Michael B. Carroll

Secretary of Transportation

Kevin M. Keefe, P.E.

District Executive

M-945P (6/12)

Highway Occupancy Permit Permit No.: 08116356

Page 3 of

EXISTING PAVEMENT

EXISTING BASE COURSE

EXISTING WEARING COURSE

2A STONE BACKFILL

MATERIAL, COMPACT

IN 6" LIFTS

SPAV, WRG, PG 64E-22, 9.5 mm MIX 3.0 to < 10.0 MILLION ESALs, DEPTH 2.0", SRL-E

NOT TO SCALE5

GREENE TOWNSHIP PERMANENT

PAVEMENT RESTORATION DETAIL

6"

TYP.

MIN. CUTBACK

OUTSIDE TRENCH

SUBGRADE

EXISTING

PAVEMENT

EXISTING

PAVEMENT

12"

TYP.

2A STONE BACKFILL MATERIAL,

COMPACT IN 6" LIFTS

6" MIN DEPTH BASE COURSE

(PADOT 2A STONE)

SUPERPAVE ASPHALT MIXTURE DESIGN,

HMA WEARING COURSE, PG 64-22,

0.3 TO < 3 MILLION ESALS,

9.5 MM MIX, 4" DEPTH, SRL-L

NOT TO SCALE6 DRIVEWAY RESTORATION DETAIL

TYPE II BEDDING

NOT TO SCALE1

STANDARD

PIPE BEDDING DETAIL

6"

O.D.

BACKFILL W/SPECIFIED

MATERIAL. SEE DETAILS

SHEET C-502

PENNDOT 1B BACKFILL

MATERIAL

NOTES

1. SEE OTHER TYPICAL DETAILS FOR TRENCH RESTORATION AT GRADE.

12" MIN

NOTES:

1. SAWCUT PAVEMENT 12" MINIMUM PAST THE EDGE OF THE

TRENCH OPENING.

2. PERFORM TRENCH WORK.

3. INSTALL SELECT STONE BASE.

4. INSTALL TEMPORARY PAVEMENT IN ACCORDANCE WITH DAILY PAVEMENT RESTORATION DETAIL.

DAILY PAVEMENT RESTORATION SHALL BE REMOVED PRIOR TO INSTALLATION OF FINAL PAVEMENT RESTORATION.

5. DETECTABLE TAPE COLORED AS FOLLOWS:

--- YELLOW: GAS AND ASSOCIATED LINES, SUCH AS FUEL LINES.

--- ORANGE: TELEPHONE AND ASSOCIATED LINES, SUCH AS CATV.

--- BLUE: WATER AND ASSOCIATED LINES SUCH AS IRRIGATION LINES.

--- RED: ELECTRIC AND ASSOCIATED LINES.

--- GREEN: SEWER AND ASSOCIATED LINES.

FIN GRADE

TOPSOIL AND SEED/SOD AS REQUIRED

NOTES:

1. DETECTABLE TABLE COLORED AS FOLLOWS:

- YELLOW: GAS AND ASSOCIATED LINES, SUCH AS FUEL LINES.

- ORANGE: TELEPHONE AND ASSOCIATED LINES, SUCH AS CATV.

- BLUE: WATER AND ASSOCIATED LINES SUCH AS IRRIGATION LINES.

- RED: ELECTRIC AND ASSOCIATED LINES.

- GREEN: SEWER AND ASSOCIATED LINES.

2. ADDITIONAL CONSIDERATIONS MAY BE REQUIRED BY SITE AND SOIL

CONDITIONS OR PIPE MANUFACTURER'S RECOMMENDATIONS.

NOT TO SCALE3

TRENCH RESTORATION

AT NON-PAVED AREAS

BACKFILL W/SPECIFIED

MATERIAL. PLACE AND

COMPACT AS SPECIFIED

PIPE BEDDING.

SEE DETAIL 3 THIS SHEET.

VA

RI

ES

6"

NO EXCAVATED MATERIAL TO BE

PLACED WITHIN 2 FT OF SIDE OF

EXCAVATION

EXCAVATED MATERIAL

1'- 0"

DETECTABLE UNDERGROUND

MARKING TAPE (6" WIDE) AS

REQUIRED. SEE COLORS IN NOTES.

SPAV, WRG, PG 64E-22, 12.5 mm MIX 3.0 to < 10.0 MILLION ESALs, DEPTH 2.0", SRL-E

12" TYP

SPAV, BNDR, PG 64S-22, 19.0 mm MIX,

3.0 to <10.0 MILLION ESALs, DEPTH 2.5"

SPAV, BASE, 25.0 mm MIX, PG 64S-22,

3.0 TO <10.0 MILLION ESALs, DEPTH 5.0"

OR MATCH EXISTING CONCRETE BASE,

WHICHEVER IS GREATER

NOT TO SCALE4

PENNDOT PERMANENT

PAVEMENT RESTORATION DETAIL

1'- 0"

DETECTABLE UNDERGROUND MARKING TAPE

(6" WIDE) AS REQUIRED. SEE COLORS IN NOTES.

PENNDOT 2A BACKFILL MATERIAL COMPACTED

IN 4" LIFTS (MECHANICAL TAMPER) OR 8" LIFTS

(VIBRATORY COMPACTION).

EXISTING PAVEMENT

LIMIT OF TRENCH

LIMIT OF TRENCH

FIN GRADE

SPAV, WRG, 12.5 mm MIX, PG 64S-22,

3.0 < 10.0 MILLION ESALs, DEPTH 2.0", SRL-H (4" HOT MIX IN WINTER)

DETECTABLE UNDERGROUND MARKING TAPE

(6" WIDE) AS REQUIRED. SEE COLORS IN NOTES.

PENNDOT 2A BACKFILL MATERIAL COMPACTED

IN 4" LIFTS (MECHANICAL TAMPER) OR 8" LIFTS

(VIBRATORY COMPACTION).

NOT TO SCALE2

DAILY PAVEMENT

RESTORATION DETAIL

GENERAL PAVING NOTES:

* NOTE THAT THE "PAVEMENT RESTORATION DETAIL" CAN BE DONE

DAILY IN LIEU OF "DAILY TRENCH RESTORATION DETAIL".

* NO PAYMENT WILL BE MADE FOR THE "DAILY TRENCH RESTORATION DETAIL".

PG 64E-22 TO BE PLACED ON

ALL PAVEMENT EDGES

WEARING COURSE TO EXTEND

TO EDGE OF ROADWAY

WEARING COURSE TO EXTEND

TO WHITE LINE/FOG LINE

SPAV, BASE, 25.0 mm MIX, PG 64S-22,

3.0 TO <10.0 MILLION ESALs, DEPTH 4.5"

OR MATCH EXISTING, WHICHEVER IS GREATER

J:\

PR

OJ

\90

2-

\08

-C

AD

D\

-C

IV

IL\

5_ C5

-C

2.D

W G/

C-

2/7 /28

/20

3:

P M/

Se ch ris t, J ac ob

PROJECT NO:

CHECKED BY:

ISSUED DATE:

SHEET NO:

DRAWN BY:

© BUCHART HORN, INC.

MA

RK

IS

SU

ED

D

AT

E

DE

SC

RI

PT

IO

N

RE

VI

SI

ON

S

SHEET TITLE:

90022-25

MT

R

OC

K

W

AT

ER

M

AI

N

RE

PL

AC

EM

EN

T

Mo lly

P itc he r H igh wa y, US

R ou te

Gr ee ne / S ou tha mp ton

T wp

, F ra nk lin

C ou nty , P en ns ylv an ia

GU

ILF

OR

D

W

AT

ER

A

UT

HO

RI

TY

5 S pr ing

V all ey R oa d

CH

AM

BE

RS

BU

RG

, P A, 06/2025

/20

PE

R

FC

CD

C

OM

ME

NT

S

/20

PE

R

FC

CD

C

OM

ME

NT

S

C-502

RESTORATION

DETAILS

JES

DMY

ADDENDUM NO. 1

/20

A

DD

EN

DU

M

NO

. 1

00 91 13.1 - Addendum No. 1
1 - Prebid Meeting Minutes
2- PreBidAttendance
3- Permit-08116356
ADD NO 1 REV C-502
C-502

File details come from the government source that posted it. Updated .