Q and A.docx

DOCX document 16 KB Posted

Attached to
Rolling Shelves
Solicitation number
F3C2MX5156AW03
Issued by

About this file

The document is a Questions and Answers (Q&A) file for a Rolling Shelves solicitation issued by the 5th Maintenance Squadron at Minot Air Force Base. The solicitation seeks the construction and installation of three separate track systems for rolling shelves in two specific rooms: room 158 (Fabrication Flights tool room) and room 144 (Cold Weather Gear storage room). Key details from the Q&A include bid submission deadline of 08/01/25 at 11:00am, confirmation that all 3 systems will be installed simultaneously, and specific site logistics such as no on-site loading dock (but a forklift can be reserved with prior notice), available staging area in the hall outside the rooms, and a requirement for closed end panels for security and tool/item control. The contract is contingent on fund availability, with the solicitation issued under the Department of the Air Force Global Strike Command, and has a federal contract opportunity ID of 687a704dc9683e1b86069153.

View the file

Other files

File Type Posted
70-5MXS-SOW FAB CTK and CWG Rolling Shelves-5.docx DOCX document
Minot Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and answer doc (as of 23 July 2025):

Q: When would the bids be able to be placed by?

A: You can place bids from now to 08/01/25 11:00am.

Q: Are there possibly other drawings to look at, regarding the placement of these systems? Or any drawings? I have the specifications with the dimensions and other information. But figured to ask if there were drawings/ floor plans available.

A: The Floor plans are on page 4 for room 158 and page 8 for room 144 on the Statement of Work attachment. Are these drawings insufficient?

Q: Are there any other contacts I have missed, to also reach out to?

A: There are not any other Rolling Shelves requirements being solicited as of 07/23/25.

Q: Are we delivering and installing all 3 systems at the same time?

A: Yes, all 3 systems will be installed at the same time.

Q: Is there a loading dock or forklift on site to off-load the truck?

A: No loading dock on site, with prior notice a forklift can be reserved from LRS

Q: Is there a dumpster on site?

A: We do have a dumpster for everyday garbage. A roll-off for construction waste may have to be requested if the additional waste from the project gets excessive.

Q: Is there staging near rooms 158 & 144 to place our materials during installation?

A: Yes, the hall area outside of the room.

Q: Do any of the rolling shelves require a back panel?

A: The end panels will need to be closed off for security and tool/item control.