Text version

F2W3D5 341CES/CECR-BASE SRMC

BASE OPERATOR

2800 AIRPORT AVENUE B

GREAT FALLS MT 59404-5570

TEL: (406) 727-4650 FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

FA462617Q0002 15-Aug-2017 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

FA4626 341ST CONTRACTING SQUADRON

7015 GODDARD DRIVE BLDG 145

MALMSTROM AFB MT 59402-6863

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

15-Sep-2017(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

406-731-4476WILLIAM J. CLARK

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

FA462617Q0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Bldg 1440

FFP

(1400 gallon tank) Remove approximately 200 gallons of existing foam concentrate from 1400 gallon tank. Rinse tank, stainless steel piping, and pumps of residual foam concentrate. Install 800 gallons of new Chemguard C-6 Formulation 3% Mil-Spec Concentrate. Adjust the foam pressure relief valve after foam tank is filled. Make corrections to Jockey pump check valves to ensure they are in proper sequence. Reconfigure sensing lines per NFPA 25. Each pump shall have its own individual pressure sensing line. Replace existing foam pump controller with new Torna Tech Contractor. Start-up pump and controller with manufacturer’s representative.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot Bldg 1845

FFP

(400 gallon tank) Remove existing foam concentrate, disassemble, clean, inspect and reassemble all valves, replace tank gasket and refill foam. Contractor shall submit a detailed report of work accomplished, repair recommendations and what is needed to bring system up to current NFPA and UFC compliance. Work shall be conducted in accordance with manufacturer’s specifications and recommendations.

NET AMT

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ADC 1 F2W3D5 341CES/CECR-BASE SRMC

BASE OPERATOR

2800 AIRPORT AVENUE B

GREAT FALLS MT 59404-5570

(406) 727-4650

F2W3D5

0002 90 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

F2W3D5

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days after the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section G - Contract Administration Data

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(JUNE 2012)

(a) Definitions. As used in this clause–

(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or

(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

2 in 1 Stand Alone

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4626 Admin DoDAAC FA4626 Inspect By DoDAAC F2W3D5 Contracting Officer FA4626 Service Acceptor (DoDAAC) FA4626

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Jonathan.schrader.2@us.af.mil William.clark.90@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

WAWF Help Desk

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.246-1 Contractor Inspection Requirements APR 1984 52.246-21 Warranty of Construction MAR 1994 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.246-7001 Warranty Of Data MAR 2014

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JAN 2017).

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are ncorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

(ii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(iii) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

(iv) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(v) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(vi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JUL 2013).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (Jan 2017).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).

(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).

(v) 52.222-36, Equal Employment for Workers with Disabilities (JUL 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, ``United States'' includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).

(vii) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.

Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(viii)(A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O 13627) (Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).

(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR[supreg] Program or Federal Energy Management Program (FEMP) will be--

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xv) 52.223-20, Aerosols (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent;

or contracts for construction of buildings or facilities.

(xvii) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition--

(A) Is set aside for small business concerns; or

(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).

(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792) (Applies to contracts greater than $25,000 that provide for the provision, the service, or the sale of food in the United States).

(xix) 52.232-33, Payment by Electronic Funds Transfer--System for Award Management (JUL 2013) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) database as its source of EFT information.)

(xx) 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)

(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (June, 2016) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.

(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (Applies to contracts over $35,000).

(iii) 52.211-17, Delivery of Excess Quantities (SEP 1989) (Applies to fixed-price supplies).

(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).

(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights--

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination.

The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

AFFARS 5352.201-9101 OMBUDSMAN (Apr 2014)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the Center/MAJCOM ombudsman, HQ AF Global Strike Command/AFICA/KG, 841 Fairchild Ave, Building 5541, Rm 327, Barksdale AFB, LA 71110. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/AFISRA ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

Section J - List of Documents, Exhibits and Other Attachments

LIST OF ATTACHMENTS

LIST OF ATTACHMENTS

ITEM NR SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS

Attach 1 Statement of Work

Attach 2 Wage Determination MT170063 07/21/2017 MT63, pages 1 thru 6

Attach 3 Base Entry Letter

Section L - Instructions, Conditions and Notices to Bidders

L-9 INFORMATION TO OFFERORS

L-9-CONSTRUCTION PURCHASE ORDER. INFORMATION TO OFFERORS (ITO) AND

INSTRUCTIONS FOR PROPOSAL PREPARATION (1 Apr 2011)

A. INFORMATION TO OFFERORS

1. Point Of Contact (POC). The POC for this acquisition is the Contracting Officer (CO), Jonathan Schrader.

Address any questions or concerns to the CO, at (406) 731-4968; Fax: (406) 731-3748; or Email:

jonathan.schrader.2@us.af.mil

2. Discrepancies and Ambiguities. If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the CO in writing with supporting rationale not later than 15 days after the Request for Quote (RFQ) release. Also, the Offeror shall give written notification to the CO of ambiguities in the solicitation, including the specifications, drawings, statement of work, etc., not later than 5 days after RFQ release.

3. Revisions and Amendments. The Government reserves the right to revise or amend the specifications or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by formal amendment (Standard Form 30) to this RFQ. If such amendments require material changes in quantities or costs, the proposal closing date may be postponed by enough days to enable Offerors to revise their proposals. In such cases, the amendment will include an announcement of the new proposal closing date and time.

4. Pre-Performance Conference. A pre-performance conference will be scheduled by and held at the office issuing this RFQ prior to the commencement of any work under the contract that will be awarded as a result of this solicitation and offer. The Contractor or his duly authorized representative should attend the pre-performance conference.

5. Initial Proposals. Offerors shall submit initial proposals with their most favorable terms.

6. Questions Concerning the RFQ. All questions concerning the RFQ must be submitted in writing not later than 2:00 pm (MT) on 8 September 2017. Submit questions to the Contracting Officer, Jonathan Schrader via email:

jonathan.schrader.2@us.af.mil .

B. PROPOSAL PREPARATION INSTRUCTIONS

1. General Instructions and Information. These instructions prescribe the format of proposals and describe the approach for the development and presentation of the proposed data. The Government intends to award this contract using the Lowest Price Technically Acceptable (LPTA) approach. Offers will be evaluated using the factors in Section M, Evaluation Factors for Award. The offeror’s proposal must include all data and information requested and must be submitted in accordance with these instructions.

a. This RFQ is being conducted in accordance with FAR 15.3, Source Selection and AFFARS 5315.101-1 including Informational Guidance (IG) 5315.101-1. Offers will be evaluated using the factors and subfactors under Section M, Evaluation Factors for Award. Non-compliance with the RFQ may be grounds to eliminate the proposal from consideration for contract award.

b. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal.

c. Proposals shall not contain classified information.

d. Alternate proposals will not be accepted.

e. Electronic proposals will not be accepted.

f. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of unsuccessful proposals.

VOL

NUMBER OF HARD

COPIES TITLE PAGE LIMIT

I 1 Original on CD plus 3 paper copies Proposal Documents Unlimited

II

1 Original on CD plus 3 paper copies Technical Requirements (Answers to Evaluation Factors)

3 Pages per Focus Area

C. RECEIPT OF PROPOSALS.

1. Proposal Labeling. Proposals delivered in response to this RFQ shall reflect the following information on the address label:

a. RFQ # FA4626-17-Q-0002

b. The legend, “To be delivered unopened to the Contracting Officer”, and

NOTE: Hand carried deliveries shall be received and accepted at the address shown above. Delivery may be accomplished from 8:00 am – 2:00 pm on the date set forth for receipt and up to one week prior. Please call the CO at least two hours prior to your anticipated arrival time to ensure there will be personnel available to receive your proposal. Contractor personnel delivering proposals are advised that they may be unable to access Malmstrom, AFB without a valid U.S. Uniformed Services Identification Card or DoD Force Common Access Card (CAC) that has been through the Biometrics process. Be advised your vehicle may be subjected to random vehicle searches, and/or you may encounter unexpected delays at the gates and plan accordingly.

D. PROPOSAL VOLUME INSTRUCTIONS

1. Proposal Documents (FACTOR 1). The purpose of this volume is to provide information to the Government to determine price fair and reasonable and for preparing the contract document and supporting file.

a. Price Information. The Contracting Officer (CO) has determined there is a high probability of reasonable price competition for this acquisition. Upon examination of the initial offers, the CO will review this determination and if, in the CO’s opinion, reasonable price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. If at any time during this acquisition the CO determines that reasonable price competition no longer exists however, offerors may be required to submit information necessary for the CO to determine the price fair and reasonable in accordance with FAR 15.403-5.

(1) Insert proposed unit and extended prices in Section B for each Fixed Price Contract Line Item Number

(CLIN). Offerors must propose on every contract line item, even if it is $0.00, in order to be considered for award.

CLINs (0001 and 0002) will count towards total evaluated cost.

(2) All dollar amounts for all CLINs/SubCLINs should be proposed in whole dollar amounts rounded to two decimal points, for example: $1,420.78.

b. Contract Documents. As part of the proposal submission, include the following:

(1) Completed Standard Form 18 (Request for Quotes). Completed form SF18, Sections 13-16 completed and signed by the offeror constitutes an offer, which the Government may accept.

(2) Acknowledgement of all amendments. Each offeror must sign and return one copy of the Standard

Form (SF) 30 by the date specified on the form.

(3) Exceptions to Solicitation Requirements. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the RFQ to which the exception is taken.

Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule and cost and specific requirement of the RFQ.

2. Technical Requirements Documents (FACTOR 2). The offeror will provide documented proof of capability to perform the requirements of the contract by providing answers to the Evaluation Factors in Provision M-9 Paragraph C of the solicitation.

(1) To be considered technically acceptable the offerer must provide rationale for all focus areas listed in M-9 Paragraph C.

(2) Offerors will be rated Pass/Fail directly from the information they provide.

Section M - Evaluation Factors for Award

M-9 EVALUATION CRITERIA

M-9-CONSTRUCTION PURCHASE ORDER. EVALUATION CRITERIA (1 Apr 2011)

A. AWARD WITHOUT DISCUSSIONS.

As set forth in FAR 52.215-1(f)(4), the Government intends to award without discussions. The Government may make a final determination as to whether the offeror’s quote is acceptable or unacceptable solely on the basis of the initial quote as submitted.

B. BASIS FOR CONTRACT AWARD.

1. Competitive Best Value. This is a competitive award using Lowest Price Technically Acceptable (LPTA), in which competing offerors' will be evaluated on their capabilities on the evaluation factors listed in Section M, paragraph C below. Offers will be evaluated by the government’s evaluation team and contractor’s will be given a PASS/FAIL rating. Award will be given to the lowest priced PASS offer.

2. Prices. Offerors must include unit prices for each CLIN listed in Section B.

3. Award. Only one award will be made as a result of this solicitation.

4. Evaluation Procedure. Offers will initially be ranked by price, offerors technical capabillity will then be evaluated from lowest to highest price. If the lowest price offeror is determined to be “Technically Acceptable” the evaluation is complete and no other offeror will be evaluated. If the lowest price offeror is deemed technically unacceptable the evaluation team will proceed to the next lowest offeror until an offeror receives a “Technically Acceptable” rating or until all offerors are evaluated.

C. EVALUATION FACTORS.

1. FOCUS AREA 1 - Company has demonstrated that they are regularly engaged in the cleaning and repair of AFFF Tanks.

PASS – Offeror has demonstrated that they have 3 or more projects engaged in the cleaning and repair of AFFF Tanks within a time period from 2007 to 2017.

FAIL – Offeror has not demonstrated that they have 3 or more projects engaged in the cleaning and repair of AFFF Tanks within a time period from 2007 to 2017.

D. PROPOSAL DOCUMENTS

1. The government shall rank all technically acceptable offers by total evaluated price. An offeror’s total evaluated price will be determined as follows: by multiplying the quantities identified in Section B by the proposed unit price for each Contract Line Item Number (CLIN). The offeror’s proposal shall represent the offeror’s best efforts to respond to the solicitation. All technically acceptable proposals will be evaluated for price reasonableness and then ranked by total evaluated price. Phase-In CLINs will be counted towards total evaluated price. Price is not assigned a rating; however, an assessment of reasonableness and affordability will be performed.

a. Price Reasonableness. The techniques and procedure described under FAR 15.404-1(b) will be the primary means of assessing proposal reasonableness. The evaluation techniques described under FAR 15.404-1(c), as determined appropriate, may also be performed in further determining reasonableness of the proposed price.

b. Affordability. The affordability assessment will also consider the total estimated contract price as compared to the projected budget for this project.

c. The burden of proof for cost affordability and reasonableness rests with the Offeror. Offerors are advised to clearly show justification for unique practices that significantly lower costs. An assessment that the proposal is not reasonable or affordable will result in the offer being unacceptable for award.