STATEMENT OF WORK - Dorm Curtains-Revised 24Aug11.doc
DOC document 33 KB Posted
- Attached to
- Supply/Install Blackout Curtains and Blinds
- Solicitation number
- F2P3E91203A001
About this file
Revised SOW following site visit on 23 Aug 11
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo - Dorm Curtains-Revised 24 Aug 11.doc | DOC document | |
| QA for Site Visit-Dorm Curtains.doc | DOC document | |
| FBO Version - Dorm Curtains Blinds.doc | DOC document | |
| Statement of Work - Dorm Curtains - F2P3E91203A001.pdf | ||
| Combo Dorm Curtains - F2P3E91203A001.pdf | ||
| STATEMENT OF WORK - Dorm Curtains Blinds Final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. DESCRIPTION OF PRODUCTS/SERVICES: Contractor shall deliver and install blackout curtains and blinds for 120 dormitory windows in Bldg. 919 on RAF Lakenheath. The Contractor shall furnish all personnel, equipment, tools, materials, supervision, transportation and all other items and services necessary to accomplish the requirements listed in the statement of work.
2. REQUIRMENTS
2.1 SUPPLIES:
2.1.1 Curtains: Supply 120 blackout curtains, 1760mm wide x 1320mm drop. Curtain fabric: shall be washable at 40 degrees, blackout lined, satin green in colour, Edmond Bell Crib (fire retardant) fabric, or commercial equivalent.
2.1.2 Supply 120 blinds, 1420mm wide x 1120mm long. Blinds: Venetian (horizontal), 35mm, metal, cream in color with plastic wand tilt controls.
2.2 INSTALLATION: Contractor shall remove existing window treatments and hardware and install new blinds and curtains on appropriate poles and rail provided by Contractor. Curtains: 28mm poles in chrome. Blinds: metal rail. Contractor shall repair holes left by existing window treatment removal and repair any damage to previous or new installation. Installation will be carried out within accordance to Manufacture Standards.
Dormitory rooms will be occupied during installation; escorts will be provided via the Dormitory Manager/POC.
3. DELIVERY:
3.1 Period of Performance: delivery and installation shall be completed within 120 calendar/business days from contract award.
3.2 Delivery and installation shall take place during the scheduled times and dates coordinated with the Governments POC, Dormitory Manager for building 919.
3.3 The point of contact for scheduling delivery and installation shall be Mr Kevin Norman on ext 01638522267.
4. QUALITY ASSURANCE:
The government shall periodically inspect the contractor during the performance period. Any discrepancies discovered shall be reported to the contractor for remedial action. Any remedial action shall be carried out prior to the performance period ending, or earlier depending on the nature of the discrepancy. The government representative shall have the final decision on the acceptance of work carried out, and any remedial action conducted.