The purpose of Amendment 0002 is to change verbiage within the combined synopsis/solicitation and to upload industry questions and answers.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The purpose of Amendment 0002 is to change verbiage within the combined synopsis/solicitation and to upload industry questions and answers.
b. Paragraph 8 has changed FROM:
The provision at 52.212-1, Instructions to Offerors – Commercial Items, applies to this acquisition.
ADDENDA TO 52.212-1 QUOTATION PREPARATION INSTRUCTIONS
(a) Period for Acceptance of Offers. The paragraph is tailored as follows: “The quoter agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of quotes.” The quoter shall make a clear statement in the quotation documentation that the pricing is valid until this date.
(b) To assure timely and equitable evaluation of quotations, quoters must follow the instructions contained herein.
Quoters are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Quoters must clearly identify any exceptions to the solicitation terms and conditions and provide complete accompanying rationale.
(c) Submission of quotes. Submit quotes, to include all fill- in clauses to the office specified in this solicitation at or before the exact time specified in this solicitation.
(d) Address any questions, clarifications or concerns you may via email to: SSgt Nick Griswold, nicholas.griswold@us.af.mil, (210) 652-9094 and provide a copy to Ms. Gina F. Garcia, gina.garcia@us.af.mil,
(210) 652-5131.
(e) Exceptions taken to terms and conditions of the RFQ, to any of its attachments, or to other parts of the RFQ shall be identified. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the RFQ. Failure to comply with the terms and conditions of the RFQ may result in the quoter being removed from consideration for award.
TO:
The provision at 52.212-1, Instructions to Offerors – Commercial Items, applies to this acquisition.
ADDENDA TO 52.212-1 QUOTATION PREPARATION INSTRUCTIONS
(a) To assure timely and equitable evaluation of quotations, quoters must follow the instructions contained herein.
Quoters are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Quoters must clearly identify any exceptions to the solicitation terms and conditions and provide complete accompanying rationale.
(b) Submission of quotes. Submit quotes, to include all fill- in clauses to the office specified in this solicitation at or before the exact time specified in this solicitation.
(c) Address any questions, clarifications or concerns you may via email to: SSgt Nick Griswold, nicholas.griswold@us.af.mil, (210) 652-9094 and provide a copy to Ms. Gina F. Garcia, gina.garcia@us.af.mil,
(210) 652-5131.
(d) Exceptions taken to terms and conditions of the RFQ, to any of its attachments, or to other parts of the RFQ shall be identified. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the RFQ. Failure to comply with the terms and conditions of the RFQ may result in the quoter being removed from consideration for award.
c. Paragraph 9(a)(1)(a) has changed FROM:
Sub Factor 1. Capability. The quoter shall complete the Guaranteed Daily Capability on page 2 of Attachments 2, 3, 4, 5 and 6 for each area in which the quoter proposes. Quotations not meeting minimum acceptable daily capability for an area as specified on page 2 of Attachments 2, 3, 4, 5 and 6 could indicate a lack of understanding concerning mission requirements shall result in the entire quotation being determined technically unacceptable or being eliminated.
TO:
Sub Factor 1. Capability. The quoter shall complete the Guaranteed Daily Capability on page 2 of Attachments 2, 3, 4, 5 and 6 for each area in which the quoter proposes. Quotations not meeting minimum acceptable daily capability for an area as specified on page 2 of Attachments 2, 3, 4, 5 and 6 could indicate a lack of understanding concerning mission requirements and shall result in the entire quotation being determined technically unacceptable or being eliminated.
d. SCHEDULE I, II, and III HOUSTON-QUESTIONS/ANSWERS
Question 1: Regarding the paragraph below from the Combined Synopsis, there are several items I want to bid 0 on since they are not used in completion of the contract. Will that result in rejection of my bid?
“The Government may determine that an quoter is unacceptable if the option prices are significantly unbalanced.
Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items or sub-line item(s) appear to be significantly overstated or understated as indicated by the application of cost or price analysis techniques. Therefore, a quotation may be rejected if the Contracting Officer determines the lack of balance poses an unacceptable risk to the Government. Evaluation of options shall not obligate the Government to exercise the option(s).”
Answer 1: The following paragraph of the combined synopsis/solicitation will explain what may happen if you quoted $0 for any section with an estimated quantity.
Paragraph 9 section 2(a)- “Total Evaluated Price: The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic year for each area. The quoter shall accurately complete the Bid Schedules (Reference Atchs 2-6) for the areas in which the quoter proposes for the basic and each option year. Incomplete Bid Schedules or quotations could indicate lack of understanding of the requirement and may result in the entire quotation being determined unacceptable and eliminated from further consideration.
Question 2: In the past fuel surcharge was added to certain line items however there is nothing noted in the solicitation this time. “SDDC fuel surcharge will apply to XX% of the unit price for this item”.
Answer 2: There is no Fuel Surcharge requirement in DTR 4500.9R, Part IV, Appendix G for DPM contracts.
Question 3: Full Replacement Value (FRV) was included in the past, but I don’t see that it is included this time around. Are we to bid it with FRV included?
Answer 3: Clause 252.247-7016 has hereby been removed and will not be incorporated in the resultant contract.
The guidance for claims and liability procedures found in attachment G6 of the PWS will be utilized in lieu of this clause.
e. All other terms and conditions remain unchanged.
| topmostSubform[0]: |
| Page1[0]: |
| IDCode[0]: |
| Page[0]: |
| Pages[0]: |
| AmendNo[0]: 0002 |
| EffDate[0]: Feb 19, 2015 |
| ReqNo[0]: F2MTJP5033AM02 |
| ProjNo[0]: |
| IssCode[0]: |
| IssuedBy[0]: 502 CONS/JBKCB |
395 B Street West, Suite 2, BLDG 224 Randolph AFB, TX 78150
| AdmCode[0]: |
| AdminBy[0]: Same as Block 6 |
| ContName[0]: |
| ContStrt[0]: |
| ContCnty[0]: |
| ContSt[0]: |
| ContZIP[0]: |
| Code[0]: |
| FacCode[0]: |
| SolChgYs[0]: Yes |
| SolChgNo[0]: Off |
| SolAmdNo[0]: F2MTJP5033AM02 |
| AmendDate[0]: |
| ModNo[0]: |
| ModDate[0]: |
| NoCopies[0]: |
| Amended[0]: Yes |
| OffrExt[0]: Off |
| OffrNoEx[0]: No |
| ApprData[0]: |
| ChgeOrd[0]: Off |
| ChgeOrder[0]: |
| Modify[0]: Off |
| SuppAgre[0]: Off |
| SuppAuth[0]: |
| ModOthr[0]: Off |
| OthrSpec[0]: |
| NoReq[0]: Off |
| Require[0]: No |
| Copies[0]: 1 |
| Descript[0]: The purpose of Amendment 0002 is to change verbiage within the combined synopsis/solicitation and to upload industry questions and answers. |
POC: SSgt Nick Griswold, nicholas.griswold@us.af.mil, 210-652-9094