Attachment 6 - Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES

RENV-Modify HVAC Sys to Increase Room Ventilation, B3260

01 14 00 SD-01 Preconstruction Submittals Glist of Contact Personnel

01 20 00.00 20 SD-01 Preconstruction Submittals

1.3 GSchedule of Prices

01 22 00.00 10 SD-03 Product Data GWeight Certificates

01 30 00 SD-01 Preconstruction Submittals

1.3 GView Location Map

1.4 GProgress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

Project Schedule CPM

GA

01 33 29 SD-01 Preconstruction Submittals GPreliminary Sustainability

Notebook Preliminary High Performance and Sustainable Building Checklist

SD-07 Certificates 1.4.5Third Party Certification (TPC)

SD-11 Closeout Submittals GFinal Sustainability Notebook GFinal High Performance and

Sustainable Building Checklist GAmended Final Sustainability

Notebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

FA3016-16-R-0079 Attachment 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES

01 33 29 3.2.1 GThird Party Certification Plaque and Certificates

01 35 29 SD-01 Preconstruction Submittals 1.5Accident Prevention Plan (APP)

GA

Asbestos Hazard Abatement Plan (for description see spec section 13280); GA

Lead Hazard Control Plan (for description see spec section

13281); GA.

1.6 GActivity Hazard Analysis (AHA)

GCrane Critical Lift Plan GCrane Operators

SD-06 Test Reports GAccident Reports

Crane Reports

GA

Monthly Exposure Reports Regulatory Citations and Violations

SD-07 Certificates Confined Space Entry Permit Hot work permit

01 35 30 SD-08 Manufacturer’s Instructions GSite Safety and Health Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES

01 35 30 SD-09 Manufacturer’s Field Reports Safety and Health Phase-Out Report

GA

01 35 35 SD-01 Preconstruction Submittals

1.6 GENVIRONMENTAL

PROTECTION PLAN

SD-02 Shop Drawings GAsbestos Work Plans GAsbestos Certifications GAsbestos Transporter License GAsbestos Medical clearances

(may be reviewed on site) GAsbestos Training Certificates GAsbestos TDSHS License as applicable GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

GAny Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

GLead Work Plans GLead Occupant Protection Plan.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES

01 35 35 GTexas Department of State Health Services Lead Licenses

GLead Notifications GLead Training Certificates GLead Based Paint Reports GLead Inspection reports

SD-03 Product Data GAsbestos Air Monitoring reports GLead Air Monitoring reports

SD-04 Samples GLead OSHA Negative Exposure

Assessment or GLead Work Plan.

EPA Lead Training GLead Awareness Training certificates GOSHA Air Monitoring GLead Training Certificates GWaste Disposal Plan, May be included in work plan GLead Inspection reports GLead Based Paint Reports

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan 01 45 00.00 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES

01 45 00.00 20 GContractor Quality Control (CQC) Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

GTraffic Control Plan SD-06 Test Reports Backflow Preventer Tests

SD-07 Certificates Backflow Tester

1.4Backflow Preventers 01 54 23.00 SD-01 Preconstruction Submittals

GFor each type of product indicated

01 62 35 SD-01 Preconstruction Submittals GBiobased Products

01 78 00 SD-01 Preconstruction Submittals GAs-Built Drawings

SD-02 Shop Drawings As-Built Record of Materials

FIO

SD-03 Product Data

1.4.1 GWarranty Management Plan

SD-04 Samples GWarranty Tags

01 91 13.00 23 SD-02 Shop Drawings GCommissioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES

01 91 13.00 23 GTraining Plan SD-03 Product Data

GPre-Functional Performance Test Schedule

GPre-Functional Performance Test Checklists

GStart-Up Performance Test Schedule

GStart-Up Performance Test Checklists

GFunctional Performance Tests Schedule

GFunctional Performance Tests SD-06 Test Reports

GProgress Report GFinal Summary Report

SD-07 Certificates GContractor Commissioning Agent

(CxC) SD-11 Closeout Submittals

GOwner's Personnel Training 23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data

2.7.1.1Metallic Flexible Duct Duct Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES

23 00 00 2.7.2 GDuct Access Doors

2.7.3 GManual Balancing Dampers

Diffusers Registers and Grilles

GVariable Volume, Single Duct Terminal Units

GReheat Units 1.4.6Test Procedures

GDiagrams SD-06 Test Reports

3.10 GPerformance Tests

3.8 GDamper Acceptance Test

SD-07 Certificates Bolts

1.4.7Certification SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation Instructions

3.12.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.12.1 GOperation and Maintenance

Manuals

2.7.3 GManual Balancing Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES

23 00 00 GConstant Volume, Single Duct Terminal Units

GVariable Volume, Single Duct Terminal Units

GReheat Units 23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture Lists

SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams 1.2Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data 2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials

2.5 GSupporting Elements

SD-05 Design Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GValve-Operating Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES

23 05 15 3.1 GSystem Operation Tests SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.4.3 GList of Qualified Permanent

Service Organizations

1.2 GListing of Product Installations

1.2 GRecords of Existing Conditions

SD-10 Operation and Maintenance Data

3.5 GOperation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings GInstallation Drawings GOutline Drawings

SD-03 Product Data GEquipment and Performance

Data GIsolators

SD-06 Test Reports GType of Isolator GType of Base GAllowable Deflection GMeasured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3 GRecords of Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES

23 05 93 1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2TAB team assistants 1.2TAB team engineer 1.5.3.2TAB Specialist 1.2TAB team field leader

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2Calibration 1.3.3Systems Readiness Check 1.5.4TAB Execution 1.5.4.3TAB Verification

SD-06 Test Reports GDALT and TAB Work Execution

Schedule GDALT and TAB Procedures

Summary

1.3.3 GDesign review report

1.6.2.1 GDesign review report

1.6.2 GPre-Final DALT report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES

23 05 93 3.3.5 GPre-Final DALT report

1.6.2 GFinal DALT report

3.3.8 GFinal DALT report

1.5.5.2 GTAB report for Season 1

1.5.5.2 GTAB report for Season 2

SD-07 Certificates

1.5.1 GIndependent TAB agency and

personnel qualifications

1.6.2 GDALT and TAB Submittal and

Work Schedule

1.3.3 GDesign review report

1.6.2.1 GDesign review report

1.6.2.3 GPre-field TAB engineering report

GAdvanced notice for TAB field work

GPrerequisite HVAC Work Check Out List

1.6.2 GAdvanced notice for Season 2

TAB field work

1.6.2 GPrerequisite HVAC Work Check

Out List For Season 2

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES

23 07 00 3.4Equipment Insulation Systems SD-03 Product Data Certification

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-04 Samples 2.2.1.2Thermal Insulation

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

23 09 23.13 20 SD-02 Shop Drawings

1.3.1.1 GControl system drawings title

sheet

1.3.1.2 GList of I/O Points

1.3.1.3 GControl System Components List

1.3.1.4 GControl system schematics

1.3.1.5 GHVAC Equipment Electrical

Ladder diagrams

1.3.1.6 GComponent wiring diagrams

1.3.1.7 GTerminal strip diagrams

1.3.1.8 GBACnet communication

architecture schematic

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES

23 09 23.13 20 SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.1.12 GBACnet Gateways

2.1.3 GBACnet Protocol Analyzer

2.1.2 GDDC Software

2.2 GSensors and Input Hardware

2.3 GOutput Hardware

2.4.2 GSurge and transient protection

SD-05 Design Data

3.5.2 GPerformance Verification Testing

Plan

3.5.4 GPre-Performance Verification

Testing Checklist SD-06 Test Reports

3.5.11 GPerformance Verification Testing

Report

SD-07 Certificates

1.5.6 GContractor's Qualifications

SD-09 Manufacturer’s Field Reports

3.5.1 GPre-PVT Checklist

SD-10 Operation and Maintenance Data

1.3 GBACnet Direct Digital Control

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES

23 09 23.13 20 3.4 GControls System Operators Manuals

SD-11 Closeout Submittals

3.6.1 GTraining documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR