Attachment_6_-_Schedule_of_Material_Submittals.pdf
PDF 93 KB Posted
- Attached to
- HVAC Modification Federal contract opportunity
- Solicitation number
- F2MRAA6015AW01
About this file
Attachment 6 - Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building_3260_Site_Visit_Pictures.pdf | ||
| FA3016-16-R-0079-0001.pdf | ||
| Attachment_11_-_Layout_Drawings.pdf | ||
| Attachment_9_-_Wage_Determination_02_September_2016.pdf | ||
| Government_Responses_Questions_1-2.pdf | ||
| Directions_to_Bldg_3260_From_Visitor_Center.pdf | ||
| Attachment_8_-_AETC_Form_47.pdf | ||
| Attachment_7_-_DD_Form_1354.pdf | ||
| Attachment_9_-_Wage_Determination_17_June_2016.pdf | ||
| Attachment_3_-_Division_09.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_10_-_Local_Information.pdf | ||
| Attachment_4_-_Division_23.pdf | ||
| Attachment_2_-_Division_01.pdf | ||
| FA3016-16-R-0079.pdf | ||
| Presolicitation_Notice.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES
RENV-Modify HVAC Sys to Increase Room Ventilation, B3260
01 14 00 SD-01 Preconstruction Submittals Glist of Contact Personnel
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GSchedule of Prices
01 22 00.00 10 SD-03 Product Data GWeight Certificates
01 30 00 SD-01 Preconstruction Submittals
1.3 GView Location Map
1.4 GProgress and Completion
Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals
Project Schedule CPM
GA
01 33 29 SD-01 Preconstruction Submittals GPreliminary Sustainability
Notebook Preliminary High Performance and Sustainable Building Checklist
SD-07 Certificates 1.4.5Third Party Certification (TPC)
SD-11 Closeout Submittals GFinal Sustainability Notebook GFinal High Performance and
Sustainable Building Checklist GAmended Final Sustainability
Notebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FA3016-16-R-0079 Attachment 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES
01 33 29 3.2.1 GThird Party Certification Plaque and Certificates
01 35 29 SD-01 Preconstruction Submittals 1.5Accident Prevention Plan (APP)
GA
Asbestos Hazard Abatement Plan (for description see spec section 13280); GA
Lead Hazard Control Plan (for description see spec section
13281); GA.
1.6 GActivity Hazard Analysis (AHA)
GCrane Critical Lift Plan GCrane Operators
SD-06 Test Reports GAccident Reports
Crane Reports
GA
Monthly Exposure Reports Regulatory Citations and Violations
SD-07 Certificates Confined Space Entry Permit Hot work permit
01 35 30 SD-08 Manufacturer’s Instructions GSite Safety and Health Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES
01 35 30 SD-09 Manufacturer’s Field Reports Safety and Health Phase-Out Report
GA
01 35 35 SD-01 Preconstruction Submittals
1.6 GENVIRONMENTAL
PROTECTION PLAN
SD-02 Shop Drawings GAsbestos Work Plans GAsbestos Certifications GAsbestos Transporter License GAsbestos Medical clearances
(may be reviewed on site) GAsbestos Training Certificates GAsbestos TDSHS License as applicable GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.
GAny Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.
GLead Work Plans GLead Occupant Protection Plan.
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES
01 35 35 GTexas Department of State Health Services Lead Licenses
GLead Notifications GLead Training Certificates GLead Based Paint Reports GLead Inspection reports
SD-03 Product Data GAsbestos Air Monitoring reports GLead Air Monitoring reports
SD-04 Samples GLead OSHA Negative Exposure
Assessment or GLead Work Plan.
EPA Lead Training GLead Awareness Training certificates GOSHA Air Monitoring GLead Training Certificates GWaste Disposal Plan, May be included in work plan GLead Inspection reports GLead Based Paint Reports
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan 01 45 00.00 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES
01 45 00.00 20 GContractor Quality Control (CQC) Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
GTraffic Control Plan SD-06 Test Reports Backflow Preventer Tests
SD-07 Certificates Backflow Tester
1.4Backflow Preventers 01 54 23.00 SD-01 Preconstruction Submittals
GFor each type of product indicated
01 62 35 SD-01 Preconstruction Submittals GBiobased Products
01 78 00 SD-01 Preconstruction Submittals GAs-Built Drawings
SD-02 Shop Drawings As-Built Record of Materials
FIO
SD-03 Product Data
1.4.1 GWarranty Management Plan
SD-04 Samples GWarranty Tags
01 91 13.00 23 SD-02 Shop Drawings GCommissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES
01 91 13.00 23 GTraining Plan SD-03 Product Data
GPre-Functional Performance Test Schedule
GPre-Functional Performance Test Checklists
GStart-Up Performance Test Schedule
GStart-Up Performance Test Checklists
GFunctional Performance Tests Schedule
GFunctional Performance Tests SD-06 Test Reports
GProgress Report GFinal Summary Report
SD-07 Certificates GContractor Commissioning Agent
(CxC) SD-11 Closeout Submittals
GOwner's Personnel Training 23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.7.1.1Metallic Flexible Duct Duct Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES
23 00 00 2.7.2 GDuct Access Doors
2.7.3 GManual Balancing Dampers
Diffusers Registers and Grilles
GVariable Volume, Single Duct Terminal Units
GReheat Units 1.4.6Test Procedures
GDiagrams SD-06 Test Reports
3.10 GPerformance Tests
3.8 GDamper Acceptance Test
SD-07 Certificates Bolts
1.4.7Certification SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation Instructions
3.12.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.12.1 GOperation and Maintenance
Manuals
2.7.3 GManual Balancing Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES
23 00 00 GConstant Volume, Single Duct Terminal Units
GVariable Volume, Single Duct Terminal Units
GReheat Units 23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture Lists
SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams 1.2Fabrication Drawings 3.1Installation Drawings
SD-03 Product Data 2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials
2.5 GSupporting Elements
SD-05 Design Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GValve-Operating Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES
23 05 15 3.1 GSystem Operation Tests SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
SD-10 Operation and Maintenance Data
3.5 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings GInstallation Drawings GOutline Drawings
SD-03 Product Data GEquipment and Performance
Data GIsolators
SD-06 Test Reports GType of Isolator GType of Base GAllowable Deflection GMeasured Deflection
23 05 93 SD-01 Preconstruction Submittals
1.3 GRecords of Existing Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES
23 05 93 1.3.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2TAB team assistants 1.2TAB team engineer 1.5.3.2TAB Specialist 1.2TAB team field leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2Calibration 1.3.3Systems Readiness Check 1.5.4TAB Execution 1.5.4.3TAB Verification
SD-06 Test Reports GDALT and TAB Work Execution
Schedule GDALT and TAB Procedures
Summary
1.3.3 GDesign review report
1.6.2.1 GDesign review report
1.6.2 GPre-Final DALT report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES
23 05 93 3.3.5 GPre-Final DALT report
1.6.2 GFinal DALT report
3.3.8 GFinal DALT report
1.5.5.2 GTAB report for Season 1
1.5.5.2 GTAB report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB agency and
personnel qualifications
1.6.2 GDALT and TAB Submittal and
Work Schedule
1.3.3 GDesign review report
1.6.2.1 GDesign review report
1.6.2.3 GPre-field TAB engineering report
GAdvanced notice for TAB field work
GPrerequisite HVAC Work Check Out List
1.6.2 GAdvanced notice for Season 2
TAB field work
1.6.2 GPrerequisite HVAC Work Check
Out List For Season 2
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES
23 07 00 3.4Equipment Insulation Systems SD-03 Product Data Certification
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-04 Samples 2.2.1.2Thermal Insulation
SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
23 09 23.13 20 SD-02 Shop Drawings
1.3.1.1 GControl system drawings title
sheet
1.3.1.2 GList of I/O Points
1.3.1.3 GControl System Components List
1.3.1.4 GControl system schematics
1.3.1.5 GHVAC Equipment Electrical
Ladder diagrams
1.3.1.6 GComponent wiring diagrams
1.3.1.7 GTerminal strip diagrams
1.3.1.8 GBACnet communication
architecture schematic
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES
23 09 23.13 20 SD-03 Product Data
2.1.1 GDirect Digital Controllers
2.1.1.12 GBACnet Gateways
2.1.3 GBACnet Protocol Analyzer
2.1.2 GDDC Software
2.2 GSensors and Input Hardware
2.3 GOutput Hardware
2.4.2 GSurge and transient protection
SD-05 Design Data
3.5.2 GPerformance Verification Testing
Plan
3.5.4 GPre-Performance Verification
Testing Checklist SD-06 Test Reports
3.5.11 GPerformance Verification Testing
Report
SD-07 Certificates
1.5.6 GContractor's Qualifications
SD-09 Manufacturer’s Field Reports
3.5.1 GPre-PVT Checklist
SD-10 Operation and Maintenance Data
1.3 GBACnet Direct Digital Control
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES
23 09 23.13 20 3.4 GControls System Operators Manuals
SD-11 Closeout Submittals
3.6.1 GTraining documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .