Questions_and_Answers_for_F2M3CH6029AW07.docx
DOCX document 13 KB Posted
- Attached to
- Refrigerators and Microwaves
- Solicitation number
- F2M3CH6029AW07
About this file
Responses to questions included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_-_Amendment_01.docx | DOCX document | |
| Combined_Synopsis.docx | DOCX document | |
| Attachment_B_-_Salient_Characteristics_F2M3CH6029AW07.xlsx | XLSX spreadsheet | |
| Attachment_C_-_Statement_of_Work.pdf | ||
| Attachment_A_-_Building_Addresses_F2M3CH6029AW07.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for F2M3CH6029AW07
1. On the refrigerators, there is a part number listed, however, this part number is for a white fridge. The description states black. What color is required?
You can use part 3.6MFAE-TPX instead, according to the customer, which is for a black refrigerator.
2. On the microwave, part number NN-SN651B is for a Panasonic microwave. In the characteristics in Attachment B, there are some discrepancies. In Column E, it states 4.8 CF and in Column F it states 0.7 CF. A refrigerator combination exists that is a 4.8 CF and can have a 0.7 CF microwave, which plugs into the refrigerator with an integrated charging station.
This is fine as long as the refrigerator and microwave are separate, stand alone items.
3. Depending on the answer to question 2, is a dual charging station required?
No, it is not.
4. For freight purposes, will there be equipment available to unload the semi at the locations, or do we need a delivery with a lift?
No, a semi is not necessary. A lift will be required.
5. Is the government envisioning this product to be unloaded at a dock, then transported by the contractor to the buildings?
No, products will not be unloaded at a dock.