Attachment_C_-_Statement_of_Work.pdf

PDF 18 KB Posted

Attached to
Refrigerators and Microwaves
Solicitation number
F2M3CH6029AW07
Issued by

About this file

Attachment C - Statement of Work

View the file

Other files

File Type Posted
Combined_Synopsis_-_Amendment_01.docx DOCX document
Questions_and_Answers_for_F2M3CH6029AW07.docx DOCX document
Combined_Synopsis.docx DOCX document
Attachment_B_-_Salient_Characteristics_F2M3CH6029AW07.xlsx XLSX spreadsheet
Attachment_A_-_Building_Addresses_F2M3CH6029AW07.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C - STATEMENT OF WORK

MICRO/FRIDGES

NAVY DORMITORIES JBSA-LAK

1. DESCRIPTION OF SERVICES. T h e Contractor shall provide delivery and installation of Micro Fridges. The objective of this project is to acquire Micro Fridges for the Navy Dorms at Lackland AFB TX. The units are new installations and require no furniture removal from the existing installations. All materials and accessories shall be installed in accordance with industry standards, manufacturer's recommendations.

2. LOCATION & POCs: Building 10070 & 10075 JBSA - Lackland, TX, located in San Antonio, TX. The address is 1250 Arnold Circle, Ste 1 JBSA – Lackland, TX, 78236. Points of Contact for this requirement will be identified at award.

3. PROJECT DESCRIPTION: This project requires the delivery and installation of Micro Fridges, model # 4.8MF-7tpw, JBSA-LAK Navy Dorm(s) Bldg. 10070 & 10075.

4. SITE DESCRIPTION: This project requires delivery and installation and testing of requested Micro Fridges in a three (3) story dormitory with outside access to the rooms and stairs on both ends and in the middle of the building. The building does not have elevators. There are three staircases in the building; one on each end and one central stairway.

5. STORAGE AND PARKING:

No contractor storage is required for this project. Parking shall be in the vicinity of the job site.

6. HOURS OF OPERATION: The delivery and installation shall be performed during normal duty hours (7:30 A M. to 4:15 P. M., Monday thru Friday).

7. WORKMANSHIP: The Contractor shall perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with the prevailing industry standards. Contractor shall be experienced in the specification, fabrication and installation of curtains appropriate for residential use.

8. ACCESSORIES AND INCIDENTALS: Contractor shall provide all incidentals necessary.

Cost for these items shall be included as part and parcel of the finished installation.

9. DEMOLITION: None is required.

10. INSTALLATION: The installation date shall be coordinated between the Contracting Officer, the end- user and the Housing Manager.

11. QUALITY ASSURANCE: The government shall inspect all work performed by the contractor. Work performance shall be deemed satisfactory and acceptable to the government when the Housing Manager declares the project satisfactory.

12. CLEANUP: The Contractor shall collect all trash, debris, refuse, garbage, etc., which he generates and remove it from the site.

13. PROTECTION: The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items at no additional cost to the government.

14. COMPLETION OF WORK: The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project.

15. ENVIRONMENTAL REQUIREMENTS: The contractor shall perform all work in accordance with federal, state, and local environmental regulations.