Acid fume hood and wet bench Alkaline fume hood and wet bench Specs.pdf
PDF 100 KB Posted
- Attached to
- Acid Wet Bench & Alkaline Wet Bench
- Solicitation number
- F2KBAD2088A001
About this file
Specifications for Acid and Alkaline Wet Benchs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Acid fume hood and wet bench Alkaline fume hood and wet bench Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIREMENTS FOR ACID FUME HOOD AND WET BENCH:
CLIN 0001
• WAFAB INTERNATIONAL MODEL 2007 POLYPROPYLENE WET BENCH (or equal)
• 36” wide x 40” deep x 75” tall of Polypropylene construction
• Polypropylene quick dump rinser with a four sided cascading inner weir (WAFAB International P/N: QDR-4561-01 or equal)
• Compact self-contained process controller capable of implementing several different rinsing techniques with indicators of the current system status. The controller must operate under time, liquid level, resistivity or a combination. (WAFAB International P/N: MPC-301-24 VAC Process controller or equal)
• Single point measurement system for solution conductivity and resistivity, with data transmitter
• Polypropylene sink 8” x8” x8”
• Gooseneck faucet
• De-ionized water (DIW) nozzle/gun set.
• Nitrogen (N2) gas nozzle/gun set.
• Base Carboy (WAFAB International P/N: Model 2000-0518-01 or equal)
• Operations manual
• Wrapped and clean room ready
REQUIREMENTS FOR ALKALINE FUME HOOD AND WET BENCH:
CLIN 0002
• WAFAB INTERNATIONAL MODEL 2007 POLYPROPYLENE WET BENCH (or equal)
• 36” wide x 40” deep x 75” tall of Polypropylene construction
• Polypropylene quick dump rinser with a four sided cascading inner weir (WAFAB International P/N: QDR-4561-01 or equal)
• Compact self-contained process controller capable of implementing several different rinsing techniques with indicators of the current system status. The controller must operate under time, liquid level, resistivity or a combination. (Model MPC-301-24 VAC Process controller or equl)
• Polypropylene sink 8” x8” x8”
• De-ionized water (DIW) nozzle/gun set.
• Nitrogen (N2) gas nozzle/gun set.
• Base Carboy (WAFAB International P/N: Model 2000-0518-01 or equivalent)
• Operations manual
• Wrapped and clean room ready
File details come from the government source that posted it. Updated .