F2GGA24087AQ01_Questions_and_Answers_(16Apr14).docx
DOCX document 16 KB Posted
- Attached to
- Repair HVAC at Ankara Commissary
- Solicitation number
- F2GGA24087AQ01
About this file
Questions Answers 16 April 2014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F2GGA24087AQ01_Questions_and_Answers_Part_II_(24Apr14).docx | DOCX document | |
| Ankara_Commissary_Combo_Synopsis_Solicitation.docx | DOCX document | |
| J A_for_Other_Than_Full_and_Open_Comp.pdf | ||
| Performance_Work_Statement_-_Repair_HVAC_at_Ankara_Commissary.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2GGA24087AQ01 – Repair HVAC at Ankara Commissary Questions & Answers (Q&A)
1. Q: Combined Synopsis/Solicitation page 1 (v) CLIN 0001 specifies only one (1) HVAC Unit price. On the otherhand, Performance Work Statement Item 1. specifies 2 each Alarko-Carrier Model 50UH065 Roof Top packaged heat pump units. Which one is correct?
A: We need two replacement Alarko-Carrier Model 50UH065 Roof Top packages. The 1 each that’s stated in CLIN 0001 combines both packages into one price.
2. Q: Are these new Alarko-Carrier Model 50UH065 Roof Top packaged heat pump Units standard model or not? Will they have any options?
A: The units will have supplemental electric heating, otherwise they are standard units.
3. Q: Performance Work Statement Item 3 B) specifies that the frames will only be cleaned, repaired and performed corrosion control as necessary. Will an additional modification be performed for the existing frames because of new HVAC Units' dimensions and the existing duct inlet and outlet conditions?
A: The frames will be reconditioned as per the CLIN but modification is not necessary. The new units were chosen for that reason.
4. Q: Performance Work Statement Item 3 C); During the connection of the power and control cabling, will the existing cable sizes meet the cable sizes specifications of new HVAC Roof Top Units? If no, the new cables should be installed from the main panel. We have to know app. the total cable length.
A: Control and power wiring and cables are of correct size as the new units are of the same size and capacity as the old units.
File details come from the government source that posted it. Updated .