Attachment C_Deliverables Table_LMTF.docx

DOCX document 47 KB Posted

Attached to
LMTF Services
Solicitation number
F2D0AC4193A101
Issued by

About this file

This document is an Attachment C - Deliverables Table that outlines the key deliverables required under a federal contract opportunity titled "LMTF Services".

The contract is being solicited by the Department of the Air Force Materiel Command Air Force Sustainment Center. The key deliverables include a Project Management Plan, Project Schedule, various meeting deliverables, a DOPAA, a Draft EA/FONSI, a Final EA/FONSI, and an Administrative Record. The deliverables have specified frequencies, formats, and submission requirements. The contract requires the contractor to travel to Hill AFB, Utah for a DOPAA Development Workshop and On-Board Review. The contractor will also be responsible for regulatory and agency coordination and consultation throughout the contract performance period.

View the file

Other files

File Type Posted
CIE EA_SOW Attachment C_Deliverables Table.pdf PDF
Combo_LMTF.pdf PDF
LMTF SOW.pdf PDF
Attach B DAF EIAP Format Guide_08162024_CIE FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Attachment C – EA Deliverables Table

Task
Deliverable #
Deliverable Description
Frequency
# of Copies &

Format Submit To

Task 1: Project Management

Task 1.1 - Contractor’s Progress, Status, and Management Report

Deliverable 1.1
Project Management Plan (20 pages maximum)

Monthly Contractor’s Progress, Status, and Management Report

· Project Management Plan due 3 weeks after Kick-off.

· First submittal due no later than 30 calendar days after award.

· Subsequent submittals shall be monthly and are due no later than 20 calendar days after the end of the Contractor's cost accounting period

Electronic
· Contracting Officer’s Representative (COR)
Task 1.2 –– Project Schedule
Deliverable

1.2

Initial project schedules and updates that include identification of planned and actual dates.
· Initial project schedules will be presented during the post award/kickoff meeting.

· Updated as needed

Electronic as needed
· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 2: Meetings

Task 2.1 - Post-Award Kickoff / Planning Meeting
Deliverable

2.1

Virtual kickoff meeting to initiate the contract and obtain project POCs, and plan for data gap identification/data collection, project coordination meetings, and in-person DOPAA Development Workshop/data collection visit
· Once

· Agenda items and presentation materials will be provided at least three (3) days prior to kick-off meeting.

1 Virtual Meeting

Electronic as needed

· COR

Task 2.2 - Data Gap Identification / Data Collection
Deliverable

2.2

Identify and collect all relevant data. Upon conclusion of the project site review and data collection effort and if necessary, the Contractor shall submit a list of data gaps needing to be supplied by DAF personnel.
· Once following Post-Award Kickoff / Planning Meeting
Electronic as needed
· COR
Task 2.3 - Coordination Meetings / Teleconferences
Deliverable

2.3

The Contractor shall prepare the agenda, minutes, and presentation materials for project coordination review meetings / teleconferences twice (2) per month.
· Bi-weekly

· Agenda items and presentation materials will be provided at least two (2) days prior to meeting

Electronic as needed
· COR
Task 2.4 – DOPAA Development Workshop / On-Site Data Collection
Deliverable 2.4
Contractor shall travel to Hill AFB, Utah for a DOPAA Development Workshop.
· Once, as scheduled
Site Visit
· COR
Task 2.5- On-Board Review (OBR)
Deliverable 2.5
The Contractor shall support OBR as Described in Task 2.5
· Once, as required by project schedule

Electronic as needed

· COR

Task 3: Project Coordination and Consultations

Task 3.1 – Regulatory and Professional Interface
Deliverable 3.1
The Contractor shall assist with oral/written interaction with interested parties related to the project.
· As required
Electronic as needed
· COR
Task 3.2 – Coordination and Consultation POC List
Deliverable 3.2
The Contractor shall identify key stakeholders and create a project POC list.
· As needed / required by project schedule
Electronic as needed
· COR
Task 3.3 – Interagency / Intergovernmental / Government-to-Government Coordination and Consultation
Deliverable

3.3

The Contractor shall prepare appropriate coordination and consultation letters and mail letters requiring read receipts.
· As required by SOW and project schedule
Electronic as needed

Hardcopies for mailing

· COR

Task 4: DOPAA

Task 4.1 – Preliminary Draft DOPAA
Deliverable 4.1
The Contractor shall provide a Preliminary Draft DOPAA for review and comment.
· Once, as required by project schedule
Electronic
· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 4.2 – Coordination & Consultation Letters
Deliverable 4.2
As described in SOW Task 3.3
· As described in SOW Task 3.3
Electronic as needed

Hardcopies for mailing

· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 5: Draft EA / FONSI

Task 5.1 – Preliminary Draft EA / FONSI
Deliverable 5.1
The Contractor shall provide a Preliminary Draft EA / FONSI for review and comment.
· Once, as required by project schedule
Electronic
· COR
Task 5.2 – Preliminary Draft EA / FONSI OBR
Deliverable 5.2
The Contractor shall prepare for and conduct an OBR to resolve Preliminary Draft EA / FONSI comments.
· Once, as required by project schedule
1 Virtual Meeting

Electronic as needed

· COR

Task 5.3 – Draft EA / FONSI for Public Comment Period
Deliverable 5.3
The Contractor shall provide a Draft EA / FONSI to be published for public review and comment
· Once, as required by project schedule
Electronic as needed

DVD/CDs

3 Hardcopies for libraries

· COR

Task 5.4 – Draft EA / FONSI NOA, Newspapers
Deliverable 5.4
The Contractor shall prepare and publish a Draft EA NOA.
· Once, as required by SOW and project schedule
Electronic

2 Newspapers

· COR

Task 5.5 – Draft EA / FONSI Coordination & Consultation Letters
Deliverable 5.5
As described in SOW Task 3.3
· As described in SOW Task 3.3
Electronic as needed

Hard copies for mailing

· COR

Task 6: Final EA / FONSI

Task 6.1 – Preliminary Final EA / FONSI
Deliverable 6.1
The Contractor shall provide a Preliminary Final EA / FONSI for review and comment.
· Once, as required by project schedule
Electronic
· COR
Task 6.2 – Final EA / FONSI for Signature
Deliverable 6.2
The Contractor shall provide a Final EA / FONSI to be staffed for DAF signature
· Once, as required by project schedule
Electronic as needed

3 DVD/CDs 3 Hard Copies

· COR

Task 6.3 – Final EA / Signed FONSI Newspapers
Deliverable 6.3
The Contractor shall prepare and publish a Draft EA NOA.
· Once, as required by SOW and project schedule
Electronic

2 Newspapers

· COR

Task 7: Administrative Record

Task 7.1 – Final AR
Deliverable 7.1
The Contractor shall prepare a searchable electronic AR on DVD/CD-ROM.
· Once, within 30 days after FONSI signature
Electronic as needed

3 DVD/CD

· COR

Note: Days refer to working / business days and exclude Saturdays, Sundays, and Federal holidays unless otherwise authorized by the Contracting Officer.