Attachment C_Deliverables Table_LMTF.docx

DOCX document 47 KB Posted

Attached to
LMTF Services
Solicitation number
F2D0AC4193A101
Issued by

About this file

This document is an Attachment C - Deliverables Table that outlines the key deliverables required under a federal contract opportunity titled "LMTF Services".

The contract is being solicited by the Department of the Air Force Materiel Command Air Force Sustainment Center. The key deliverables include a Project Management Plan, Project Schedule, various meeting deliverables, a DOPAA, a Draft EA/FONSI, a Final EA/FONSI, and an Administrative Record. The deliverables have specified frequencies, formats, and submission requirements. The contract requires the contractor to travel to Hill AFB, Utah for a DOPAA Development Workshop and On-Board Review. The contractor will also be responsible for regulatory and agency coordination and consultation throughout the contract performance period.

View the file

Other files

File Type Posted
LMTF SOW.pdf PDF
CIE EA_SOW Attachment C_Deliverables Table.pdf PDF
Combo_LMTF.pdf PDF
Attach B DAF EIAP Format Guide_08162024_CIE FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Attachment C – EA Deliverables Table

Task
Deliverable #
Deliverable Description
Frequency
# of Copies &

Format Submit To

Task 1: Project Management

Task 1.1 - Contractor’s Progress, Status, and Management Report

Deliverable 1.1
Project Management Plan (20 pages maximum)

Monthly Contractor’s Progress, Status, and Management Report

· Project Management Plan due 3 weeks after Kick-off.

· First submittal due no later than 30 calendar days after award.

· Subsequent submittals shall be monthly and are due no later than 20 calendar days after the end of the Contractor's cost accounting period

Electronic
· Contracting Officer’s Representative (COR)
Task 1.2 –– Project Schedule
Deliverable

1.2

Initial project schedules and updates that include identification of planned and actual dates.
· Initial project schedules will be presented during the post award/kickoff meeting.

· Updated as needed

Electronic as needed
· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 2: Meetings

Task 2.1 - Post-Award Kickoff / Planning Meeting
Deliverable

2.1

Virtual kickoff meeting to initiate the contract and obtain project POCs, and plan for data gap identification/data collection, project coordination meetings, and in-person DOPAA Development Workshop/data collection visit
· Once

· Agenda items and presentation materials will be provided at least three (3) days prior to kick-off meeting.

1 Virtual Meeting

Electronic as needed

· COR

Task 2.2 - Data Gap Identification / Data Collection
Deliverable

2.2

Identify and collect all relevant data. Upon conclusion of the project site review and data collection effort and if necessary, the Contractor shall submit a list of data gaps needing to be supplied by DAF personnel.
· Once following Post-Award Kickoff / Planning Meeting
Electronic as needed
· COR
Task 2.3 - Coordination Meetings / Teleconferences
Deliverable

2.3

The Contractor shall prepare the agenda, minutes, and presentation materials for project coordination review meetings / teleconferences twice (2) per month.
· Bi-weekly

· Agenda items and presentation materials will be provided at least two (2) days prior to meeting

Electronic as needed
· COR
Task 2.4 – DOPAA Development Workshop / On-Site Data Collection
Deliverable 2.4
Contractor shall travel to Hill AFB, Utah for a DOPAA Development Workshop.
· Once, as scheduled
Site Visit
· COR
Task 2.5- On-Board Review (OBR)
Deliverable 2.5
The Contractor shall support OBR as Described in Task 2.5
· Once, as required by project schedule

Electronic as needed

· COR

Task 3: Project Coordination and Consultations

Task 3.1 – Regulatory and Professional Interface
Deliverable 3.1
The Contractor shall assist with oral/written interaction with interested parties related to the project.
· As required
Electronic as needed
· COR
Task 3.2 – Coordination and Consultation POC List
Deliverable 3.2
The Contractor shall identify key stakeholders and create a project POC list.
· As needed / required by project schedule
Electronic as needed
· COR
Task 3.3 – Interagency / Intergovernmental / Government-to-Government Coordination and Consultation
Deliverable

3.3

The Contractor shall prepare appropriate coordination and consultation letters and mail letters requiring read receipts.
· As required by SOW and project schedule
Electronic as needed

Hardcopies for mailing

· COR

Task 4: DOPAA

Task 4.1 – Preliminary Draft DOPAA
Deliverable 4.1
The Contractor shall provide a Preliminary Draft DOPAA for review and comment.
· Once, as required by project schedule
Electronic
· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 4.2 – Coordination & Consultation Letters
Deliverable 4.2
As described in SOW Task 3.3
· As described in SOW Task 3.3
Electronic as needed

Hardcopies for mailing

· COR

· AFNWC POC

· 75 CEG/CEIE POC

Task 5: Draft EA / FONSI

Task 5.1 – Preliminary Draft EA / FONSI
Deliverable 5.1
The Contractor shall provide a Preliminary Draft EA / FONSI for review and comment.
· Once, as required by project schedule
Electronic
· COR
Task 5.2 – Preliminary Draft EA / FONSI OBR
Deliverable 5.2
The Contractor shall prepare for and conduct an OBR to resolve Preliminary Draft EA / FONSI comments.
· Once, as required by project schedule
1 Virtual Meeting

Electronic as needed

· COR

Task 5.3 – Draft EA / FONSI for Public Comment Period
Deliverable 5.3
The Contractor shall provide a Draft EA / FONSI to be published for public review and comment
· Once, as required by project schedule
Electronic as needed

DVD/CDs

3 Hardcopies for libraries

· COR

Task 5.4 – Draft EA / FONSI NOA, Newspapers
Deliverable 5.4
The Contractor shall prepare and publish a Draft EA NOA.
· Once, as required by SOW and project schedule
Electronic

2 Newspapers

· COR

Task 5.5 – Draft EA / FONSI Coordination & Consultation Letters
Deliverable 5.5
As described in SOW Task 3.3
· As described in SOW Task 3.3
Electronic as needed

Hard copies for mailing

· COR

Task 6: Final EA / FONSI

Task 6.1 – Preliminary Final EA / FONSI
Deliverable 6.1
The Contractor shall provide a Preliminary Final EA / FONSI for review and comment.
· Once, as required by project schedule
Electronic
· COR
Task 6.2 – Final EA / FONSI for Signature
Deliverable 6.2
The Contractor shall provide a Final EA / FONSI to be staffed for DAF signature
· Once, as required by project schedule
Electronic as needed

3 DVD/CDs 3 Hard Copies

· COR

Task 6.3 – Final EA / Signed FONSI Newspapers
Deliverable 6.3
The Contractor shall prepare and publish a Draft EA NOA.
· Once, as required by SOW and project schedule
Electronic

2 Newspapers

· COR

Task 7: Administrative Record

Task 7.1 – Final AR
Deliverable 7.1
The Contractor shall prepare a searchable electronic AR on DVD/CD-ROM.
· Once, within 30 days after FONSI signature
Electronic as needed

3 DVD/CD

· COR

Note: Days refer to working / business days and exclude Saturdays, Sundays, and Federal holidays unless otherwise authorized by the Contracting Officer.